Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC JATANBARI KARBOK GOMATI TRIPURA | L1 | Accepted-AOC Price offered by L1 bidder is reasonable and accepted by STC-II | |
| 2 | L2₹25.2 L+₹37,558.93 (1.52%)Rejected-Finance | L2 | Rejected-Finance Price offered/ Rate quoted by L2 bidder is higher compare to price offered by L1 Bidder |
Tender Value
₹20.5 L
EMD Value
₹41,024
Closing Date
15 Jan 2022, 5:30 pmClosed
The DGM,ED No.I,TSECL,Banamalipur
O/O The DGM,ED No.I, Banamalipur,Agartala
Shifting of Steel tubular poles/PCC poles/Joist poles along with sub-stations from Golchakkar to Fire service chowmuhani under the jurisdiction of ESD IV,TRTC complex,Agartala
2022_POWER_25245_1
DGM/ED I/TSECL/2021-22/12
Open Tender
Electrical Works
Works
180 days
work
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹41,024
O/o The AGM,EC No.I,TSECL
23 Feb 2022
1 Jan 2022
17 Jan 2022
1 Jan 2022
15 Jan 2022
10 Jan 2022
2 Jan 2022 - 7 Jan 2022
10 Jan 2022
Amount
SCHEDULE - A (Supply)
Supply of 11.0 mtr. Long steel tubular pole with base plate. (Designation 410:SP-54) conforming to IS : 2713 (Part -I & II) :1980 and latest amendment.
Supply of 60 Kg Salt & 55 Kg Charcoal ( for 1 Pit) for earthing
Supply of 2.5 mtr. Long,40 mm dia GI Pipe (Make: TATA/JINDAL) for earthing
Supply of Fabricated Stay clamps of assorted size of MS flat (50x6 mm) with double coat of Red oxide primer coating
Supply of Fabricated Bracket clamps of assorted size of MS flat (50x6 mm) with double coat of Red oxide primer coating
Supply of MS Nuts & Bolt i/c washer of assorted size ISI marked machine made
Supply of 65X65X6 mm M.S. Angle confirming to IS:2062, Grade 'A' quality.
Supply of 75X40X40X6 mm M.S. Channel confirming to IS:2062, Grade 'A' quality.
Supply of 100X50X50X6 mm M.S. Angle confirming to IS:2062, Grade 'A' quality.
Supply of 11 KV,200 Amps, Gang operated AB switch (3 phase)
Supply of 11 KV ,Drop out fuse unit(3 phase)
Supply of 185 Sq. mm Bi-metallic lugs
Supply of 120 Sq. mm Bi-metallic lugs
SCHEDULE -B (Dismantling and Erection)
Dismantling of11 Mtr. Length of steel tubular pole at any kind of soil including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Dismantling of 8.0 Mtr. Length of steel tubular pole at any kind of soil including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Dismantling of 9.0 Mtr. Length of P.C.C. pole at any kind of soil including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Dismantling of 8.0 Mtr. Length of P.C.C. pole at any kind of soil including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Dismantling of Joist pole upto length of 13 mtr. at any kind of soil including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Dismantling of V-cross arm,75x40x40x6 mm MS channel
Dismantling of MS channel cross arm, 0.3 mtr.Long, (75x40x40x6) mm
Dismantling of MS channel cross arm,1.2 mtr.Long, (75x40x40x6) mm
Dismantling of MS channel cross arm, 2.8 mtr.Long,(75x40x40x6) mm
Dismantling of MS channel cross arm,2.2 mtr.Long, (75x40x40x6) mm
Dismantling of MS channel cross arm, 2.8 mtr.Long,(100X50X50X6) mm
Dismantling of MS channel cross arm, 0.8 mtr.Long,(100X50X50X6) mm
Dismantling of 11 KV Pin Insulator along with pin
Dismantling of 11 KV single Disc Insulator with necessary fittings.
Dismantling of 11 KV DOF unit set of three nos. i/c necessary connections
Dismantling of 11 KV 200 Amp, GOS unit set of three nos. i/c necessary connections
Dismantling of 9 KV,5KA single pole metal oxide gapless type LA,including necessary connection.
Dismantling of "C" type bracket for LT 5-wire of 65x65x6 mm,MS Angle
Dismantling of MS channel cross-Arm bracket of 4 wire ,upto 1100 mtr. Long of 75x40x40x6 mm
Dismantling of MS channel cross-Arm bracket of 2 wire ,upto 1100 mtr. Long of 75x40x40x6 mm
Dismantling of shackle isulator of size 75mmx90 mm/ 100mmx15mm with straps & bolts/U clamp on poles
Dismantling of ACSR 6/1/2.59 mm dia WEASEL i/c coiling etc. complete as required
Dismantling of 11/0.43 KV,3-Phase 100 KVA of Distribution Transformer on pole with necessary connections
Dismantling of 11/0.43 KV,3-Phase 315 KVA of Distribution Transformer on pole with necessary connections
Dismantling of single phase service connections with PVC cable from near by electrical pole to premises i/c GI wire,Reel insulator including Refixing.
Dismantling of three phase service connections with PVC cable from near by electrical pole to premises i/c GI wire,Reel insulator including Refixing.
Erection of 11 Mtr. Long steel tubular pole at any kind of soil upto depth of 1/6 th of pole height, including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Erection of 9 Mtr. Long steel tubular pole at any kind of soil upto depth of 1/6 th of pole height, including excavation of earth , refilling the pit with soil upto ground level, ramming and making complete in all respect.
Grouting Steel Tubular pole with CC work of ratio1:2:4 ( one cement: two sand: four Jhamma Bricks) aggregate of 20 mm nominal size includung supply of cement,sand and brick aggregate complete with excavation,reffiting of earth ramming along with centering and shuttering as [email protected] cum/pole as per direction of Engg-in-Charge
Eerection of stay set direct in earth complete with 19 mm x 1800mm long stay road, anchor plate of size 300 x 300x 8 mm, turn buckle, 7/3.15 mm dia GI stranded stay wire and stay insulator with supply of MS clamp & MS nuts bolts etc as reqd. and making complete in all respect.
Erection of of MS channel cross arm,0.8mtr.Long,(100x50x50x6)mm ( excluding the cost of back clamp,Nuts & bolts)
Erection of of MS channel cross arm,2.8 mtr.Long, (100x50x50x6)mm ( excluding the cost of back clamp, Nuts & bolts)
Erection of of MS channel cross arm,0.3 mtr.Long, (75x40x40x6) mm( excluding the cost of back clamp,Nuts & bolts)
Erection of of MS channel cross arm,1.2 mtr.Long, (75x40x40x6) mm( excluding the cost of back clamp,Nuts & bolts)
Erection of of MS channel cross arm,2.2 mtr.Long,(75x40x40x6) mm( excluding the cost of back clamp,Nuts & bolts)
Erection of of MS channel cross arm,2.8 mtr.Long,(75x40x40x6) mm( excluding the cost of back clamp,Nuts & bolts)
Erection of "V"-cross arm,75x40x40x6 mm MS channel (excluding the cost of back clamp,Nuts & bolts)
Erection of MS Angle cross arm,1.5 mtr.Long,(65x65x6) mm (excluding the cost of back clamp,Nuts & bolts)
Erection of MS Angle cross arm,2.5 mtr.Long,(65x65x6) mm (excluding the cost of back clamp,Nuts & bolts)
Erection of MS Angle cross arm/GOS handle Bracket,(65x65x6) mm (excluding the cost of back clamp,Nuts & bolts)
Erection of "C" type bracket for LT 5-wire of 65x65x6 mm,MS Angle (excluding the cost of back clamp,Nuts & bolts)
Erection of MS channel cross-Arm bracket of 4 wire / upto 1.2 mtr. Long of 65x65x6 mm(excluding the cost of back clamp,Nuts & bolts)
Erection of MS channel cross-Arm bracket of 2 wire / upto 1.2 mtr. Long of 65x65x6 mm(excluding the cost of back clamp,Nuts & bolts)
Installation & positioning of 11/0.43 KV,3 phase 100 KVA of Distribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories, components as required for making complete in all respect for energizing.
Installation & positioning of 11/0.43 KV,3 phase 315 KVA of Distribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories, components as required for making complete in all respect for energizing
Erection of 11 KV Polymer Pin insulator
Erection of 11 KV single Disc Insulator with necessary fittings.
Erection of 11 KV DOF unit set of three nos. i/c necessary connection complete as per technical specification.(excluding the cost of back clamp,Nuts & bolts)
Erection of 11 KV 200 Amp, GOS unit set of three nos. i/c necessary connection complete as per technical specification(excluding the cost of back clamp,Nuts & bolts)
Erection of 9 KV, 5 KA single pole metal oxide gapless type LA, including necessary connection complete as per technical specification.
Erection of Shackle insulator with Straps & bolts/U clamp on poles(excluding the cost of straps/ U Clamp, nuts & Bolts)
Laying & stringing of (single conductor) ACSR 6/1/2.59 mm dia WEASEL i/c hoisting & binding etc. complete as required
Laying & stringing of (single conductor) ACSR6/1/3.35 mm dia RABBIT i/c hoisting & binding etc. complete as required
Laying & stringing of (single conductor) 8 SWG GI Wire,i/c hoisting & binding complete as required
Erection of Danger Plate on OH lines(11 KV/415 volts)
Erection of 11 KV protective guarding by GI wire 8 SWG as per technical specification across road/River/Telecom line etc. in horizontal formation complete
Erection of protective guarding/cross lacing for415/240 Volt line by GI wire 8 SWG as per technical specification across road/River/Telecom line etc. in horizontal/vertical formation complete with spool/Reel Insulator
Earthing with GI pipe 2.5 mtr. Long nd 40 mm dia including excavation, refilling with alternate layer of salt & Charcoal as per drawing ( excluding Supply of G.I. pipe,Salt and Charcoal, GI wire nuts & bolts etc as required)
Maintaining adequate clearance from overhead live conductors by trimming of tree branches or way leaves
Fabrication of cross arms by MS channel/MS Angle as per specification
Applying priming coat with ready mixed primer/red oxide( two or more coats) of approved quality on 11.0 mtr. long steel tubular poles i/c channel ,angle etc. and painting ( two or more coats) with Aluminium paint of approved quality to give an even shape.
Applying priming coat with ready mixed primer/red oxide( two or more coats) of approved quality on 9.0 mtr. long steel tubular poles i/c channel ,angle etc. and painting ( two or more coats) with Aluminium paint of approved quality to give an even shape.
SCHEDULE-C (Carrying)
Carriage of 9.00 mtr. Length of Steel tubular poles by mechanical Transport from ESD Site / MM Sub-Division Store to working site including loading,Unloading & stacking. as required for maximum 8(eight) poles
Carriage of 9.00 mtr. Length of Steel tubular poles by mechanical Transport from ESD Site / MM Sub-Division Store to working site including loading,Unloading & stacking etc. as required beyond 8(eight) poles.
Carriage of materials such as cable,AAC,AAAC,ACSR,GI Wire wire,Stay set,Insulators etc. by mechanical Transport from the ESD site/ MM sub-division Store to working site i/c loading,unloading & stacking as required.
Carriage of G.O.S., D.O.F., L.A. etc. by mechanical Transport from the ESD site/ MM sub-Division Store to working site i/c loading,unloading & stacking as required.
Carriage of 11.00 mtr. Length of Steel tubular poles (dismantled) by mechanical Transport from working site to ESD stack yard including loading,Unloading & stacking etc. as required for maiximum 6(six) poles.
Carriage of 11.00 mtr. Length of Steel tubular poles (dismantled) by mechanical Transport from working site to ESD stack yard including loading,Unloading & stacking etc. as required for beyond 6(six) poles.
Carriage of 8.00 mtr. Length of Steel tubular poles (dismantled) by mechanical Transport from working site to ESD yard including loading,Unloading & stacking etc. as required for maximum 8(eight) poles
Carriage of 8.00 mtr. Length of Steel tubular poles (dismantled) by mechanical Transport from working site to ESD stack yard including loading,Unloading & placing on Base etc. as required for beyond 8(eight) poles
Carriage of Joist poles (dismantled) upto length of 13 mtr. by mechanical Transport from working site to ESD stack yard including loading,Unloading & Stacking etc. as required
Carriage of materials (dismantled) such as cable,AAC,AAAC,ACSR,GI Wire wire,Cross Arm,Stay set,Insulators etc. by mechanical Transport from to working site to ESD yard i/c loading,unloading & stacking as required.
Carriage of G.O.S., D.O.F., L.A. etc.(dismantled) by mechanical Transport from working site to ESD yard i/c loading,unloading & stacking as required.
M/S GHOSH ELECTRICAL ENGINEERING
Bidder Name
RATAN PAUL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .