| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.8 LAccepted-AOC | 1 | Accepted-AOC AEE/LIDEW-DIV/MPM/090/24-25 | |
| 2 | 2₹13.0 L+₹27,157 (2.13%)Rejected-Finance MANNARTHODI VEEDU VADAKKUMPPURAM VALANCHERY MALAPPURAM 676552 | MALAPPURAM | KERALA | 676552 | 2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 | |
| 4 | Rejected-Technical KARIPPOL PO MALAPPURAM PIN 676552 | MALAPPURAM | MALAPPURAM | KERALA | 676552 | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical KULANGARA HOUSE NIRMALAKKUNNU V K THENHIPALAM MALAPPURAM 676109 | THENHIPALAM | MALAPPURAM | KERALA | 676109 | - | Rejected-Technical L4 |
Tender Value
₹15.1 L
EMD Value
₹37,705
Closing Date
25 Sept 2024, 6:55 pmClosed
ASSISTANT EXECUTIVE ENGIEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP Annual Plan (2024-25), Project No 114-25 -Sound System And Pathway Interlocking For Athavanad Karippol G.H.S - Athavanad-General Civil Work
2024_LSGD_691132_5
DB1/TN/AEE/09/24-25
Open Tender
Civil Works - Buildings
Item Rate
330 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,950
₹37,705
Yes
28 Dec 2024
18 Sept 2024
27 Sept 2024
18 Sept 2024
25 Sept 2024
18 Sept 2024
Amount
side protection
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD45200/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
14.1.2:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand)
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
OD81850/2024-2025:(OD From 50.10.2 )Steel work for purlin/single section with M.S pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
14.5.1:Renewing glass panes, with putty and nails wherever necessary including racking out the old putty :Float glass panes of thickness 4 mm
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
interlocking
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
OD69871/2024-2025:OD 55.22 Supplying and laying interlocking tile 100 mm or nearest size thickness,minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness,then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc; complete.
OD99684/2024-2025:Dept. Interlocking Concrete Block Pavement Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD73917/2024-2025:Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc.
abdul jaleel m.t
Mohammed Rahees
SIBIN KULANGARA
SHANOOB
Bidder Name
Mohammed Rahees
abdul jaleel m.t
SHANOOB
SIBIN KULANGARA
ABDUL SHUKOOR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1075784.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .