Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹27,916.98 (19.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹4,740
Closing Date
21 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Const. of Lane from H/o Nisar Ahmad Khan to Darul-Uloom Khan Mohalla.
2026_PWDJK_324624_2
NIT No.67-2026-27
Open Tender
Civil Works
Percentage
20 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Ganderbal
₹4,740
29 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead For thickness of tiles above 25 mm and upto 40 mm all complete. | 135 | Sqm | 89.95 | ₹12,143.25 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 10.13 | Cum | 5,202.9 | ₹52,705.38 |
| 3 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) Ordinary cement without any pigment. | 108 | Sqm | 903.85 | ₹97,615.8 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.35 | Cum | 5,733.6 | ₹7,740.36 |
| 5 | Carriage of Material:-
Stone Agg. 40mm for an avg. lead of 10 Kms | 9.11 | Cum | 303.34 | ₹2,763.43 |
| 6 | Carriage of Material:-
Stone Agg. 20mm for an avg. lead of 10 Kms | 1.21 | Cum | 279.04 | ₹337.64 |
| 7 | Carriage of Material:-
Sand for an avg. lead of 14 Kms | 5.16 | Cum | 331.4 | ₹1,710.02 |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 513 | kgs | 120.8 | ₹61,970.4 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1095265.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .