Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC 195 SREENAGAR 01 NO MADHYAMGRAM KOLKATA 700129 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700129 | ₹4.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 LRejected-AOC | ₹4.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹4.8 LRejected-AOC VILL DIGHAPARA P O BARAJAGULI DIST NADIA W B PIN 741221 | BARAJAGULI | NADIA | WEST BENGAL | 741221 | ₹4.8 L | L3 | Rejected-AOC L3 |
Tender Value
₹4.7 L
EMD Value
₹9,439
Closing Date
27 Nov 2025, 5:30 pmClosed
Haringhata Chairman
Haringhata Municipality, Subarnapur, Nadia
Construction of new ICDS center (center No.-19336080201) Infront of Dipa Saha House at Thakur tala at Booth no-164 at Ward no-9, Scheme Id-APAS/01/093/164/0001 under Haringhata Municipality.
2025_MAD_940411_7
WBMAD/ULB/HM/NIT-30e/2025-26
Open Tender
CIVIL WORKS
45 days
Haringhata
Refer in Tender Documents.
4 documents required · 4 mandatory
₹0
₹9,439
Yes
6 Apr 2026
7 Nov 2025
29 Nov 2025
7 Nov 2025
27 Nov 2025
7 Nov 2025
Page no- 1 & Item no- 2(a) (P.W.D Builing) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Page no- 34 & Item no- 22(1) (a) (P.W.D Building) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion
Page no- 1 & Item no- 3) a) (P.W.D Building) Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Page no -104 & Item no - 13(a) (P.W.D Building) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Page no -16 & Item no - 16(P.W.D Building) 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Page no- 42 & Item no- 36a (P.W.D Building) Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Page No-43, Item No- 40 (P.W.D. Building) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel ii) JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL @1.15% of Volume of Concrete
Page no -26 & Item no 10(i) (P.W.D. Building) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Page No- 189 & Item No- 1 (P.W.D Building) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (c) 10 mm thick plaster
Page No- 189 & Item No- 1 (P.W.D Building) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 20 mm thick plaster
Page No- 189 & Item No- 1 (P.W.D Building) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 15 mm thick plaster
Page no- 192 & Item No- 15 ( P.W.D Building) Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
Page no- 196 & Item No- 10 ( P.W.D Building) Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats
Page no- 196 & Item No- 8 ( P.W.D Building) Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (a) One Coat
Page no- 197 & Item No- 17 ( P.W.D Building) Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
Page no- 48 & Item No- 6 iiii ( P.W.D Building) Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement) (iii) 35 mm. thick
Page-114/It.No-1(i) (S & P) Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (i) other local wood
Page-117/It.No-1(A) (S&P) Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) (i) 50mm thick shutters with 25mm thick panel of size 30 to 45 cm
Page no- 141 & Item No- 10 ( P.W.D Building) Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (a) 200mm long
ADD GST
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 17.80 MB
BOQ_2224686.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid