Deputy Commissioner, Gandhinagar Municipal Corporation (GMC), Gandhinagar
Providing, Supplying, lowering, laying 900 mm Dia RCC NP3 pipe line with encasing in riverfront for outlet from Bhat STP & Missing Drainage line of Koteshwar for GMC Area.
288504
180/2025-26
Open
Civil - All
Works
Gandhinagar
3 documents required · 3 mandatory
₹4,248
Deputy Municipal Commissioner,Gandhinagar Municipal Corporation,Gandhinagar
₹1.5 L
20 Mar 2026
20 Mar 2026
20 Mar 2026
1 Apr 2026
20 Mar 2026
Name of Work : - Providing, Supplying, lowering, laying 900 mm Dia RCC NP3 pipe line with encasing in riverfront for outlet from Bhat STP & Missing Drainage line of
Koteshwar for GMC Area
Sr No. ITEM OF WORK Unit Total Qty Rate in Words Amount
Providing and supplying lSI Standard R.C.C. pipes in standard lengths of following class and
diameter suitable for either collar joints or rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
1 departmental stores, stacking etc. complete.
'Note : One collar should be supplied with each full length plain ended RCC pipe, cost included in
rates below. One rubber ring should be supplied with each full length socketed pipe, cost included in
rates below. (IS - 458/ 1989)
(A) 450 mm dia RCC NP3 pipe Rupees One Thousand Three
Rmt 1950.00 1352.39 Hundred Fifty Two And Paise Thirty
(B) 600 mm dia RCC NP3 pipe Rupees One Thousand Nine Hundred
Rmt 1000.00 1933.14 Thirty Three And Paise Fourteen
(C) 900 mm dia RCC NP3 pipe Rupees Four Thousand Two Hundred
Rmt 210.00 4287.45 Eighty Seven And Paise Forty Five
Class NP4 Test Pressure 0.7 Kg/sq.cm
(D) 900mm diaRCC NP4 Pipe Rupees Seven Thousand Sixty Six
And Paise Ninety Seven Only
Providing bedding incl. ramming, watering, levelling consolidating etc. complete as per standard and
Rupees Three Hundred Thirty Two
2 instruction of engineer in charge as above with required quality sand brought from outside including cmt 619.00 332.29
And Paise Twenty Nine Only
3 Excavation for pipeline tenches for storm water line all with shoring and struting as per required
gradient and line including all safety provision using site rails and stacking excavated stuff including
up to all required lead cleaning the site etc. complete for all lift and strata as specified.In all sorts of
Soil and soft murrum.
0.0 to 1.5 m. Rupees Eighty Nine And Paise Eighty
1.5 to 3.0 m. Rupees Ninety Eight And Paise
Ninety Eight Only
3.0 to 4.5 m. Rupees One Hundred Four And Paise
4.5 to 6.0 m. Rupees One Hundred Ten And Paise
Sr No. ITEM OF WORK Unit Total Qty Rate in Words Amount
6.0 to 7.5 m. Rupees One Hundred Fourteen And
Paise Thirteen Only
Lowering, laying and jointing R. C. C. pipes of following diameters in proper position, grade and
alignment at all level as directed by Engineer-in-charge including conveyance from stores to site of
work, labour, giving hydraulic testing as per lSI code.R.C.C. PIPES (At any Depth)
(A) 450 mm dia RCC NP3 pipe Rupees One Hundred Seventy Two
And Paise Seventy One Only
(B) 600 mm dia RCC NP3 pipe Rupees Two Hundred Thirty And
Paise Twenty Eight Only
(C) 900 mm dia RCC NP3 pipe Rupees Three Hundred Forty Three
And Paise Forty Only
(D) 900mm diaRCC NP4 Pipe Rupees Three Hundred Forty Three
And Paise Forty Only
5 Constructing Junction circular Manhole of following size (inside clear)including excavation, refilling,
plain cement concrete (1:2:4) for foundation, CC channel (1:1.5:3) , 20 mm thick inside cement
plaster in OPC cement & 20 mm thick outside plaster in two coats PVC foot steps, brick masonary in
C.M. (1:5), excluding cost of manhole seat cover etc complete.
* Manhole Type "B" Circular type having inside diameter of 1200 mm for depth upto 4.0 m
Rupees Thirty One Thousand Three
Manhole type "B" upto 2.5 M depth Hundred Ten Only
6 Providing & Fixing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed. F.R.C.
Extra Heavy Duty (EHD-35) Machinehole Covers & Frames Cover: 728mm ø & 100 mm thick circular
cover, 35.00MT load design,100 x 2mm MS flat all round,16mm ø plain round bar for lifting the Rupees Two Thousand Four Hundred
cover & should be fitted with plastic cups. Frame:560mm ø clear opening, -888 x 888 x 175mm. On Nos 115.00 2403.80
Three And Paise Eighty Only
the upper periphery off rame 25x3 mm wide MS flat should be well embed in concrete to protect
the edges off rame. FRC E.H.D.-35 Machinehole cover & frame described as above.
7 Extra rate over item of excavation of earth for excavation of asphalt pavement/RCC of thickness
upto 0.30 meter including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.
comp. with stacking the material as directed. (i) up to 0.30 meter (By any type of Breaker Machine Sqmt 2660.50 202.00 Rupees Two Hundred Two Only
or R.C.C Cutter machine including cost of operator, fuel & transportation etc complete.
8 Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of surplus stuff as
Rupees Twenty Two And Paise
directed within a radius of 3 km. m3 11531.20 22.22
Twenty Two Only
(1) refilling as directed
9 Core cutting 1500x1500mm size and Dismentaling of the existing structure including removing and
stacking the dismentelled materials as and directed (b) R.C.C Work 500mm thick No 2.00 5050.00 Rupees Five Thousand Fifty Only
Sr No. ITEM OF WORK Unit Total Qty Rate in Words Amount
10 Providing and casting in situ C.C. in grade M-15 (approx. corresp. to prop. 1:2:4) (proportions as
per mix design or as per Table 9 of IS456 2000 in masses by weigh batching ) using granite,
quartzite trap metal of size 6 mm to 20 mm for RCC work, including scaffolding centering, form Rupees Four Thousand Eight
work, needle vibrated consolidation, curing comp. up to 6 meter depth or height (excluding cost of cmt 150.94 4889.41 Hundred Eighty Nine And Paise Forty
reinforcement and neat finishing) with centering and shuttering/deshuttering etc. comp. for One Only
structure for other than water retaining.
11 Dewatering from pipe line trenches with all lead and lift including all rent ,labour and material and
carting use for dewatering In all sorts of soil and soft murrum, hard murrum and boulders, soft Rupees Seventeen And Paise
rocks, hard rock upto 1.5 mt depth from G.L.(GWSSB SOR 22-23 It-13 page-40) Seventeen Only
12 Providing and refilling with GSB incl. ramming, watering, levelling consolidating etc. complete as per
Rupees Three Hundred Fifty Four
standard and instruction of engineer in charge as above with required quality sand brought from Cmt 2843.75 354.99
And Paise Ninety Nine Only
outside including all lead.
VERTICAL DROP MACHINE HOLE
Constructing RCC Chamber built in RCC M30 grade concrete with TMT Fe-500 reinforcement
13 including PCC M 15, RCC M30 for wall, base slab and top slab, including formwork etc. complete.
Concrete work should be fair finish.
PCC M-15 Rupees Three Thousand Two
* cmt 0.51 3248.16 Hundred Forty Eight And Paise
i) Top Slab Rupees Eight Thousand Nine
cmt 0.23 8917.29 Hundred Seventeen And Paise
Twenty Nine Only
ii) Bottom Slab Rupees Eight Thousand Nine
cmt 0.45 8917.29 Hundred Seventeen And Paise
Twenty Nine Only
iii) Wall Rupees Eight Thousand Seven
cmt 5.25 8769.83 Hundred Sixty Nine And Paise Eighty
Reinforcement TMT Fe-500 Rupees Sixty Eight And Paise Thirty
Brick masonary wall inside of chamber 230mm in CM 1:6 Rupees Two Thousand Eight
* cmt 3.59 2860.32 Hundred Sixty And Paise Thirty Two
Rupees Two Hundred Ten And Paise
* 20mm thick water proof cement plaster in CM 1:3 smt 60.00 210.08
SAY Total Amount
SAY Total Amount
Sr No. ITEM OF WORK Unit Total Qty Rate in Words Amount
I / We am / are willing to carry out the work at __________% above / below __________ percentage (should be written in figures and words) of the estimated rates mentioned above. Amount
Estimated Amount put to Estimated Amount put to
Deduct _________ % Below. Add _________ % Above.
1 All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
2 All columns in the Schedule should be filled in ink and the total of the entire in the last columns should be struck by the contractor under his signature.
3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture, weather etc
4 To be continued on additional sheets, if found necessary.
5 The Labour Cess will be deducted as per prevailing rules i.e.1% of the work done.
6 Credit Value of Dismantle Material Rs.0.00 will be recovered in 1st RA bill of Contractor.
7 The bituminous work shall be carried out by the contractor or as under by utilizing.
8 For abnormal high or law rates payment of such items shall be regulated as per Govt. Circular letter No. Parach-102008-61-S dated 27-11-2008 attached with tender papers.
9 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
10 GST and Income tax TDS will be deducted at a source while making payments of bills.
11 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
Deputy Executive Engineer Add. City Engineer
Gandhinagar Municipal Corporation Gandhinagar Municipal Corporation
Gandhinagar Gandhinagar
Gandhinagar Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD GMC.pdf
Schedule-B.pdf
Technical Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .