Tender Value
₹11.5 L
EMD Value
₹12,000
Closing Date
4 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Anand Irrigation Division Anand.
Clearing the Silt and Jungle Cutting of Navakhal minor under Anklav-2 Section of Borsad Irrigation Sub Division, Borsad
287164
19 of 2025-26
Open
Miscellaneous Works
Anand
6 documents required · 5 mandatory · 1 optional
₹900
Yes
Executive Engineer Anand Irrigation Division Anand
₹12,000
Yes
20 Mar 2026
20 Mar 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
Memorandum showing items of works to be carried out
Clearing the Silt and jungle Cutting of Navakhal Minor canal under Anklav-2 section of
WORK :- Borsad Irrigation Sub Division, Borsad.
Item No Descripation of Item Quantity Unit Rs. in figures. Amount
Clearing the shrubs, like akadas, weeds and
other vegetables including depositing the
same outside and burning etc. complete
from canal bed, top and both slopes of the
banks, for canal with discharge.Below
Clearing the shrubs, like akadas, weeds and
other vegetables including depositing the
same outside and burning etc. complete
from canal bed, top and both slopes of the
banks, for canal with discharge.For Canals
Between 21 to 250 Cusec.
Clearing the silt from the canal/drain bed by
a digging the same to the required bed level
and gradient including depositing the
excavated earth regularly in spoil bank for
utilizing the same preparing the banks after
breaking clods as and where directed for all
leads and lifts.For Canals Below 20 Cusec.
& 0 to 1.5 m lift.
Clearing the silt from the canal/drain bed by
a digging the same to the required bed level
and gradient including depositing the
excavated earth regularly in spoil bank for
utilizing the same preparing the banks after
breaking clods as and where directed for all
leads and lifts.For Canals Between 21 to
250 Cusec. & 0 to 1.5 m lift.
Rs. Eleven Lac Fifty Four Thousand Eight Hundred Sixty Two & Fifty Three Paise Only
I / We am /are willing to carry out the work at .....-....... % above /below..........-......................
.................................................( percent should written in figures and words )
of the estimated rate mentioned above.Amount of my / our tender work out as under.
Estimated amount Put to tender
Estimated amount Put to tender
Deduct :- ____ % Below Add ____ % above
In words Rs. In words Rs.
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as pe rprevailing rules i.e.1% of the work done.
Notes 3 - GST and Incometax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in
S.O.R.therefore in R.C.C.items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Deputy Executive Engineer
Signature of contractor. Borsad Irrigation Sub Division
Price Adjustment Statement
Name of Work:- Clearing the Silt and jungle Cutting of Navakhal Minor canal under Anklav-2 section of Borsad Irrigation Sub Division, Borsad.
Brake up of Rate Brack Up Amount
Estimated but Without GST Rate
Item No. Item of work Unit Amount (Rs.) Net Amount
may be more (Rs.) Plant &
Plant & Machinery
or less Labour Cement Steel Bitumen POL Machinery Other Material Labour Cement Steel Bitumen POL Other Material
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside and
slopes of the banks, for canal with discharge.Below
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside and
slopes of the banks, for canal with discharge.For Canals
Between 21 to 250 Cusec.
Clearing the silt from the canal/drain bed by a digging the
same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for
utilizing the same preparing the banks after breaking
clods as and where directed for all leads and lifts.For
Canals Below 20 Cusec. & 0 to 1.5 m lift.
Clearing the silt from the canal/drain bed by a digging the
same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for
utilizing the same preparing the banks after breaking
clods as and where directed for all leads and lifts.For
Canals Between 21 to 250 Cusec. & 0 to 1.5 m lift.
Deputy Executive Engineer Executive Engineer
Borsad Irrigation Sub Division Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-19 of 2025-26 Online -(03-2026) .pdf
1 Front Page..pdf
2 Certificate Final.pdf
3 Notice Inviting online Tender.pdf
4 New SBD Book.pdf
5.Item Technical Specification.pdf
6. BOQ AND POL.pdf
Download all tender documents and submit your bid