Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | L1 | Accepted-Finance LOWEST QUOTED BIDDER AND TECHNICALLY QUALIFY | |
| 2 | L2₹2.7 L+₹3,428.10 (1.27%)Rejected-Finance | L2 | Rejected-Finance QUOTED HIGHER THAN L-1 | |
| 3 | L3₹2.8 L+₹6,856.21 (2.54%)Rejected-Finance AT CHANDOUR BASTI TETULMARI PO SIJUA DHANBAD 828121 | DHANBAD | DHANBAD | JHARKHAND | 828121 | L3 | Rejected-Finance QUOTED HIGHER THAN L-1 | |
| 4 | L4₹3.4 L+₹67,419.42 (25.0%)Rejected-Finance AT MOHLIDIH BHULI PO BHULI DHANBAD 828104 | DHANBAD | JHARKHAND | 828104 | L4 | Rejected-Finance QUOTED HIGHER THAN L-1 |
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
24 Jun 2026, 5:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Repairing and maintenance of NHS qtr. No.58 ,133,152,198 Zero Seem Tetulmari Colliery under Sijua Area
2026_BCCL_361079_1
GM/SA/Civil/2026-27/eNIT-19
Open Tender
Civil Works - Buildings
Percentage
15 days
Tetulmar Colliry
PLEASE REFER NIT
3 documents required · 3 mandatory
₹3,500
10 Oct 2026
13 Jun 2026
26 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
15 Jun 2026 - 22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 2.05 | cum | 1,232.8 | ₹2,527.24 |
| 1.02 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 96.21 | sqm | 32.85 | ₹3,160.5 |
| 1.03 | 6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand) for ceiling and chajas. | 87.57 | sqm | 198.2 | ₹17,356.37 |
| 1.04 | 12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand) | 186.02 | sqm | 222 | ₹41,296.44 |
| 1.05 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 526.81 | kgs | 88.2 | ₹46,464.64 |
| 1.06 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 25 mm thick with 20 mm nominal size stone aggregate. | 81.48 | M2 | 343.48 | ₹27,986.75 |
| 1.07 | Colour washing such as green, blue or buff to give an even shade :old work one or more coats | 681.67 | sqm | 20.05 | ₹13,667.48 |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 120.62 | sqm | 68.3 | ₹8,238.35 |
| 1.09 | Providing and fixing white vitreous china water closet squatting pan (Indian type) :Orissa pattern W.C. pan of size 580x440 mm | 4 | each | 2,224.65 | ₹8,898.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.10 MB
BOQ_373954.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .