Loading…
Loading…
Tender Value
₹6.0 Cr
EMD Value
₹4.5 L
Closing Date
6 Jul 2026, 11:00 am
Similar tender results from the same govt authority in the past 3 years.
Outsourcing of non-core activity for the maintenance of TL/AC (Conventional + LHB) coaches at AGTL, SCL, and SANG coaching depots of LMG Division for the period of two years.
EL-LM-26-27-11
EL-LM-26-27-11
Open
730 Days
East District, Sikkim
₹10,000
₹4.5 L
12 Jun 2026
12 Jun 2026
22 Jun 2026
A-Non Core activities (TL-AC) at AGTL, SCL, ANG coaching depots 59109684.10 Below/P
Outsoursing of skilled staff of NON CORE activities ie, daily maintenance activity in pit line/sick line, rectification/replacement of Fans, Lights, Wiring. Accessories Toggle/Plano switches. Mobile/Laptop charging points, lifting of materials from depot to pit line and pit line to depot, 1 connection/disconnection of IV couplers, removing of dust internally and externally in all items pertaining to electrical in 1 TL AC coaches (Conventional + LHB) as per scope of maintenance and schedules, any other work related to coach maintenance as per instruction of concerned site incharge. All the works should be executed as per instruction of site incharge. (No. of staff: AGTL-3, SCL-3. SANG-1) Man day required 7x730=5110 Mandays.
Outsoursing of semi-skilled staff of NON CORE activities i.e. daily maintenance activity in pit line/sick line, rectification/replacement of Fans, Lights, Wiring, Accessories Toggle/Piano switches, Mobile/Laptop charging points, lifting of materials from depot to pit line and 2 pit line to depot, connection/disconnection of IV couplers, removing of dust internally and externally in all items pertaining to electrical in 2 TL AC coaches (Conventional LHB) as per scope of maintenance and schedules, any other work related to coach maintenance as per instruction of concerned site incharge. All the works should be executed as per instruction of site incharge. (No. of staff AGTL-12, SCL-15, SANG- 5) Man day required 32x730= 23360 Mandays.
Outsoursing of unskilled staff of NON CORE activities ie daily maintenance activity in pit line/sick line, rectification/replacement of Fans, Lights, Wiring, Accessories Toggle/Piano switches, Mobile/Laptop charging points, lifting of materials from depot to pit line and pit line to depot, connection/disconnection of IV couplers, removing of dust internally and externally in all items pertaining to electrical in 3 TL AC coaches (Conventional + LHB) as per scope of maintenance and schedules, any other work related to coach maintenance as per instruction of concerned site incharge. All the works should be executed as per instruction of site incharge. (No. of staff AGTL-25, SCL-30. SANG-6) Man day required 61x730= 44530 Mandays. Above/
B-Cost of Uniform for staffs deployed 798800.00 Below/P
Cost of uniform for two years
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender document
ATTACHMENT
TenderdocNoncoreEL-LM-26-27-11.pdf
ATTACHMENT
Download all tender documents and submit your bid