Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC NEAR PUBLIC HEALTH CENTER VENPALAVATTOM ANAYARAP O THIRUVANANTHAPURAM 695029 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695029 | L1 | Accepted-AOC L1 bidder- WO amount | |
| 2 | L2₹33.4 L+₹2.8 L (9.24%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹34.0 L+₹3.4 L (11.1%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
Tender Value
₹34.5 L
EMD Value
₹50,000
Closing Date
16 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CEO Technopark
Park Centre building, Technopark Phase 1 Campus
Contract for the Repair and Maintenance of Structural glazing and Aluminium Composite Panel
2024_ETPK_679553_2
ETPK/PH3/189/2024-25
Open Tender
Civil Works - Others
Item Rate
730 days
Technopark Phase 3 campus, Trivandrum
As mentioned in bid document
2 documents required · 2 mandatory
₹2,950
₹50,000
Park Centre building, Technopark Phase 1 Campus
10 Sept 2024
29 Jul 2024
17 Aug 2024
30 Jul 2024
16 Aug 2024
30 Jul 2024
31 Jul 2024
Amount
Maintenance of Structural glazing and ACP
Providing, assembling, and fixing damaged front/ back of vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of existing size and shape, which contain comprising of an outer heat strengthened float glass 6mm thick, with a reflective soft coating on surface # 2 of colour and shade, an inner Heat strengthened clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings. For payment, only the actual area of glass on face # 1 of the glass panels which is replaced (excluding the areas of the grooves and weather silicone sealant applied outside the glass area) but including the sealant for fixing the glass in position, the area of glass will be measured in sqm.(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating onface # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved makehaving properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflectioninternal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performanceglass shall be decided by technical sanctioning authority as per the site requirement. The rate inclusive of all material charge, labour, transportation, Scaffolding for all heights and all levels, loading/unloading and safe removal of damaged glass at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Safe removal of existing damaged/broken shadow box including removal of existing wood wool and Providing, fabricating and supplying shadow box of required size and shape, for fixing in the spandrel portion of the structural glazing, in linear as well as curvilinear portions of the building by providing semi - rigid, inorganic, non- combustible fibre glass wool insulation 50 mm thick, conforming to IS: 8183 and BS: 3958 part 5. The insulation layer shall have facing (factory bonded on surface # 1 of the fibre glass insulation layer), of black non-woven fibre glass tissue of nominal thickness 0.5mm and nominal mass not less than 60 gm/ sqm, made of randomly oriented glass fibres distributed in a binder by a wet-lay process including fixing 1.5 mm thick solid aluminum sheet backing using, 6 mm thick cement board including SS rivets, nuts,bolts, washers etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding for all heights and all levels, loading/unloading and safe removal of damaged glass at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Removing of existing ACP Panel and fixing of new panel in position over existing Curtain Wall, with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including: Providing, fabricating, supplying, and fixing panels of aluminium composite panel cladding in existing shape and colour matching with an existing cladding of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral cores sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar500based PVDF / Lumiflon-based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant (Non Staining), backer rods etc. the work including fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners,SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators toprevent bi-metallic contacts all complete required to perform as per specification, drawing and Instruction of engineer in charge etc. The item includes cost of all material & labour component, cleaning and protection of the curtain wall with aluminium composite panel cladding till the completion of work. However, for the purpose of payment, only the actual area on the external face of the Aluminum Composite Panel Cladding (Excluding width of groove) shall be measured in sqm. up to two decimal places. The properties of performanceglass shall be decided by technical sanctioning authority as per the site requirement. The rate inclusive of all material charge, labour, transportation, Scaffolding loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Removal and refixing of existing ACP Panel in position over existing Curtain Wall, with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including: Providing, fabricating, supplying, and fixing panels of aluminium composite panel cladding in existing shape and colour matching with an existing cladding of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral cores sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar500based PVDF / Lumiflon-based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant (Non Staining), backer rods etc. the work including fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners,SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators toprevent bi-metallic contacts all complete required to perform as per specification, drawing and Instruction of engineer in charge etc. The item includes cost of all material & labour component, cleaning and protection of the curtain wall with aluminium composite panel cladding till the completion of work. However, for the purpose of payment, only the actual area on the external face of the Aluminum Composite Panel Cladding (Excluding width of groove) shall be measured in sqm. up to two decimal places. The properties of performanceglass shall be decided by technical sanctioning authority as per the site requirement. The rate inclusive of all material charge, labour, transportation, Scaffolding loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structuralnon sag elastomeric PU sealant over backer rod of approved quality as perarchitectural drawings at all levels & heights and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600 20 (Avg) mm depth and 20 (Avg) mm width or nearest. The work includes removal of the existing or damaged backer rod/ form, and existing sealant and cleaned the gape with proper solution/ equipment (not using the sharp material/ equipment which causes damage to the existing ACP or glass) before applying the backer rod and sealant. Proper Masking tap must be used before applying the sealant to avoid the spreading of sealant around the restricted area and make a better appearance. All the work will be completed per the manufacturer's specification and the direction of an engineer in charge, to avoid the air gap for applying the sealant. The rate is inclusive of all material charges, labour, transportation, Scaffolding loading/unloading at the workspace, removal of spreaded unwanted sealant around the working area and removal of debris from Technopark campus, etc. complete as per the direction of an engineer in charge.
PHS INTEGRATED SERVICES PRIVATE LIMITED
ALMAX ENGINEER
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1062555.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .