| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-Finance | ₹17.9 L | L1 | Accepted-Finance Lowest Quoted bidder |
| 2 | L2₹19.0 L+₹1.1 L (6.09%)Accepted-Finance | ₹19.0 L+₹1.1 L (6.09%) | L2 | Accepted-Finance Second lowest Quoted bidder |
| 3 | L3₹19.2 L+₹1.3 L (7.10%)Rejected-Finance | ₹19.2 L+₹1.3 L (7.10%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹19.5 L+₹1.6 L (8.95%)Rejected-Finance | ₹19.5 L+₹1.6 L (8.95%) | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | roshan engineering works L1 | SREYAS L3 | JOSE A L4 | Mr. Muhammad Aneez L2 |
|---|---|---|---|---|---|---|---|
| 1.00Renovation and beautification works | |||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.36 | cum | 1,799.71 ₹4,252.71 Lowest | 1,927.51 ₹4,554.71 | 2,000 ₹4,726 | 1,900 ₹4,489.7 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 18.43 | cum | 2,147.99 ₹39,598.2 Lowest | 2,300.51 ₹42,409.9 | 2,500 ₹46,087.5 | 2,275 ₹41,939.63 |
| 1.00 | 30.2.12:Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | 432 | sqm | 76.28 ₹32,952.96 Lowest | 81.69 ₹35,290.08 | 90 ₹38,880 | 80 ₹34,560 |
| 1.00 | 30.2.28:Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. | 9 | cum | 571.28 ₹5,141.52 Lowest | 611.84 ₹5,506.56 | 676 ₹6,084 | 605 ₹5,445 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 33.08 | cum | 303.96 ₹10,053.78 Lowest | 325.55 ₹10,767.89 | 359 ₹11,874.28 | 320 ₹10,584.32 |
| 1.01 | OD43808/2026-2027:DRY RUBBLE MASONRY with out concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels,cost and conveyance of all materials, labour charges etc complete | 21.52 | cum | 3,374.47 ₹72,611.85 Lowest | 3,614.08 ₹77,767.77 | 3,500 ₹75,313 | 3,580 ₹77,034.44 |
| 1.01 | OD7646/2026-2027:DR with Departmental rubble.Dry rubble masonry with out concrete levelling course masonry using DEPARTMENTAL RUBBLE including all labour charges. | 12.9 | cum | 1,449.92 ₹18,711.22 Lowest | 1,552.87 ₹20,039.79 | 1,715 ₹22,132.08 | 1,530 ₹19,744.65 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 51.58 | cum | 7,050.25 ₹3,63,673.05 Lowest | 7,550.86 ₹3,89,496.01 | 7,300 ₹3,76,555.9 | 7,490 ₹3,86,356.67 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 34.9 | cum | 269.11 ₹9,392.48 Lowest | 288.22 ₹10,059.45 | 318 ₹11,098.84 | 285 ₹9,947.07 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
5 Aug 2026, 3:30 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer, LID EW Subdivision, Konni block Panchayat
Konni BP 2026-27 (Proj. no.94/27) Renovation and beautification works to Transferred institutions and Konni block office compound.-Renovation works-General Civil Work
2026_LSGD_862779_14
04/AE/LSGD/KNI/2026-27
Open Tender
Civil Works - Others
Item Rate
270 days
Elakollur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
13 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation and beautification works | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.002 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1 | cum | - | - |
| 1.003 | 30.2.12:Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | - | sqm | - | - |
| 1.004 | 30.2.28:Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. | - | cum | - | - |
| 1.005 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.006 | OD43808/2026-2027:DRY RUBBLE MASONRY with out concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels,cost and conveyance of all materials, labour charges etc complete | - | cum | - | - |
| 1.007 | OD7646/2026-2027:DR with Departmental rubble.Dry rubble masonry with out concrete levelling course masonry using DEPARTMENTAL RUBBLE including all labour charges. | 1 | cum | - | - |
| 1.008 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.009 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1459679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1459679.xls
BOQ • 0.33 MB
merged.pdf
Tender Documents • 2.16 MB
aff.pdf
Tender Documents • 0.24 MB
Epaymt.pdf
Tender Documents • 0.23 MB
FOT.pdf
Tender Documents • 0.25 MB
Ipact.pdf
Tender Documents • 0.23 MB
Pagree.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .