| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed vide agreement no. 142/25-26 | |
| 2 | L2₹17.3 L+₹34,993.50 (2.07%)Rejected-Finance | L2 | Rejected-Finance higher rate hence rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | shiyas L1 | Hira Constructions L3 | AJFAR K.A. L2 |
|---|---|---|---|---|---|---|
| 1.00retarring | ||||||
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 538.5 | sqm | 78 ₹42,003 | 84.25 ₹45,368.63 | 60 ₹32,310 Lowest |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,932 | sqm | 15 ₹73,980 | 16.5 ₹81,378 | 14 ₹69,048 Lowest |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 202.5 | sqm | 323 ₹65,407.5 | 339.45 ₹68,738.63 | 300 ₹60,750 Lowest |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 9.24 | cum | 8,000 ₹73,920 | 9,647.5 ₹89,142.9 | 7,000 ₹64,680 Lowest |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 6 | cum | 3,300 ₹19,800 | 3,975 ₹23,850 | 3,200 ₹19,200 Lowest |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 4,932 | sqm | 287 ₹14,15,484 Lowest | 315.9 ₹15,58,018.8 | 300 ₹14,79,600 |
Tender Value
₹17.9 L
EMD Value
₹44,669
Closing Date
18 Jun 2025, 6:00 pmClosed
THE ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER,THRIKKAKARA MUNICIPALITY
Proj.no- 57/2025-26 Ward-04,Thrikkakara Municipality-Retarring at Soubhagya road,Health centre road,Eravathkatt road,Valamkottil lane,Lakshmi nagar road
2025_LSGD_768382_6
LIDEW/AEE/ET/22/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
THRIKKAKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹44,669
Yes
11 Oct 2025
11 Jun 2025
20 Jun 2025
11 Jun 2025
18 Jun 2025
11 Jun 2025
Amount
retarring
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
AJFAR K.A. (BID ID -2227544)
Hira Constructions (BID ID -2227652)
Bidder Name
shiyas
Hira Constructions
AJFAR K.A.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1253101.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .