Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 L A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | L1 | - | |
| 2 | L2₹10.0 L+₹1.3 L (15.2%) A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | L2 | - | |
| 3 | L3₹10.2 L+₹1.6 L (18.4%) A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | L3 | - | |
| 4 | L4₹10.8 L+₹2.2 L (25.2%)Financial bid opened A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | L4 | Financial bid opened | |
| 5 | L5₹11.4 L+₹2.8 L (32.2%) A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) | L5 | - |
| Sl No | Description | Qty | Unit | WASIM CONSTRUCTION L1 | MOHD SARWAR L5 | MANOJ KUMAR L10 | PRATIK SONI L9 | M/S RAVENDRA SINGH L7 | SANJEEV KUMAR L8 | M/s Sona Engineers L6 | SHAHNAWAZ AHMAD L4 | Mohd Suhail L3 | MOHD NASIM L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | -65.89 ₹8,65,021.75 Lowest | -54.89 ₹11,43,979.22 | -36.37 ₹16,13,642.17 | -38.09 ₹15,70,023.36 | -48.11 ₹13,15,918.47 | -42.03 ₹14,70,105.87 | -51.51 ₹12,29,695.25 | -57.31 ₹10,82,608.58 | -59.6 ₹10,24,534.71 | -60.7 ₹9,96,638.96 |
Tender Value
₹25.4 L
EMD Value
₹50,720
Closing Date
29 Sept 2023, 3:00 pmClosed
EE-Dehradun
ADITYA KUMAR DOKANIA
EE CIVIL 1 CPWD Dehradun
A/R AND M/O RESIDENTIAL BUILDING SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS) Subwork/Packages: A/R AND M/O RESIDENTIAL SOI, HBE, DEHRADUN DURING 2023-24 (SH: PERIODICAL PAINTING WORK IN QUARTER AND OTHER MISCELLANEOUS WORKS)
54448
85/EE/C-I/CPWD/DDUN/2023-24
OPEN
Civil Works - Others
NCB
5 months
Dehradun, Uttarakhand
4 documents required · 4 mandatory
₹50,720
Not Applicable
29 Sept 2023
21 Sept 2023
29 Sept 2023
29 Sept 2023
29 Sept 2023
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT85.pdf
document • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .