| 1.00BUILDING RENOVATION | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.34 | cum | 330.41 ₹1,102.25 | 327.6 ₹1,092.87 Lowest |
| 1.00 | OD361908/2025-2026:Modified DAR 15.7.4 Demolishing laterate masonry by manually/mechanically and stacking serviceable materials and disposal of unserviceable materials within 50 m as per directions. | 2.55 | cum | 1,558.7 ₹3,977.8 | 1,545.45 ₹3,943.99 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.38 | cum | 7,286.51 ₹2,798.02 | 7,224.57 ₹2,774.23 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.2 | sqm | 354.69 ₹1,489.7 | 351.68 ₹1,477.06 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 16.2 | sqm | 926.37 ₹15,007.19 | 918.5 ₹14,879.7 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.56 | cum | 9,634.13 ₹24,644.1 | 9,552.24 ₹24,434.63 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 193.57 | kilogram | 103.26 ₹19,988.55 | 102.38 ₹19,818.21 Lowest |
| 1.01 | OD361936/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1.62 | cum | 3,668.07 ₹5,942.27 | 3,636.89 ₹5,891.76 Lowest |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 0.88 | cum | 8,299.77 ₹7,278.9 | 8,229.22 ₹7,217.03 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
27 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Office of Assistant Engineer LID and EW section Pulikkal GP
other
2025_LSGD_823129_4
17_2025_26AE_LID and EW_PK
Open Tender
Civil Works - Others
Item Rate
180 days
PULIKKAL
Please refer Tender documents.
10 documents required · 10 mandatory
₹560
Yes
₹6,355
Yes
25 Feb 2026
20 Dec 2025
29 Dec 2025
20 Dec 2025
27 Dec 2025
20 Dec 2025
BUILDING RENOVATION
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD361908/2025-2026:Modified DAR 15.7.4 Demolishing laterate masonry by manually/mechanically and stacking serviceable materials and disposal of unserviceable materials within 50 m as per directions.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD361936/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
OD362101/2025-2026:Laterite sliced cladding- Providing and fixing laterate cladding with 20mm thick gang saw cut stone with (machine cut edges) of uniform colour and size upto 30cmx15cm as per Architectural drawing and direction of Engineers in-charge. Laterite stone
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
15.23.2:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm
OD362889/2025-2026:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
OD362409/2025-2026:Providing and laying 60 mm thick factory made cement concrete interlocking paver block tiles of good quality made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of 6mm stone aggregate, filling the joints with M sand etc. all complete as per the direction of Engineer-incharge.(Based on 16.68)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
439SBD.pdf
Tender Documents • 1.64 MB
BOQ_1379681.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .