Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹47.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹47.4 L+₹0.01 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | ₹47.4 L+₹0.01 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹47.4 L+₹0.01 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | ₹47.4 L+₹0.01 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SANTOSH M MALIK L1 | Shri Uday Bhiva Gawandi L2 | harischandra nagvekar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 12.15 | Cu.m. | 1,612.03 ₹19,586.16 | 841.5 ₹10,224.23 Lowest | 899.32 ₹10,926.74 |
| 2.00 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, Shingles, pebbles and all types of conglomerates laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered rock, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and back filling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas within all leads and all lifts etc as per specification and drawing and as directed by Engineer-in-charge etc. all complete. | 1,236.5 | Cu.m. | 246.68 ₹3,05,019.82 | 214.5 ₹2,65,229.25 Lowest | 230 ₹2,84,395 |
| 3.10 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass | 368.88 | Sqm | 585.06 ₹2,15,816.93 | 305.25 ₹1,12,600.62 Lowest | 327 ₹1,20,623.76 |
| 3.20 | Centering and shuttering including struttings, propping etc. and removal of formwork for : b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 151.8 | Sqm | 688.56 ₹1,04,523.41 | 359.25 ₹54,534.15 Lowest | 385 ₹58,443 |
| 3.30 | Centering and shuttering including struttings, propping etc. and removal of formwork for : c) Columns, Pillars, piers, abutments, posts and strut, square, rectangular, polygon in plan. etc. | 76.4 | Sqm | 859.63 ₹65,675.73 | 448.5 ₹34,265.4 Lowest | 499 ₹38,123.6 |
| 4.10 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 261.18 | Cu.m | 5,873.63 ₹15,34,074.68 Lowest | 6,570.44 ₹17,16,067.52 | 6,800 ₹17,76,024 |
| 4.20 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 64.92 | Cu.m | 6,407.51 ₹4,15,975.55 Lowest | 7,167.69 ₹4,65,326.43 | 6,820 ₹4,42,754.4 |
| 5.10 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level | 64 | Cu.m | 6,191.03 ₹3,96,225.92 Lowest | 6,925.5 ₹4,43,232 | 6,840 ₹4,37,760 |
| 5.20 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 21.46 | Cu.m | 9,239.57 ₹1,98,281.17 | 7,751.35 ₹1,66,343.97 | 6,600 ₹1,41,636 Lowest |
| 6.00 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 8,545.51 | Kg | 90.56 ₹7,73,881.39 | 101.31 ₹8,65,745.62 | 90 ₹7,69,095.9 Lowest |
Tender Value
₹69.9 L
EMD Value
₹1.4 L
Closing Date
10 Sept 2026, 10:00 amClosed
Executive Engineer VII WRD Dhargal
O/o EE VII WRD Dhargal
Re construction of existing Open Type Bandhara at Parsekarwada V P Arambol in Mandrem Constituency
2026_WRD_31565_1
WRD/WDVII/2026-27/TN-11/L4
Open Tender
Civil Works
Item Rate
180 days
Parsekarwada V P Arambol in Mandrem Constituency
As per tender documents
3 documents required · 3 mandatory
₹10,000
₹1.4 L
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 12.15 | Cu.m. | - | - |
| 2 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, Shingles, pebbles and all types of conglomerates laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered rock, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and back filling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas within all leads and all lifts etc as per specification and drawing and as directed by Engineer-in-charge etc. all complete. | 1,236.5 | Cu.m. | - | - |
| 3.1 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass | 368.88 | Sqm | - | - |
| 3.2 | Centering and shuttering including struttings, propping etc. and removal of formwork for : b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 151.8 | Sqm | - | - |
| 3.3 | Centering and shuttering including struttings, propping etc. and removal of formwork for : c) Columns, Pillars, piers, abutments, posts and strut, square, rectangular, polygon in plan. etc. | 76.4 | Sqm | - | - |
| 4.1 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 261.18 | Cu.m | - | - |
| 4.2 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: b) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 64.92 | Cu.m | - | - |
| 5.1 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level | 64 | Cu.m | - | - |
| 5.2 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 21.46 | Cu.m | - | - |
| 6 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 8,545.51 | Kg | - | - |
stage.html
html • 0.02 MB
finance_31947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_31947.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .