| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.0 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹44.8 L+₹1.8 L (4.13%)Rejected-Finance | 2 | Rejected-Finance Rejected | |
| 3 | 3₹45.4 L+₹2.4 L (5.48%)Rejected-Finance NEAR HANUMAN MANDIR VILLAGE KOHAR TEH DISTT BHIWANI | 3 | Rejected-Finance Rejected | |
| 4 | 4₹54.8 L+₹11.8 L (27.3%)Rejected-Finance | 4 | Rejected-Finance Rejected | |
| 5 | 5₹54.8 L+₹11.8 L (27.5%)Rejected-Finance | 5 | Rejected-Finance Rejected |
Tender Value
₹52.1 L
EMD Value
₹1.0 L
Closing Date
12 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Vikas Dhiman
Municipal Corporation Yamunanagar
Construction of street and drain from H/o Sandeep Kumar to Arjun dev, H/o Satish to Suresh pal, H/o Sandeep, H/o Raman, H/o Poonam wali Gali in Vipin colony ward no 03 MCYNR-JGD. Recall
2026_HRY_552103_1
20261C25A20D 921D 436C BAAC 2264BF61C802288ULB
Open Tender
Civil Works
Works
145 days
Jagadhari
2 documents required · 2 mandatory
₹5,000
₹1.0 L
Yes
10 Nov 2026
5 Oct 2026
13 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 449.52 | cum | 1,863 | ₹8,37,455.76 |
| 1.02 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 44.64 | Sqm | 113 | ₹5,044.32 |
| 1.03 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 570 | Kg. | 83 | ₹47,310 |
| 1.04 | [21.2.3]Dismantling existing drains of different sizes cunnettes, section only including recovery of all useable materials, stacking the same near site of dismantled works and disposal of all rubbish off site of works. 3. Type II Drain [Through Rate] | 131 | 10 Metres | 664 | ₹86,984 |
| 1.05 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 1,310 | Metre | 363 | ₹4,75,530 |
| 1.06 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 15 | Each | 1,155 | ₹17,325 |
| 1.07 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 310.13 | cum | 66 | ₹20,468.58 |
| 1.08 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 576.4 | cum | 78 | ₹44,959.2 |
| 1.09 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 310.13 | cum | 460 | ₹1,42,659.8 |
| 1.1 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 647.53 | cum | 3,975 | ₹25,73,931.75 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_631942.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .