Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹9,589.33 (1.19%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
10 Mar 2025, 6:00 pmClosed
Assistant Engineer
LIDEW Sub division, Vengara Block, Malappuram Dt
Canal
2025_LSGD_743798_1
AEE/VGA/TN/05/2024-25
Open Tender
Civil Works - Canal
Item Rate
360 days
vengara
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,870
Yes
₹21,183
Yes
23 Jun 2025
1 Mar 2025
12 Mar 2025
1 Mar 2025
10 Mar 2025
1 Mar 2025
1 Mar 2025 - 10 Mar 2025
Amount
DRAIN
OD230378/2024-2025:Demolishing Dry rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD381267/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD381316/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with Dptl stone including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
ABDUL RAHOOF V (BID ID -2146600)
Bidder Name
SHIHABUDHEEN K
ABDUL RAHOOF V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1198755.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .