Tender Value
₹29.8 L
EMD Value
₹59,700
Closing Date
4 May 2026, 3:00 pmClosed
DEEPAK KUMAR,
EE, SCD, SIWAN
Saran Canal Division, Siwan
ANIL KUMAR
SE, SIWAN
Partial Desilting of Pithauri Siwan Distributary from km 0.3 to 2.9 & km 7.5 to 10.9 and Repair of SLR Bridge at km 14.01 of Pithauri Siwan Distributary
130318
NIT-01/2026-27/GR-02/SCD/SIWAN
Open Tender
CIVIL
Saran
• Registration No.
• Earnest Money
• Character Certificate
• Affidavit in required format (Should be after the publication date of the NIT)
• Name & Address of Bidder
• PAN & GST
• Time of Completion
CIVIL
PERCENTAGE
L1
1
8 documents required · 8 mandatory
₹5,000
Processing Fee: 590
₹59,700
4 May 2026
30 Apr 2026
5 May 2026
30 Apr 2026
4 May 2026
30 Apr 2026
Technical Sheet
Name of Work Partial Desilting of Pithauri Siwan Distributary from km 0.3 to 2.9 & km 7.5 to 10.9 and Repair of SLR Bridge at km 14.01 of Pithauri Siwan Distributary Cost of Work as per BOQ Rs. 29,82,297.00 Time of Completion 01 Month
Sl No. Items Requirement
Introduction of Tenderers Name of the tenderer(s) of tendering firm-telephone no., Mobile no. & Email
Address of the head office in India - telephone no., Mobile no. & Email
Address of the branch office in India
Nature of Constitution of the firm
Names of partners and their addresses.
1 Earnest Money As per NIT duly pledged in favour of Executive Engineer, Saran Canal Division, Siwan (Pay either online or offline)
Bid Security Amount - Rs. 59,700.00 Bid Security Amount - Rs.
2 Time of Completion 01 Month
3 Registration No.
4 PAN & GST No.
5 Character Certificate issued from S.P. Office for all members
6 Affidavit in required format as per NIT (Should be after the publication date of the tender)
Bill of Quantity Partial Desilting of Pithauri Siwan Distributary from km 0.3 to 2.9 & km 7.5 to 10.9 and Repair of SLR Bridge at km 14.01 of Pithauri Siwan Distributary
Last Date & Time of Uploading of Tender :- 04.05.2026 upto 3:00 PM
Estimated Cost :- 2982297
Earnest Money :- 59700
Time of Completion :- 01 Month
Cost of BOQ :- 5000
Beltron Bid Processing Fee :- 590
Sl. No. Item Quantity Unit Rate Amount (Rs)
1 Earthwork in bed clearance or desilting of canals having full supply discharge between 8.5 cumec (300 cusec) and 0.14 cumecs (5 cusecs) and renovation of pynes etc in ordinary soil and disposal of excavated earth etc, including rough dressing with all lead and lift all complete as per specifications and direction of E/I.( Inclusive royality Rs 33.0 13301.720000000001 Per M3 191
Seigniorage Fee 43895.67
1 Providing and laying P.C.C. or R.C.C M-200 with nominal mix of (1:1.5:3) in wearing coat over deck slab with approved quality of graded coarse aggregate of required grade (as per design) and approved quality sand of requisite F.M. washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of form work as well reinforcement, its cutting, bending, binding and placing complete job as per specifications and direction of E/I (Taking Rate of approved quality of aggregate as per Design) (Rate of Coarse aggregates 20 mm to 10 mm Taken) 2.2 Per M3 6823.4
2 Brick work in designation 100 A brick with cement mortat (1 :4) in foundation with approved quality coarse sand of requisite F.M. Washed and screened with racking out joints to 12 mm depth, curing, scaffolding and its removal where ever required including royality and all taxes etc. Complete job as per specification and direction of Engineer- in-charge. 2.05 Per M3 4987.7
3 Providing 12 mm thick cement plaster ( 1: 4 ) with approved quality sand of requisite F.M . Washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specification and direction of E / I. 37.45 Per M2 217.1
4 Providing 1.5 mm thick cement punning including curing, , royalty and all taxes etc. complete job as per specification and direction of E / I. 3.42 Per M2 66.2
5 Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 Metre lead and disposal of unserviceable materials with all leads. as per building specifications and direction of E/I. 1.1 Per M3 701.7
6 Dismantling R.C.C work including stacking serviceable materials in stacks within 15 Metre lead and disposal of unserviceable materials with all leads as per building specifications and direction of E/I. 0.74 Per M3 2516.5
7 Carriage of materials,inculiding loading, unloading, and stacking at site etc. all complete as per direction of E/I
A Cement-Siwan to work site(av.lead - (9K.M P ) 0.999 Per MT 540
B Sand-Koilwar to work site (Av.lead- 102km Surfaced + 3 K.M. Un Surfaced ) 0.999 Per M3 2572.4
C STONE CHIPS (IN M3) MIRZA CHEUKI TO WORK SITE BY ROAD =(9K.M Surfaced + 0 K.M. Un Surfaced ) AND RAIL 383 K.M. (Mirza Cheuki To Siwan) 1.845 Per M3 2500.2
D Brick-Klin to work site(av.lead - 5 km = 4 KM P + 1 K.M. UnSurfaced) 1026 Per ‰ Nos. 2043.2
Total Seigniorage Fee = 755.51
Total Estimate Amount (A+B)
GST @12% on (A)
Executive Engineer, Saran Canal Division, Siwan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 01 2026-27.pdf
NIT • 2.41 MB
Corrigendum-1.pdf
NIT • 1.20 MB
Technical Sheet GR 02 (01).xls
NIT • 0.03 MB
TenderDocs GR 02 (01).doc
NIT • 6.90 MB
BOQcumFinancialBid GR 02 (01).xls
NIT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .