Tender Value
₹37.0 L
EMD Value
₹74,000
Closing Date
7 Oct 2026, 2:00 pm4d left
Superintending Engineer
Electricity Civil Circle (Dehradun)
Construction of Store Room , Toilet , Special Maintenance and Repair of old Control Room building , M and R work of Old Boundary wall and other Civil Works at 33/11 KV Substation Campus Transport nagar , Jawalapur , Haridwar.
2026_UPCL8_100779_1
ECC-40/2026-27
Open Tender
Civil Works
Percentage
120 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
E.E, ECCD Dehradun
₹74,000
30 Sept 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
7 Oct 2026
2 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.001 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and rammingof bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.All kinds of soil. | 14.72 | Cum | 253.27 | ₹3,728.13 |
| 1.002 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | 0.1 | Cum | 7,665.78 | ₹766.58 |
| 1.003 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | 6.83 | Cum | 6,628.08 | ₹45,269.79 |
| 1.004 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level,excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size) | 2.07 | Cum | 10,559.92 | ₹21,859.03 |
| 1.005 | R.C.C. work in Beams, Suspended Floors, Roofs Having Slope up to 15⁰ Landing, Balconies, Shelves, Chajjas, lintel, Band, Plain Window in 1:2:4 of Cement Concrete Excluding the cost of cenering Shuttering, Finishing and Reinforcement.. | 14.88 | Cum | 11,194.85 | ₹1,66,579.37 |
| 1.006 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform | 75.31 | Sqm | 902.21 | ₹67,945.44 |
| 1.007 | Centering and shuttering including strutting, propping etc. and removal of form for:Shelves (Cast in situ) | 5 | Sqm | 902.21 | ₹4,511.05 |
| 1.008 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumers and cantilevers | 53.06 | Sqm | 716.52 | ₹38,018.55 |
| 1.009 | Centering and shuttering including strutting, propping etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 21.25 | Sqm | 935.34 | ₹19,875.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_118784.xls
BOQ • 0.44 MB
TC.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .