Tender Value
Refer Docs
EMD Value
₹5,250
Closing Date
6 Jul 2023, 3:00 pmClosed
Block Development Officer(V.P)
Block Development Office, K.Paramathi Block
Construction of cremation shed, CC Road and Water Supply at Kattumunuur H/O Munnur Pt
2023_RDTN_333999_11
K.Paramathi Block - AGAMT-II-2023-24
Open Tender
Civil Works
Item Rate
90 days
K.Paramathi Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,250
Yes
10 Jul 2023
1 Jul 2023
6 Jul 2023
1 Jul 2023
6 Jul 2023
1 Jul 2023
Amount
Name of the Work : Construction of cremation shed & CC Road & Water Supply at Kattumunuur H/O Munnur
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc.
Brick work in cm 1:5 mix (one cement and five sand) using fly ash bricks ground maded of size 23x11x7 cm including curing, finishing and cost & Conveyance of all materials
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying Fabricating and placing in postion of ribbed steel roads for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors
RCC 1 : 1/2 : 3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering, Shuttering and cost of reinforement grill , out including curing etc
Refilling the basement with excavated earth other than sand complying the
Plastering surfaces of RCC items such as slabs, beams , sunshades with cement mortar 1 : 3 - 10mm thick including packing, etc
Plastering with cm 1 : 5 mix to 12 mm thick including cost and conveyance of all materials in all floors etc.
White washing two coats using shell lime including cost and conveyance of
Painting two coats using Exteror emulsion including cost and conveyance of all materials to site and all labour charges etc
Name of the Work : Construction of CC Road at Kattumunuur H/O Munnur
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost, conveyance and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc.
Name of the Work : Construction of Water Supply at Kattumunuur H/O Munnur
Supply and cost of 63mm dia 4KSC PVC pipe with ISI mark Etc
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Laying and jointing of PVC and GI pipe into the trench with proper grading and alignment and all labour charges etc
Refilling the pipe line trench with excavated earth other than sand complying the standard specification etc,
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S PALANISAMY AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .