| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.0 L+₹5,104.49 (0.30%)Rejected-Finance | ₹17.0 L+₹5,104.49 (0.30%) | L2 | Rejected-Finance L2 |
| 3 | L3₹17.2 L+₹31,608.58 (1.87%)Rejected-Finance | ₹17.2 L+₹31,608.58 (1.87%) | L3 | Rejected-Finance L3 |
| 4 | L4₹17.4 L+₹49,474.31 (2.92%)Rejected-Finance | ₹17.4 L+₹49,474.31 (2.92%) | L4 | Rejected-Finance L4 |
| 5 | L5₹17.9 L+₹94,433.10 (5.58%)Rejected-Finance | ₹17.9 L+₹94,433.10 (5.58%) | L5 | Rejected-Finance L5 |
Tender Value
₹19.6 L
EMD Value
₹39,265
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas, Pin-743347
Emergent restoration of Sundarban Embankment damaged due to Full moon kotal on and from 30.07.2026 to 03.08.2026 from Ch. 3.50 km. to Ch.3.73 Km. for a length of 230.00 metre facing L/B of River Chenargang at Mouza Patibunia under Mousuni
2026_IWD_1038059_11
WBIW/EE/KIDIVISION/e-SNIT- 09 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
21 days
Namkhana
Please refer Tender documents.
6 documents required · 6 mandatory
₹39,265
Yes
15 Sept 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Jhaw /Eucalyptus bullah piles at work site,including dressing and making one end pointed.
(iii) 15 cm av. Diameter | - | Metre | 258.62 | - |
| 2 | Labour for driving Jhaw /Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position,protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving applances and all tackles.
(iii) 15 cm av. Diameter | - | Metre | 125.14 | - |
| 3 | Supplying ,fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc.complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. | - | Metre | 123.95 | - |
| 4 | Supplying,dressing and stacking at site bamboo pins above 5cm. diameter and upto 7.5cm .diameter. (Dia.to be measured at mid length) | - | Metre | 34.56 | - |
| 5 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Metre | 13.11 | - |
| 6 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84mx0.38 m conforming to BIS:14252:2015 for bank protective works including all cost of cost oftransportation on road by all means,including other incidental charges complete. Note:Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs,i.e.2.8.1and 2.8.2under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “SpecificationandSpecial Terms & Conditions for High Density Polyethylene(HDPE)Bags”in case of use of this item in the estimate.” | - | Each | 26.22 | - |
| 7 | Labour charges for filling HDPE bags with filler materials(earth/sand),machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30 m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge(Volume of earth/sand filled bag should not be less than 0.0328 cum). | - | Each | 14.3 | - |
| 8 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430gsmas filter, as per specification, includingcost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. | - | Sqm | 288.42 | - |
| 9 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breaches etc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 1 | cum | 96.54 | ₹96.44 |
| 10 | Extra rate over Item Nos. 9 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. (ii) For five extra lead | 1 | cum | 71.51 | ₹71.44 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2550090.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .