Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
13 May 2022, 5:00 pmClosed
CE RnD DELHI
CE RnD DELHI DELHI 110054
CONSULTANCY FOR AIR CONDITIONING
2022_MES_519240_1
31000/QTN/01/E3 DATE 21 APRIL 22
Limited
Consultancy Services
Works
45 days
CHANDIPUR
AS PER NIT
4 documents required · 4 mandatory
₹0
Exempted
24 May 2022
21 Apr 2022
18 May 2022
21 Apr 2022
13 May 2022
29 Apr 2022
21 Apr 2022 - 28 Apr 2022
Amount
(i) Consultancy services for design of Central Air Conditioning (HVAC) system for MPO and TTD bldg ITR under GE (I) R&D Chandipur. Areas to be air conditioned and scope of HVAC will be as per Administrative Approval. The approximate capacity of plant shall be (a) 70 TR running & 35 TR stand by, (b) 60 TR running & 30 TR stand by. Inside conditions will be considered as given below. (Authority : User data sheet fwd by Tech Officer - D works, ITR Chandipur vide letter No. Nil dated 12 Apr 2022. (a) Dry Bulb Temperature : 22+ 3 0C (b) Relative Humidity : 50% + 5% (c) If recirculation is permitted No of person air changes per hour : Yes, 4 fresh Air changes per hour to be specified (d) Occupation (state max and minimum figures) : 30/20 persons active (e) Total equipment load in KW inside the AC : 34.8 KW (lighting : 30 KW for TTD bldg + 40 KW for MPO bldg Space.load (lighting load) : 5.0 KW for TTD bldg + 5.0 KW for MPO bldg (f) Size of dust parlicles permissible inside : 05 Microns (g) Acceptable noise level. : 40 Db (h) No of hours of running the AC plant : 24 hrs for TTD bldg, 24 hrs during mission activities & 8 hrs daily excet mission activities for MPO bldg.) (j) Whether winter heating and humidification : Yes (k) Required Heat output in Kcal per Hour or BTU per hour of stored : Nil material (if any). (l) Whether any explosive dust is floating in the air or bnoxious/toxic/ : NA explosiv/inflammable/hazardous gases/vapours are generated inside? Whether there is any special requirement of taking exhaust air (m) In order to estimate standby power requirement say whether the : Yes continuity of running of AC plants is mandatory. Any other remarks (ii) Preparation of architectural plan of building to be Air Conditioned and Plant Room based on actual site condition, on Auto CAD as required for design and development of HVAC system.
M/S EDIFICE INC
AAKAAR
Venu Consultants Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .