| 1 | L1₹12.3 LAdmitted-Finance | ₹12.3 L | L1 | Admitted-Finance |
| 2 | L2₹12.8 L+₹47,770 (3.89%)Admitted-Finance R O VILLAGE GOPAL CHOWK PO MAHADEV TEHSIL SUNDERNAGAR DISTRICT MANDI HP 175018 | MANDI | HIMACHAL PRADESH | 175018 | ₹12.8 L+₹47,770 (3.89%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ajay Kumar Sharma L2 | Guild Infrastructures Pvt Ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead and lift as directed by Engineer-in-charge.
a)All kinds of soil per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 36 | Cum | 1,350 ₹48,600 | 1,250 ₹45,000 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2 | Cum | 8,100 ₹16,200 | 8,000 ₹16,000 Lowest |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 43 | Sqm | 1,200 ₹51,600 Lowest | 1,200 ₹51,600 Lowest |
| 4.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources , Portland Pozzolana /Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
a)All works upto all level
i)Concrete of M25 grade with minimum cement content of 330 kg /cum as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 20 | Cum | 14,000 ₹2,80,000 | 13,000 ₹2,60,000 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level. Thermo-Mechanically Treated bars of grade Fe-500D or more as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 500 | Kg | 115 ₹57,500 Lowest | 115 ₹57,500 Lowest |
| 6.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 1,688 | kg | 230 ₹3,88,240 | 220 ₹3,71,360 Lowest |
| 7.00 | Supplying, hoisting and stretching to specified profile wire rope and fixing in position steel accessories like clamps ,suspenders, rope grips, U-Bolts ancherage bolts with pulleys etc. all complete as per the entire satisfaction and direction of Engineer-in-charge upto all lead and lifts. | 0.57 | MT | 2,35,000 ₹1,33,950 | 2,30,000 ₹1,31,100 Lowest |
| 8.00 | Shifting, re-alignment and fixing of GI pipeline-150mm dia as per the required position with all necessary material & arrangements all complete as per the entire satisfaction and direction of Engineer-in-charge upto all lead and lifts. | 2.12 | MT | 1,42,000 ₹3,01,040 | 1,40,000 ₹2,96,800 Lowest |
Tender Value
₹6.8 L
EMD Value
₹13,633
Closing Date
14 Aug 2026, 6:00 pmClosed
Superintending Engineer, North Campus of IIT M
O/o Superintending Engineer, North Campus of IIT Mandi Kamand Distt. Mandi HP-175075
Strengthening of the existing GI pipeline crossing the Kataula (Dhulchi) River by raising its elevation to safeguard it against flood damage during the monsoon season at the South Campus of IIT Mandi-2nd Call
2026_IITMD_918995_2
IIT Mandi (CW)/SE-2000/2026 -27/1285-87 dated 23-07-2026
Open Tender
Civil Works
Item Rate
30 days
South Campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹13,633
24 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
7 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead and lift as directed by Engineer-in-charge.
a)All kinds of soil per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 36 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2 | Cum | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 43 | Sqm | - | - |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources , Portland Pozzolana /Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
a)All works upto all level
i)Concrete of M25 grade with minimum cement content of 330 kg /cum as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 20 | Cum | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level. Thermo-Mechanically Treated bars of grade Fe-500D or more as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 500 | Kg | - | - |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per entire satisfaction and direction of Engineer-in-charge including carriage of material within all lead and lift. | 1,688 | kg | - | - |
| 7 | Supplying, hoisting and stretching to specified profile wire rope and fixing in position steel accessories like clamps ,suspenders, rope grips, U-Bolts ancherage bolts with pulleys etc. all complete as per the entire satisfaction and direction of Engineer-in-charge upto all lead and lifts. | 0.57 | MT | - | - |
| 8 | Shifting, re-alignment and fixing of GI pipeline-150mm dia as per the required position with all necessary material & arrangements all complete as per the entire satisfaction and direction of Engineer-in-charge upto all lead and lifts. | 2.12 | MT | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_968069.xls
BOQ • 0.41 MB
NITSE20002ndCall.pdf
Tender Documents • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .