| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹17.5 L (6.90%)Rejected-Finance | ₹2.7 Cr+₹17.5 L (6.90%) | L2 | Rejected-Finance Being L2 |
| 3 | Rejected₹2.0 CrRejected-Finance | ₹2.0 Cr | Rejected | Rejected-Finance Disqualified due to non fulfilment of bid capacity criteria. |
| Sl No | Description | Qty | Unit | M/S RINYA YANGFO COSTRUCTION L2 | Messrs North East Engineering and Construction Agency L3 | M/S TAKAR L1 |
|---|---|---|---|---|---|---|
| 0.00Items | ||||||
| 1.00 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 meter. | 836.38 | Cu.m | 220 ₹1,84,003.6 | 200 ₹1,67,276 Lowest | 250 ₹2,09,095 |
| 2.00 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 1,951.55 | Cu.m | 330 ₹6,44,011.5 | 400 ₹7,80,620 | 280 ₹5,46,434 Lowest |
| 3.00 | Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.) | 2,787.92 | Cu.m | 430 ₹11,98,805.6 | 500 ₹13,93,960 | 280 ₹7,80,617.6 Lowest |
| 4.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I) Ordinary soil
B) Mechanical Means
(i) c). Upto 3 m depth (with de-watering) | 925.99 | cum | 230 ₹2,12,977.7 | 110 ₹1,01,858.9 Lowest | 280 ₹2,59,277.2 |
| 5.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
II) Ordinary rock (not requiring blasting)
B) Mechanical Means
(ii) Depth upto 3 m ( with de-watering) | 2,160.64 | cum | 340 ₹7,34,617.6 | 150 ₹3,24,096 Lowest | 280 ₹6,04,979.2 |
| 6.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
III) Hard rock ( requiring blasting ) | 3,086.63 | cum | 430 ₹13,27,250.9 | 900 ₹27,77,967 | 250 ₹7,71,657.5 Lowest |
| 7.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) including formwork | 39.95 | Cu.m | 9,000 ₹3,59,550 | 8,100 ₹3,23,595 | 4,500 ₹1,79,775 Lowest |
| 8.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications including formwork
(C ) RCC Grade M20 (Using concrete mixer) | 248.02 | Cu.m | 12,000 ₹29,76,240 | 10,200 ₹25,29,804 | 4,800 ₹11,90,496 Lowest |
| 9.00 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications including formwork
(E) RCC Grade M20 (Using Concrete Mixer)
(q) Height 5m to 10m | 551.52 | Cu.m | 14,000 ₹77,21,280 | 11,250 ₹62,04,600 | 6,800 ₹37,50,336 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
2 Sept 2025, 2:00 pmClosed
GM Office of the HOP
Tato I II HEO H.E. Project Tato Shi Yomi District Arunachal Pradesh
Construction of RCC Abutments with Wing Walls and Allied Civil Works for 1 No of 230 FEET 40R GRSE Single Lane Modular Steel Bridges B1 under HEO Hydro Electric Project Arunachal Pradesh
2025_NEEPC_242948_1
NEEPCO/HOP/TTH/2025-26/01 dated 29.07.2025
Open Tender
Civil Works - Bridges
Item Rate
90 days
HEO HEP Tato Arunachal Pradesh
As per NIB
4 documents required · 4 mandatory
₹5,900
NEEPCO LTD
₹5.8 L
30 Oct 2025
30 Jul 2025
3 Sept 2025
30 Jul 2025
2 Sept 2025
30 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tenderdocument.pdf
Tender Documents • 0.51 MB
Tenderdocument_2.pdf
Tender Documents • 1.04 MB
Tenderdocument_3.pdf
Tender Documents • 0.54 MB
Tenderdocument_4.pdf
Tender Documents • 0.71 MB
Tenderdocument_5.pdf
Tender Documents • 1.19 MB
Tenderdocument_6.pdf
Tender Documents • 0.14 MB
Tenderdocument_7.pdf
Tender Documents • 0.40 MB
Tenderdocument_8.pdf
Tender Documents • 0.11 MB
BOQ.xls
BOQ • 0.30 MB
Tenderdocument_9.pdf
Tender Documents • 0.57 MB
Tenderdocument_10.pdf
Tender Documents • 5.38 MB
Tenderdocument_11.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .