Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 L
EMD Value
₹8,326
Closing Date
2 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
Office of the Jagatsinghpur Municipality
Construction of RCC Culvert near Maa Charchika Temple
2026_ORULB_143462_17
EO/ JSPURM/ W_05/ 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Construction of RCC Culvert near Maa Charchika Tem
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,326
Yes
16 Oct 2026
16 Oct 2026
4 Nov 2026
16 Oct 2026
2 Nov 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m initial lead and 1.5m initial lift including rough dressing braking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth | 34.13 | cum | 306.01 | ₹10,444.12 |
| 2 | Dismantalling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50m lead as per direction of E.I.C | 9.72 | cum | 877.16 | ₹8,526 |
| 3 | Sand Filling in Foundation &Plinth inclouding cost conveyanceroyalty & taxes and all labour T & P etc. complete., | 6.23 | cum | 568.2 | ₹3,539.89 |
| 4 | C.C.( 1:4:8) using 4Cm size H.G. Crusher metal including cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 11.35 | cum | 6,468.98 | ₹73,422.92 |
| 5 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 28.48 | cum | 6,961.85 | ₹1,98,273.49 |
| 6 | Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete. | 42.71 | qnt | 8,901.27 | ₹3,80,173.24 |
| 7 | C.C.( 1:2:4) using 12mm size H.G. Crusher metal including cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 6.36 | cum | 8,497.28 | ₹54,042.7 |
| 8 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete.Column foundation & Plinth- | 88.08 | sqm | 249.73 | ₹21,996.22 |
| 9 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete.Slab | 14.4 | sqm | 769.2 | ₹11,076.48 |
| 10 | Supplying of MS door ,window & grill including cost carriage materials labour and all taxes etc all complete | 69 | kg | 96.85 | ₹6,682.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.35 MB
BOQ_614254.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .