Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC KATRASGARH BOKARO 828113 JHARKHAND INDIA | BOKARO | BOKARO | JHARKHAND | 828113 | L1 | Accepted-AOC SINCE ACCEPTED AS L1 | |
| 2 | L2₹2.5 L+₹27,840 (12.4%)Rejected-Finance | L2 | Rejected-Finance Rejected since L2 | |
| 3 | L3₹2.7 L+₹46,380 (20.7%)Rejected-Finance LAIYO CHOWK RAMGARH JHARKHAND | RAMGARH | JHARKHAND | 825325 | L3 | Rejected-Finance Rejected since L3 |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
19 Sept 2024, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Repairing/ servicing of engine, Radiator assly, FIP and Nozzle, clutch system, Gear box, Brake system and Spring leaf etc of Ashok Leyland Make Tripping Truck bearing Regd. No- BHM-1899 deployed at Kuju Colliery under Kuju area.
2024_CCL_317099_1
GM (K)/EnM/eTender/24-25/119
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹3,100
23 Oct 2024
9 Sept 2024
20 Sept 2024
9 Sept 2024
19 Sept 2024
9 Sept 2024
9 Sept 2024 - 16 Sept 2024
Amount
A) Engine servicing as replacement of
Diesel filter-
Mobil filter set.
Diesel flex. Pipe( Main & Return)
Tappet cover packing and side cover , silencer packing-
Tappet spring set.
B)Repairing of Radiator assly as changing of
Supply of Radiator bracket both side-
Supply of Top and bottom Tank-
Supply of radiator Jali new as per size-
Radiator Hose Pipe set with clamp-
Coolant-
Full calibration of fuel injector pump with materials-
Repairing of Nozzle with spares-
Head opening fitting , seat new making, head facing and valve & Guide change head bolt with half set. packing kit-
Repairing of wiring with replacement of fuse box, Head light , Indicator , Back light, LT.wire and starting switches and tapes etc-
Replacement of Battery terminal lead with socket- (-ve), (+ve) -
clutch plate/clutch disc assly-Leyland
Pressure plate assly-
Lever kit with bearing-( SKF/NRB)-
Fly wheel assly-
Water pump assly-
Exhaust manifold-
Fan belt-cogged type
Mobil filter plate-
Oil breather with pipe& clamp-
Oil gauge-43”-
Clutch housing bolt-M12x40.
Manifold bolt-M10x65.
Hose flex. Pipe( Twist type)-
Main shaft-
Counter shaft-
1st speed gear-39T-
Shifter sleeve 4th,5th gear-
Engaging gear-4th/5th speed-
Synco.ring-5th sleeve
Synco.ring-2nd/3rd-sleeve
Main and 2nd Spring leaf (front)-
Helper Spring leaf (front)-
U.J.cross-Tusker model-
Yoke & Teeth new fitting-
Center bearing & Rubber set-
Center bearing Jhulla with bolt-
Steering box overhauling with materials-
Tie Rod end and Draug Link assly-
Brake Diaphragm new fitting (Front & Rear)-
Ritch new fitting-
Engine mounting-(F)-
Engine mounting-®-
Clutch lever kit-bush type-
Wheel rim churi & lock-
Repairing of Self starter and alternator assly with materials-
4 Wheel brake shoe with rivet , Wheel Cylinder assly and Greasing work-
Operator cabin, Both side Gate, furse , foot rest and Dash board Damaged portion repairing with materials-
Full Body 3 coat Painting , writing and numbering work
c) Labour cost
Skilled man-02nos
Un skilled man-02nos.
Total impact of GST for the purpose of CTC
SINHA SALES & SERVICES
MOHANLAL SAO
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .