Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC AT BELTIKIRI SADAR DHENKANAL | ₹17.9 L | L1 | Accepted-AOC Winner of the transparent lottery system. |
| 2 | L1₹17.9 LRejected-Finance | ₹17.9 L | L1 | Rejected-Finance Looser of the transparent lottery system. |
| 3 | L1₹17.9 LRejected-Finance BASUDEVPUR BASUDEVPUR BHADRAK 756125 | BHADRAK | ODISHA | 756125 | ₹17.9 L | L1 | Rejected-Finance Looser of the transparent lottery system. |
| 4 | L1₹17.9 LRejected-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | ₹17.9 L | L1 | Rejected-Finance Looser of the transparent lottery system. |
| 5 | L1₹17.9 LRejected-Finance | ₹17.9 L | L1 | Rejected-Finance Looser of the transparent lottery system. |
Tender Value
Refer Docs
EMD Value
₹21,098
Closing Date
3 Mar 2026, 5:00 pmClosed
SERandBDivisionBhadrak
O/O SE Rand B DivisionBhadrak
S/R to Kamargaon Balimeda road from 11.000km to 16.000 km such as cutting and disposal of damaged road crust and laying WMM,PMC and Seal coat for the year 2025-2026.
2026_EICCL_126577_1
SE RandB BDK-39/2025-26-5
Open Tender
Civil Works - Roads
Percentage
30 days
Bhadrak
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹21,098
Yes
18 Jun 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth up to 300mm removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of servicable materials to be used or auctioned up to a lead of 1000 mtres including removal and disposal of top organic soil not exceeding 150mm in thiness. | - | CUM | 7.9 | - |
| 2 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified materials with in all lifts and lead up to 1000 Metres etc. complete. | - | CUM | 6.06 | - |
| 3 | Providing,laying,spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix. Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with Vibratory roller to achive the desired density as per clause 406m of MORTH specification for road and bridge works etc. complete. | 0.48 | Each Cum | 3,053.42 | ₹1,462.59 |
| 4 | Providing applying Primer coat with bitumen emulsion on prepared surface of granular sub-base including cleaning the road surface and spreading primer @ 60kg/Sqm. using mechanical means with cost,conveyance,royalities ,taxes of all materials all labours hire and running charges of all machineries T&P sundries etc.complete as per direction of Engineer-in-charge. | 0.56 | Each Cum | 38.9 | ₹21.78 |
| 5 | Providing applying tack coat with bituminous emuletion using emuletion pressure distributere as preparatory for a bituminous layers with 0.20Kg.of 60/70 penetration grade bitumen per 10 sqm. on the prepred surface with cost,conveyance,royalities ,taxes of all materials all labours hire and running charges of all machineries T&P sundries etc.complete as per direction of Engineer-in-charge. | - | Each Cum | 15.4 | - |
| 6 | Labour and laying 20mm thick premix carpet using 0.27 cum.of 13.2mm to 5.6mm size BHG(C.B) chips for 10 sqm.with 14.60kg.of pnetration grade bitumen and hand aking to proper camber for precoating andconsolidation with PRR including hire and running charges of PRR with all cost of materials and labour T&P etc.complete as directed by Engineer-in-charge. | - | Each Cum | 236.69 | - |
| 7 | Labour for laying 6mm thick precoated seal coat Type-B using 0.06 cum of 6.7mm size chips as per sieve analysis and 6.8Kg of bitumen per 10sqm.including hire and running charges of PRR, hot mix plant, tar boiler and all other T&P articles but excluding cost and conveyance of chips and bitumen Unit = Sqm Taking output = 5889 sqm vide ARP- 149 item no.22 | - | Each Cum | 96.89 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582771.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
5kamargaon.pdf
Tender Documents • 2.24 MB
BOQ_582771.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .