| 1 | 1₹6.8 LAccepted-AOC KAROOKKIL HOUSE NARIKKUNI P O KOZHIKODE | KOZHIKODE | KOZHIKODE | KERALA | ₹6.8 L | 1 | Accepted-AOC LOWEST L1 |
| 2 | 2₹7.2 LRejected-AOC KORANGAD HOUSE THAMARASSERY P O KOZHIKODE PIN 673573 | KOZHIKODE | KOZHIKODE | KERALA | 673573 | ₹7.2 L | 2 | Rejected-AOC L2 |
| 3 | 3₹7.6 LRejected-AOC KUNDACHALIL HOUSE VAVAD P O KODUVALLY KOZHIKODE PIN 673572 | KOZHIKODE | KOZHIKODE | KERALA | 673572 | ₹7.6 L | 3 | Rejected-AOC L3 |
Tender Value
₹7.7 L
EMD Value
₹19,400
Closing Date
21 Mar 2026, 3:00 pmClosed
Executive Engineer, PMU, Kozhikode.
Executive Engineer, Project Management Unit,Vydhyuthi Bhavanam,Kozhikode
Interlinking Karayathingal to Mukkadangad using 11kV OH Raccoon Conductor under Electrical section Narikkuni
2026_KSEB_845469_1
PMU/KKD/e Tender/15/2025 26 Dtd 09 03 2026
Open Tender
Electrical Works
180 days
Narikkuni
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,888
₹19,400
30 Apr 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
21 Mar 2026
11 Mar 2026
Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.
Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
Drilling hole of various sizes on existing Channel/Cross Arm.
Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
Cutting trees having girth beyond 60cm but upto and including 120cm, in between the line and Buildings where space for falling trees is not available/enough (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.
Providing one Coil Earth using No.8 GI earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil.
Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials.
Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil.
Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil.
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).
Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427995.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Biddocument_Raccoon.pdf
Tender Documents • 1.26 MB
BOQ_1427995.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid