PALANPUR NAGARPALIKA
CONSTRUCTION OF C C ROAD AND PAVER BLOCK AT PALANPUR NAGARPALIKAS DIFFERENT AREA UNDER UDP-88 2023-24 GRANT
348089
2025-26
Open
Miscellaneous Works
Works
Banaskantha
1 document required · 1 mandatory
₹1,770
chief officer, palanpur nagarpalika
₹27,961
23 Sept 2026
23 Sept 2026
23 Sept 2026
13 Oct 2026
23 Sept 2026
CALCULATION SCHEDULE B
Sr.No Item Total Units QTY Amount
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
4 for making a base for road work including removing the 103.26 CUM 341.03
excavated stuff and depositing on the road side slope as
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
6 directed upto 50 mts. Lead. 4517.71 CUM 111.60
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50 mts. Lead.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 NIT SJMMSVY UDP-88 2023-24 BACHAT.pdf
02 SBD SJMMSVY UDP-88 2023-24 BACHAT.pdf
03 CONDITION SJMMSVY UDP-88 2023-24 BACHAT.pdf
04 SCHEDULE B SJMMSVY UDP-88 2023-24 BACHAT.pdf
05 CALCULATION SJMMSVY UDP-88 2023-24 BACHAT.pdf
06 Vol-II ( Materials Make).pdf
07 General Techinacal specifications.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .