Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.0 L
Closing Date
27 Mar 2026, 3:30 pmClosed
Comprehensive Annual Maintenance Contract of Integrated Power Supply (IPS) Systems installed in Karwar Region of Konkan Railway for TWO years.
KR-KAWR-SG-ET-2026-03~KRCL
KR-KAWR-SG-ET-2026-03
Single
Works - General
24 Months
Bundi, Rajasthan
₹0
₹2.0 L
27 Mar 2026
6 Mar 2026
13 Mar 2026
A-CAMC of IPS at 39 locations for Two years
Comprehensive AMC for IPS System SMPS based as per RDSO spec No. RDSO/SPN/165/2012 with amendment 5 or latest installed at TOK, SL, MULK, NAND, PDD, INJ, UD, BKJ, KUDA, SEN, BIJR, SHMI, BTJL, MRDW, MANK, HNA, KT, MRJN, GOK, ANKL, HAA, KAWR, AT, LC89, LC77 & LC62 in the Karnataka State of KAWR Region for Two Years Above/
Comprehensive AMC for IPS System SMPS based as per RDSO spec No. RDSO/SPN/165/2012 with amendment 5 or latest installed at LOL, CNO, BLLI, MAO, Auto hut, MJO, VEN, KRMI, THVM, PERN, LC49, LC43 & LC42 in the Goa state of KAWR Region for Two Years
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .