Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC | ₹32.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹32.7 LRejected-Finance N A | FARIDABAD | HARYANA | 121004 | ₹32.7 L | L2 | Rejected-Finance L2 |
Tender Value
₹32.3 L
EMD Value
₹65,000
Closing Date
25 May 2026, 12:00 pmClosed
Executive Engineer
Rural Engineering Department, Pilibhit
In village Noorpur construction of interlocking road and drain from main road via primary school to Prempals house and Chandrasens house via Kotedar and Madhhi till main road intersection development block Lalourikheda
2026_REDUP_1147359_4
1265/RED/Etender/Bond Clerck/2025-2 date 31-03-26
Open Tender
Civil Works
RED PILIBHIT
In village Noorpur construction of interlocking road and drain from main road via primary school to Prempals house and Chandrasens house via Kotedar and Madhhi till main road intersection development block Lalourikheda
2 documents required · 2 mandatory
₹2,354
₹65,000
Rural Engineering Department, Pilibhit
4 Jul 2026
12 May 2026
25 May 2026
12 May 2026
25 May 2026
12 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation including lift 1.5m and lead 30m including all labour material T & P etc. all cost complete (Sl. No. 251) | 133.01 | Cum | 198.55 | ₹26,409.14 |
| 2 | Concrete with 4cm gauge Brick Ballast, Fine sand and cement in propration 12:6:1 in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 273) | 43.34 | Cum | 3,519.75 | ₹1,52,545.97 |
| 3 | Frist class brick work in 1 : 4 cement and coarse sand mortar in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 305) | 122.65 | Cum | 5,225 | ₹6,40,846.25 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) | 158.57 | Cum | 3,790.12 | ₹6,00,999.33 |
| 5 | 12 mm thick plaster with cement and coarse sand morta in 1 : 5 ratio including supply of all material, labour and T&P etc. requried for proper completion of the work Sl. No. 584(I) | 305.06 | Sqm | 206.15 | ₹62,888.12 |
| 6 | Supply and lying of factory made 80 mm. thick tiles of precosst compressed C.C. passing minimum 30 megapfscle compssive strenght I.SI. marked including levelling and dressing of surface to required level and slope filling joints with local sand including cost of all materials labour and T&P etc.but excluding cost of local sand required for proper completion of the work asper directed by E/I.CH.NO 20,NEW ITEM (1) | 1,921.8 | Cum | 831.25 | ₹15,97,496.25 |
| 7 | Cement concrete with 2cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. requried for proper completion of the work (Sl. No. 279(I)) | 12.06 | Cum | 7,441.35 | ₹89,742.68 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 3000 m as per Technical Specification Clause 301.5, | 31.6 | Cum | 185.16 | ₹5,851.06 |
| 9 | R.C.C work with cement approved coarse sand and 2cm gauge approved stone ballast in the proportion of 1:1.5:3 including supply of all materials, labour and T&P etc. requried for proper completion of the work, excluding supply of reinforce cement (Sl. No. 283a) | 2.05 | Cum | 8,436.95 | ₹17,295.75 |
| 10 | Mild steel or iron work in planeor R.C.C. work including cutting bending and fixing position including all completion of the work (S.I. No. 504) | 2.01 | Qtl | 8,316.3 | ₹16,715.76 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2146723.xls
BOQ • 0.29 MB
pdf.pdf
Tender Documents • 2.04 MB
Download all tender documents and submit your bid