Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50,500Accepted-AOC BASTACOLA NEAR MINES RESCUE DHANSAR DHANBAD DHANBAD 828106 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828106 | ₹50,500 | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹52,400Rejected-Finance AT BHAGATDIH ISLAMPUR P O JHARIA DIST DHANBAD 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹52,400 | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹54,600Rejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹54,600 | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | M S Traders L1 | BIHAR TRADING CO. L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
DESCRIPTION OF WORK:
1. Suspension arm LHS & RHS opening and after repairing fitting.
2. Suspension arm LHS & RHS crack portion gauging, welding and alignment.
3. Take out the failed arm bush heating by gas.
4. Both arm side eye hole welding and grinding LHS & RHS.
5. Take out the arm pin heating by gas.
6. Pin welding and machining by lathe machine.
7. New sperikal bush supply and fitting.
8. New cir clip supply and fitting.
Material Required:-
DA cylinder-01 no, Oxygen cylinder-02 nos, Gauging electrode-8 kg, Steel electrode-05 kg, Pin welding and machining-04 nos, New sperikal bush-04 nos, New sir clip 90mm-08 nos, Grinding wheel-04 nos.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 50,500 ₹50,500 | 52,400 ₹52,400 | 54,600 ₹54,600 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹50,505
Closing Date
17 Jan 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA OFFICE
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of cross pan hard rod assembly arm both side with pin and new bushing of WT 28310 at ADIC Kusunda Area
2026_BCCL_350774_1
BCCL/KA-VI/EXC/E-TEN/25-26/130
Open Tender
Excavation Department Work
4 days
ADIC KUSUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
Yes
1 Mar 2026
7 Jan 2026
19 Jan 2026
7 Jan 2026
17 Jan 2026
7 Jan 2026
Item Description/ Heading
Jobs to be done: DESCRIPTION OF WORK: 1. Suspension arm LHS & RHS opening and after repairing fitting. 2. Suspension arm LHS & RHS crack portion gauging, welding and alignment. 3. Take out the failed arm bush heating by gas. 4. Both arm side eye hole welding and grinding LHS & RHS. 5. Take out the arm pin heating by gas. 6. Pin welding and machining by lathe machine. 7. New sperikal bush supply and fitting. 8. New cir clip supply and fitting. Material Required:- DA cylinder-01 no, Oxygen cylinder-02 nos, Gauging electrode-8 kg, Steel electrode-05 kg, Pin welding and machining-04 nos, New sperikal bush-04 nos, New sir clip 90mm-08 nos, Grinding wheel-04 nos. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_363526.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_363526.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid