| 1 | L1₹2.2 CrAccepted-AOC PLOT NO 13 THIRD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | ₹2.2 Cr | L1 | Accepted-AOC BID ACCEPTED BEING OVERALL REASONABLE |
| 2 | L2₹2.4 CrRejected-Finance MATERE HOUSE SEC NO 14 PRADHIKARAN PUNE MAHARASHTRA INDIA 412105 | PUNE | MAHARASHTRA | 412105 | ₹2.4 Cr | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹2.4 CrRejected-Finance VIKASH NAGAR RAMGARH CANTT WARD NO 06 PO PS DISTT RAMGARH JHARKHAND PIN 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | ₹2.4 Cr | L3 | Rejected-Finance Other than L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical NOT recommended for opening of F-Bid since, Not meeting Eligibility criteria. |
| Sl No | Description | Qty | Unit | M/S ROHIT CONSTUCTION L3 | V M MATERE INFRASTRUCTURES INDIA PVT LTD L2 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD L1 |
|---|---|---|---|---|---|---|
| 2.00SCHEDULE "A" : | ||||||
| 3.00 | Item No 01 : Taking down old Single /Three phase Energy Meter from any location and deposit to MES store all as specified and directed by Engineer-in-Charge.
Note 1 :- The Quoted rate shall deemed to be inclusive of following parameters: -
(a) Meter reading record shall be submitted before and after replacement duly signed by the rep of contractor, MES and indl user.
(b) Old meters should be deposit to MES AGE E/M store yard. | 1,278 | Each | 75 ₹95,850 | 200 ₹2.6 L | 141.6 ₹1.8 L |
| 4.00(c) Any re-joining of wires /cables shall be done using suitable ferrule /cable connectors after removal of meter and cost of same shall be deemed to be included in the quoted rates. Note 2 :- Contractor should ensure the following before taking down the existing meter:- (a) Cloud based vending portal management should be installed and proper functional. (b) Advanced metering sytem of meter for two way communication between utilities and consumers. (c) All system regarding function of smart meter should be installed and fuctional before taking down. | ||||||
| 5.00Item No 02: Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) comprising of performing site survey, deciding/suggesting and setting up the communication network in such a way that service level agreement related to data availability/connectivity of the consumers are achieved. The design should be in such a way that it shall include smart meters of different makes ( not more than 33% of a particular make to ensure interchangeability at a later date as per BIS 16444). It will include the following components:- | ||||||
| 6.00 | Item No 02.1 : Supply, installation, testing and commissioning single phase smart electric meter having applicable standard complying with BIS marked IS-16444 : 2015 (Reaffirmed 2020) for all requirement reference voltage 240 Volts, current rating 10-60 Amps, UC1, category, complying of IS 16444 Part-I to starting current, accuracy class 1.0, limits of error, frequency, influence quantities, power consumption of meter, current and voltage circuit running at no load, test output device, meter display , name plate and making meter display, LED/LCD indicators, measuring element, Alarm, Load control, status of load switch, programmability, communication, date exchange protocol, real time clock (RTC), data retention, first breath (power on) and last gap (power off) condition detection and communication to HES, data display facility. | 1,196 | Each | 9,600 ₹1.1 Cr | 5,500 ₹65.8 L | 5,122.8 ₹61.3 L |
| 7.00Complying to IS 13779 for operating temperature range, humidity complying to IS-15959 part-II for parameters to be measured, max demand resetting, time of use registers, power quality information, load survey/ internal data, tamper / event recording, Alarm, remote firmware, RTC (Part-II also IS15959). Anti tamper feature as per IS-1959 Part-II. The meter shall be supplied with edequate battery backup for RTC, must have a dedicated sealable slot for accomodation plug-in type bi-directional communication modules which shall integrate the respective communication tech with smart meter, leading to easy adaptability for network interfaces (WAN/NAN). including transparent polycarbonate Meter box complying to IS-14772 suitable for single phase smart Meter having sealable optical port provision on the cover of the meter box conform to IP-54 protection with push fit and hinge type including fixing arrangement such as nut, bolt, washer etc. | ||||||
| 8.00Meter should support communication protocol through (RF/GPRS/Hybrid(GPRS+RF) ) with the software all as required at site and directed. In case of Cellular based meter, the meter shall accommodate SIM card of any service provider. Contractor have to bear the monthly rentals/ data charges for SIM/e-SIM using the network of Mobile service provider , mapping, vending portal charges etc for every meter for 2 Years in case. in case of RF meters cost of DCU, Signal boosters including network management and head end system for the project area shall also be included in this item and in case of Hybrid system all hardware/software component also. The plug-in module shall be field swappable / replaceable. | ||||||
| 9.00The meter shall continue working under tamper condition and would log teh event and send alarm at HES (Head End System) after dedection of the defined tamper features. The minimum data display should include minimum of the following:- 1. Data display shall be in two mades:- (a) Auto Scroll (b) Scroll with push button 2. The display parameter shall be :- (a) Auto scroll (b) Display check (c) Date and time (d) Last recharge amount (e) Last recharge time (f) Current Balance amount (g) Current balance days left (h) cummulative active energy KWH with legend (j) Current calender month MD in KW with legend (k) Instantaneues Voltage (l) Instantaneues phase current (m) Instantaneues load KW (n) Instantaneues average power factor. These parameter should be displayed on the meter display contineously for a period of 10 seconds on auto scroll. | ||||||
| 10.003. Scroll with push button : All parameters mentioned under auto scroll mode should be displayed additionally, the following parameters shall also be displayed:- (a) Internal diagnostic (display check) (b) meter serial number (c) last month commulative KWH with legends (d) Last month MD in KW with legends (e) currenct month average power factor (f) Last month average power factor. Further, the meter shall display high resolution energy values with resolution of 3 digit before decimal and 2 digit after decimal in push button mode. The meter display should return to default display mode (contineous auto scroll) if push button is not operated for more than 10 seconds. Meter display should go in sleep mode during power on condition in case the push button is not operated for more than 10 seconds | ||||||
| 11.00Notes (a) It would be possible to run the meter in both prepaid and postpaid mode. (b) The meters would carry 10 years warranty. (c) The meter should be suitable/run/operate with all approved software. Note : Any technical item missed out which is technically required for Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) as per E-in-C Branch policy No 12/2023 issued by E-in- C's Branch letter No A/37696/Gen/Pol/E2W(PPC) dt 30 Aug 2023 (uploaded on MES website) during the execution of work without any extra cost. | ||||||
Updated dates
Tender Value
₹2.7 Cr
EMD Value
₹3.5 L
Closing Date
29 Jan 2026, 6:00 pmClosed
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF SMART METERING SYSTEM AT VARIOUS PLACES UNDER THE AOR OF GE RAMGARH CANTT
2025_MES_737868_1
753013A PROVN OF SMART METERING SYSTEM AT VARIOUS PLACES UNDER THE AOR OF GE RAMGARH CANTT
Open Tender
Civil Works
4748 days
RAMGARH
AS PER NIT
8 documents required · 8 mandatory
₹2,000
Yes
GE RAMGARH
₹3.5 L
Yes
18 Jun 2026
18 Dec 2025
5 Feb 2026
18 Dec 2025
29 Jan 2026
15 Jan 2026
SCHEDULE "A" :
Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) comprising of performing site survey, setting up the communication network in such a way that service level agreement related to data availability/connectivity of the consumers are achieved. It shall include smart meters of different makes ( not more than 33% of a particular make to ensure interchangeability at a later date as per BIS 16444). It will include the following components:-
Item No 02 : Supply, installation, testing and commissioning single phase smart electric meter having applicable standard complying with BIS marked IS-16444 : 2015 (Reaffirmed 2020) for all requirement reference voltage 240 Volts, current rating 10-60 Amps, UC1, category, complying of IS 16444 Part-I to starting current, accuracy class 1.0, limits of error, frequency, influence quantities, power consumption of meter, current and voltage circuit running at no load, test output device, meter display , name plate and making meter display, LED/LCD indicators, measuring element, Alarm, Load control, status of load switch, programmability, communication, date exchange protocol, real time clock (RTC), data retention, first breath (power on) and last gap (power off) condition detection and communication to HES, data display facility.
Complying to IS 13779 for operating temperature range, humidity complying to IS-15959 part-II for parameters to be measured, max demand resetting, time of use registers, power quality information, load survey/ internal data, tamper / event recording, Alarm, remote firmware, RTC (Part-II also IS15959). Anti tamper feature as per IS-1959 Part-II. The meter shall be supplied with edequate battery backup for RTC, must have a dedicated sealable slot for accomodation plug-in type bi-directional communication modules which shall integrate the respective communication tech with smart meter, leading to easy adaptability for network interfaces (WAN/NAN). including transparent polycarbonate Meter box complying to IS-14772 suitable for single phase smart Meter having sealable optical port provision on the cover of the meter box conform to IP-54 protection with push fit and hinge type including fixing arrangement such as nut, bolt, washer etc.
Meter should support communication protocol through (RF/GPRS/Hybrid(GPRS+RF) ) with the software all as required at site and directed. In case of Cellular based meter, the meter shall accommodate SIM card of any service provider. Contractor have to bear the monthly rentals/ data charges for SIM/e-SIM using the network of Mobile service provider , mapping, vending portal charges etc for every meter for 2 Years in case. in case of RF meters cost of DCU, Signal boosters including network management and head end system for the project area shall also be included in this item and in case of Hybrid system all hardware/software component also. The plug-in module shall be field swappable / replaceable.
The meter shall continue working under tamper condition and would log teh event and send alarm at HES (Head End System) after dedection of the defined tamper features. The minimum data display should include minimum of the following:- 1. Data display shall be in two mades:- (a) Auto Scroll (b) Scroll with push button 2. The display parameter shall be :- (a) Auto scroll (b) Display check (c) Date and time (d) Last recharge amount (e) Last recharge time (f) Current Balance amount (g) Current balance days left (h) cummulative active energy KWH with legend (j) Current calender month MD in KW with legend (k) Instantaneues Voltage (l) Instantaneues phase current (m) Instantaneues load KW (n) Instantaneues average power factor. These parameter should be displayed on the meter display contineously for a period of 10 seconds on auto scroll.
3. Scroll with push button : All parameters mentioned under auto scroll mode should be displayed additionally, the following parameters shall also be displayed:- (a) Internal diagnostic (display check) (b) meter serial number (c) last month commulative KWH with legends (d) Last month MD in KW with legends (e) currenct month average power factor (f) Last month average power factor. Further, the meter shall display high resolution energu values with resolution of 3 digit before decimal and 2 digit after decimal in push button mode. The meter display should return to default display mode (contineous auto scroll) if push button is not operated for more than 10 seconds. Meter display should go in sleep mode during power on condition in case the push button is not operated for more than 10 seconds
Notes (a) It would be possible to run the meter in both prepaid and postpaid mode. (b) The meters would carry 10 years warranty. (c) The meter should be suitable/run/operate with all approved software. Note : Any technical item missed out which is technically required for Design, supply, installation, testing, commissioning & integration of Advance Metering Infrastructure (AMI) as per E-in-C Branch policy No 12/2023 issued by E-in- C's Branch letter No A/37696/Gen/Pol/E2W(PPC) dt 30 Aug 2023 (uploaded on MES website) during the execution of work without any extra cost.
Item No 03 : All as per Srl Item No. 2.1 above but for three phase, 4 wires 10 - 60 Amps Smart Energy Meter complete all as specified and directed.
Item No 04 : Supply and Configuration of the Web based Software to integrate /configuration of smart meter with following modules and hosting the system to GCC for management of supplied software application: (i) Meter Data Management Module :-The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system
(iv) Web site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android / IOS mobiles app (for admin use). (v) Customer Portal:- The system would include a customer portal for the resident / to log in and view their own energy / billing data. There would be android and IOS mobile apps for the user to monitor its own data and balance on regular basis. (vi) Energy Accounting Module: - The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (vii) Communication Module:- The system would provide communication of energy data and bills via App notifications.
(xii) Cyber security of software:- The software provided for the smart prepaid meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates. (xiii) The AMISP/contractor will be responsible for making the entire AMI system including the service provider immune to Cyber Attacks, while taking care of following guidelines. (a) All the hardware, OS and application software shall be hardened. (b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability & security threats. (c) Date shall be encrypted at system/device/technology level. (d) While procuring cyber security items testing must be done and the system must be secure by design. (e) Residual information risk shall be calculated by contractor and same shall be submitted for perusal cyber audit teams. (f) Penetration & vulnerability assessment test from certified auditors during Field Acceptance Test (FAT). Site Acceptance test ( SAT) & operations and maintenance period.
(g) The system software of smart metering infrastructure may be designed to include prepayment mode recovery of license fee, hire charges for furniture , water charges etc and any other charges in consultation with Stn HQ , local audit representative and CFA, such software should have necessary fields and administrative login access for local authority to update the recovery rate from time to time.
(c) The software would be scalable and expandable for meters and system of different make complying with IS16444. (d) The software should strictly adhere to IS 15959 standard & must be compatible with atleast 3 makes of smart meters that are to be finalised as per above. (e) The software must be audited by CERT India empaneled firm/CERT auditor of Armed Forces and documentary proof of same must be produced at the time of commissioning. (f) The contractor must arrange/produce a MoU between AMISP and concerned GEs before commencement of work, for technical support ( Upgrading/updating software, troublshooting any kind of problems related to meter/software/communication etc) for 10 years after date of physical completion of work
(a) Remote smart meter data reading at configurable intervals (b) Acquision of meter data on demand. (c) Two way communication with meter (d) Command for connect and disconnect the smart meter. (e) Audit report and event alarm logging (f) Encryption of data for source communication. (g) Maintain time syn. with DCU/meter. (h) Store raw data for duration of one week. (j) Setting of smart meter configurable parameter. (k) Communication device status and history. (l) Critical and non critical meter event like tamper/power failure etc.
Note :(a) AMI software and associated equipment should be capable of handling 1500 Nos of meters of 03 different makes as per BIS 16444 with 25% expansion without any additional infrastructure and cost implication. (b) in case superior specification of server are required as per the requirement on ground, the contractor shall provide the same without any extra cost. (c) Cyber security clearance for server and software and any other instruction which has been missed out but technically required to be done by the contractor as per the policy No 12/2023 issued by E-in-C's Branch letter No A/37696/Gen/Pol/E2W(PPC) dt 30 Aug 2023 (Uploaded on MES web site) during the execution of work without any extra cost.
would capture and provide the following data: (a) Real time energy monitoring with 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly billing survey data for Cumulative energy and max demand (ii) Prepayment/Billing Module: The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption.
, meter recharge, report/record generation etc. (b) Regular updation of tariff rate in the system as per govt policies. (c) Registering any problem that may occur in the network and co-ordinating for smooth functioning of the system.
Item No 06 : S & F desktop computer with the following specifications complete all as specified and directed by Engr-in-Charge. Software parameters:- (a) 8GB RAM, DDR4 RAM with Windows 10 Opearting System or higher version (b) Intel processor with 8th Gen core i5 processor with min speed of 1.3 GHz (c) hard disk 1TB Hardware Parameters:- (d) screen size of min 15 inches (e) minimum of 2 USB Ports (f) with 1 keyboard and mouse (g) UPS of min. 1KVA for backup Make: Dell, HP, Compaq
Item No 15 : WORK UNDER PHASE-III Comprehensive operation and maintenance of system including project implementation &management, all expenditure including periodic charges of telecom operator, smart meter billing and maintenance after completion of defect liability period (phase II) till completion for 08 years extendable to further 02 years after mutual agreement complete all as specified & directed. The following items are also deemed to be included:-
Item No 08 : M & L for Sub main wiring for three phase with approved colour coding as per IS with four Nos single core PVC insulated FRLSh cable with stranded copper conductor of size 6 Sq mm nominal area and drawing into suitable size of PVC non metallic rigid heavy duty surface /recessed PVC conduit of white/ ivory colour and its accessaries ISI marked heavy duty of suitable size including concealed in wall etc one run of PVC insulated with 6.0 Sqmm (nominal area) stranded copper conductor FRLSh cable as earth wire complete all as specified and as directed. Note:- four runs of 6 sqmm cable( for phase and neutral) ,one run of 6 sqmm cable for earth and one run of PVC conduit including cutting chasing making good if required will be measured as one unit
Item No 10 : S&F in repair MCB DB TPN 4 way vertical type with suitable Amp rating 415V rated copper bus bar in sheet metal enclosure, double door type complete all as specified and directed by Engr-in-Charge.
Outgoing (a) Compartment Feeder - 4 Nos (b) 32 A 3 Pole MCB - 04 Nos (c) (Busbar) Electrolytic tined copper strip for 100 A TPN with R,Y,B & N Colour coding heat shrinkable sleeves.- SET, (d) Nuts, Bolts, washers, ferrule numbers, cable ties, tie base, copper PVC control wire power wire, copper thimbles, panel locks, I-Hooks, PVC tape, insulators E-type, L-Type, round type, MCB, Channel, PVC, Channel connector, channel, connector etc. - One SET. Note: Contractor must submit GA drawings for approval prior to commencement of work.
Item No 11 : S&F in repair metering panel of size 900x800x300 mm, manufacturing cubical type body made out of 2 mm CRCA/HR sheet, totally enclosed, dust and vermin proof indoor type suitable for operation on 03 phase and neutral 415 V, 50 Hz AC system (04 metres) including testing and refixing of old meters, complete all as specified and as directed inclusive of the following:- Incoming : (a) 63A 4 pole 16 kA MCCB adjustable type thermal magnetic setting - 01 No. (b) Rotary handle extended - 01 No. (c)3 Phase 4 wire digital type voltmeter - 01 No. (d) 3 Phase 4 wire digital type Ampere meter - 01 No. (e) R-Phase indicator Lamp 'RED' - 01 No (f) Y- Phase indication Lamp 'YELLOW' - 01 No (g) B - Phase indication Lamp 'BLUE' - 01 No. (h) Tape wound CT-60/5A, Class:I, 5VA, ID:35 - 03 Nos.
Item No 07 : Supply and fixing of black and white laser printer with print, scan & copy function having USB connection with printing speed of min 40 pages per minute for printing report.
Item No 12 : S&F in repair metering panel of size 900x800x300 mm, manufacturing cubical type body made out of 2 mm CRCA/HR sheet, totally enclosed, dust and vermin proof indoor type suitable for operation on 03 phase and neutral 415 V, 50 Hz AC system (04 metres) including testing and refixing of old meters, complete all as specified and as directed inclusive of the following:- Incoming : (a) 63A 4 pole 16 kA MCCB adjustable type thermal magnetic setting - 01 No. (b) Rotary handle extended - 01 No. (c)3 Phase 4 wire digital type voltmeter - 01 No. (d) 3 Phase 4 wire digital type Ampere meter - 01 No. (e) R-Phase indicator Lamp 'RED' - 01 No (f) Y- Phase indication Lamp 'YELLOW' - 01 No (g) B - Phase indication Lamp 'BLUE' - 01 No. (h) Tape wound CT-60/5A, Class:I, 5VA, ID:35 - 03 Nos.
Unit rate in figures to be entered by the Bidder with Taxes (Rs.)
Each Per meter Per month
(d) Deploying all measures for corrective actions as and when required (d) Acting as a link between users and the parent company providing the metering system. (e) Providing hands on training to the MES personnel as and when required. (f) Collecting cash in case of offline recharge, offline/online payment details etc and handing over to the MES rep. (g) To provide any other associated technical support.
Item No 14 : PHASE- II Provision for comprehensive operation including periodic charges of telecom operator, smart meter billing from completion of work till the completion of defect liability period of 02 years complete all as specified & directed. The duties shall also include the following:- (a) Managing vending Station activities like offline recharge in case of any bug in online recharge system
(h) Running and maintaining vending station. (j) Any other work and Any other charges to maintain complete AMI required to maintain the complete system efficiently. Note: This item shall be operative on declaring all meters commissioned.
(a) Monthly sim/internet rental charges for the DCU/Gateway/ or any communication system . The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would arrange broadband internet connection. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (c) Software AMC. This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software would support all the changes. (d) Changes in the government tariff structure. The government tariff structure changes may require software upgrade. The same would be included in the AMC scope of work.
(e) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (f) Reports Development - The additional reports as needed for the success of the project would be developed (g) Software installation on any alternate / backup server if required (h) The communication network monitoring and support (i) Configuration of the repaired / replaced hardware in the system
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
TENDER.pdf
Tender Documents • 3.93 MB
BOQ_834334.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid