Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
5 Oct 2026, 6:00 pm4d left
Executive Engineer REW Baramulla
REW BARAMULLA
Const. of side wall on Gund Road from L / O Ali Mohammad Mir to onwords at goshbugh Block - Pattan . Pyt - Goshbugh B Year - 2026 - 27 Under - Pri
2026_RDPR_325624_5
235/Xen/Rew/Bla/2026-27 Dated 22/09/2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹3,920
22 Sept 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 16.46 | Cum | 256.85 | ₹4,227.75 |
| 2 | Providing/Laying Stone soling hand packed on level in foundation trenches incl all carraiges of material. | 2.8 | Cum | 1,000 | ₹2,800 |
| 3 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level). | 22 | Cum | 5,733.6 | ₹1,26,139.2 |
| 4 | 20% Plum in 1:3:6 Mix Cement Concrete. | 5.91 | Cum | 1,000 | ₹5,910 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. | 51.86 | Sqm | 286.35 | ₹14,850.11 |
| 6 | 12 mm cement sand plaster in 1:4 mix. | 49.7 | Sqm | 266.2 | ₹13,230.14 |
| 7 | Providing and fixing of Information sign board and three stage photographs (Pre, post and during execution) including unforseen items , mislineous items etc etc etc | 1 | Job | 4,207.52 | ₹4,207.52 |
| 8 | Carriage of materials from the approved sources to work site by mechanical transport: Sand for an average lead of 30 Km. | 31.91 | Cum | 751.39 | ₹23,976.85 |
| 9 | Carriage of materials from the approved sources to work site by mechanical transport: Cement bags for an average lead of 5 Km | - | Qtls | 17.61 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1100975.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .