Tender Value
₹33.2 L
EMD Value
₹34,000
Closing Date
5 Jun 2026, 6:00 pmClosed
THE EXECUTIVE ENGINEER, IRRIGATION DIVISION, MORBI
Providing Consultancy services for carrying out survey, plotting C S and L S, preparation of Design, plans and estimate for various New Checkdams and preparation of Design, plans and estimate of Damaged checkdams for year 2025-26 in Morbi Dist.
307219
SBD NO 04 OF 2026-27
Open
Civil Works - Others
Works
Morbi
10 documents required · 9 mandatory · 1 optional
₹1,500
THE EXECUTIVE ENGINEER IRRIGATION DIVISION MORBI
₹34,000
20 May 2026
20 May 2026
20 May 2026
5 Jun 2026
20 May 2026
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
carrying out Feasibility Report of proposed check dam
I and submitting other necessary documents along with 8.00 Nos. 20000.00
necessary photograph. V/
Survey by DGPS including measuring of alignment of
earthen dam/canal and cross section and longitudinal
2 section profile at 30 mt interval/or closer as direct and 16.00 Km 11569.00
plotting etc complete. The survey work shall be carried
out for 150 mt distance on both side. J
Survey using own DGPS instrument for topographical
and conotur survey work in 30 x 30 mt. grid with 0.5 mt
contour interval, locating all exisitng features with 194.00 Ha 1646.00 31.9324.00
preparation and submission of survey drawing in A0 size
sheet in one hard copy & soft copy etc. cor-r plc Le.
Preparing of Cross-sections and computing L-section and
Submission in required size paper etc complete
(i) computing cross section by software 30m interval and
submission by softcopy. \."
5 Cross section print out 44 size (Extra copy) \,' 2172.00 Nos 5.55 14065.92\-,.
Computing L-Sedion as directed by Engineer-in- cjlarge v-
and submission in 43 or above size paper -,'
7 L-section A3 size lextra copyl -uz/ 32.00 '' Nos " L3.3t 4?5.92 \-/
providing and fixing pre cast/cast-in-situ Concrete M-15
TBM with indicating its value on TBM at every 500mt
8 interval with size of 0.45mtxo.45mtxo.50mt fixing in 8.00 Nos 431.@
ground upto detph of 0.30mt alongwith photograph of
Drilling of boreholes with 10m depth in soil strata(100 -
150 mm Dia) of man & machinery within 1 Km when
more than that charge will extra includinB standard
penetration test at 1.5 m interval depth to be done
during geotech work. Laboratory testing, sieve analysis,
atterberg limit, FDD-FMC, Sp. Gravity, Direct shear
parameters, triaxial shear parameters, consolidation,
swell pressure, swelling index, shrinkage limit,and other
index properties accordint to site conditions, locating
water table etc. including preparation Geo Technical
investigation report as well as Geological LS.along with
sample preservation in Core box. " -"'
Drilling of boreholes with 10 depth in Rocky strata(loo -
150 mm Dia) of man & machinery within 1 Km when
more than that charge will extra. Laboratory testinB
Unconfined Compressive Strength, Point load, water
10. aborption, porosity, specific gravity, dry density and 19.00 Nos. 34000.00
other index properties according to site conditions, V
location of water table etc. including preparation Geo
Technical investiBation report as well as Geological LS
along with sample preservation in Core box.
Preparation of Design & Estimate of Feasible checkdam
as per Prevailing Government guideline and submission
il of Final drawing in 4 no s. of hard copy and Spfty Copy
also. (includinB neccesa ry perfoma) \-" -,/
Preparation of Estimate for Damaged checkdam as per
Government guideline and approves it to from approval
t2 authority and submission of Final drawing in 4 nos. of 2.00 Nos 55000.00
hard copy and Soft Copy aly.(Morbi District) (including
neccesary perfoma) \./
TOTAL Al,zo.,ttg=st
THIRTY THREE LAKHS TWENTY THOUSAND SEVEN HUND NINETEEN AND PAISE
EIGHTY FOUR ONLY
I/'We am/are willing to carry out the work at... ................... %o above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct.........% below Add.........% Above
In words ln words
Des€+ip+ion-of{+em- auan$ry Unit Rat€ Am€{mt
N€ t+r,itl+rie*speeifiea+ie+
and+efu+enee+e$eek+f ll+ I+
speeigeetien$ figures Vlerds
TvIrr--r6FTeJ...
[C)Net Tendered 4meunt (4 B] [in fi$re) ,,,,,,,,,,,,,,,,,
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-ln-Charge for which no extra a ent shall be made.
The labour cess will be deducted as per prevailin rules i.e. 1%o ofthe work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010 /77 /Kl Dated:3o /07 /2078 as stated in S.O.R therefore tn
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at th e rate of
ln ut l'ate mentioned in all the tender.
lrriqation Div;slon'
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. TENDER NOTICE.pdf
2. SBD.pdf
3. BOQ.pdf
4. TECHNICAL SPECIFICATION.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .