Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
23 Jun 2026, 6:00 pm
Executive Engineer
Tender of Labour Work for Erection and Maintenance of HT,LT & TC Work Under ND and other Scheme under Botad Rural Sub Division
312368
BTCO/Tech-2/847/1170-5/20.05.2026
Open
Electrical
Botad
₹1,180
PGVCL-BOTAD
₹15,000
8 Jun 2026
8 Jun 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
2 Estimated cost in Rs. 1500000 Rs/-
3 Tender Fee in Rs. ( non-refundable) 1180 Rs/- (With GST)
Payment of tender fees at _____________ Division / Circle office cash counter from Dt._______ @ 11:00
Hrs to DT.________ @ 14:00Hrs.
Earnest Money Deposit amount in Rs.
5 (Payment through
NEFT/RTGS ACCOUNT
On line ( e-tendering ) tender / offer submission last Date _23.06.2026 up to 18:00 hours only IFSC CODE:SBIN0060011)
(This is mandatory )
AS PER GUVNL CIRCULAR NO.GUVNL/TECH-3/D.E.1/1586, DATE 04.10.2023
Regarding Payment of Tender Fees:-
AII the Bidders will be required to pay Tender Fees plus applicable GST as mentioned in the Tender document either in Cash (up to Rs. 10,000/-
only) at the office address specified in the tender document or by RTGS/ NEFT/online.
Regarding Payment of EMD:-
lf the EMO amount is more than Rs.3 Lakhs, it should be paid either by RTGS/NEFT /Online or Demand Draft or Banker's Cheque or Pay Order
or Bank Guarantee. Otherwise it should be paid either in Cash (up to Rs. 10,000/- only) at the office address specified in the tender document or by
RTGS/ NEFT /on line and as per the modified clause, for Tender fees & EMO (upto Rs.3 Lakhs), no any physical documents with bids will be
required from bidders and on completion bid submission period, bids can be opened immediately.
FOR RTGS PAYMENT BANK ACCOUNT DETAILS
NAME OF COMPANY PGVCL
BRANCH SBI-COURT COMPOUND ,BOTAD
IFSC CODE SBIN0060011
7 Date of opening of Tender fee , EMD of bid at Date_24.06.2026_@_11;00___ hours (if possible) 24.06.2026
8 Date of opening of Technical Bid at Date 24.06.2026_@_11;00___ hours (if possible) 24.06.2026
9 Date of on line opening of Price bid, Date 24.06.2026_@_17;00___ hours (if possible) 24.06.2026
10 Validity of Bid 120 DAYS
Executive Engineer
PGVCL, Division office, Botad
Sr. No. Prticulars
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
4 SECTION III: General Instructions to the successful bidder
SECTION IV : TERMS & CONDITIONS REGARDING INDUSTRIAL
LAWS AND OTHER RELATED MATTERS
6 SECTION V : TAXES
7 SECTION VI : General Terms & Conditions
SECTION VII : Annexures I to XI, BG Formats for EMD and, SD,
Agreement and Indemnity Bond Formats
9 SECTION VIII Schedule B
10 SECTION IX Technical Specifications
11 SECTION X Drawings
GENERAL INFORMATIOS FOR BIDDERS
The "PGVCL" shall mean the Executive Engineer Botad Division, PASCHIM GUJARAT VIJ
COMPANY LTD., having its corporate office at Nanamava Main Road, Laxminagar, Rajkot.
With expression shall unless repugnant to the context include its permitted assigns or
successor / authorized representatives.
The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been
1.2 accepted by the PGVCL for award of the contract and shall include his authorized
representatives.
The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as
Engineer-in-Charge to supervise the work – for the purpose of the contract.
The "Specification" shall mean the tender forming a part of the contract along with
Performa, schedules and drawings.
The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that
his tender has been accepted.
The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions, schedules,
drawings and any other conditions specifically agreed between the parties forming a part
of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
The "Contract Value" shall mean the total amount indicated in the contract agreement as
The "Contract Value" shall mean the total amount indicated in the contract agreement as
per order placed by the PGVCL and calculated from the quantities indicated in the tender.
The "Completion Period" shall mean the period starting from the date of issue of "Order"
and required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
“Inspector” shall mean the any person nominated by PGVCL from time to time to inspect
the works under the contract and/or duly authorized representative of the PGVCL “Letter
of Award” shall mean the official notice issued by the PGVCL notifying the contractor that
his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been issued.
“Month” shall mean the calendar month day or days unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
Sign Stamp of the Bidder Page 4|97
1.16 LT means Low Tension,
1.17 U/G means Under Ground
1.18 Electricity Rules: - All the works shall be carried out in accordance with latest
rules under Electricity Act-
1.19 Testing: - After completion of work execution required Tests are to be taken
in presence of Engineer in Charge whenever required.
1.20 Definition of “Similar work” for overhead network: Erection of overhead
electric Network up to voltage level 22 KV
1.21 Definition of “Similar work” for underground network: Laying of HT / LT
Underground Power cable network for Distribution system.
2 PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.11 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and
having experience of erection & maintenance of overhead HT/LT lines,
Transformers, underground cable work, along with satisfactory work
completion certificate regarding execution of work , including work order
outward number along with its value, from order issuing authority, for last
(three Years) _ ending last day of month previous to the one in which tenders
are invited., of any DISCOM of GUVNL or any Govt. / Private DISCOM of any
state of India. The work executed through open / advertised tender shall only
be considered for experience of work. The work done through limited tender
shall not be considered for experience.
These bidders will be considered as an experience bidder.
2.12 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and
not possessing any experience of erection & maintenance of overhead HT/LT
lines, Transformers, underground cable work can also participate in tender for
erection & maintenance of overhead HT/LT lines, Transformers, underground
These bidders will be considered as an NEW bidder.
2.2 Following documents are mandatory for the Bidders.
Work Completion certificate (by Order Issuing Authority only) with copies of
Work Orders for the similar works executed.
Memorandum of Association or partnership deed.
Document showing P.F. Number obtained by the bidder.
Power of attorney if any for signing the bid documents.
Latest solvency certificate issued by Nationalized or scheduled bank for a sum
of Minimum 20% of Tender cost
Registration Number under Shop and Estt. Act (If as case may be applicable)
PF Code Number allotted by concerned PF Authority
Sign Stamp of the Bidder Page 5|97
Labour License (If as case may be applicable)
Registration under ESIC (If as case may be applicable)
Type test certificates for Cable Box, Straight through Joints (In Case of UG Work Involved).
E. P. F. Registration in the name of bidder.
GST Registration Certificate in the name of bidder
PAN card in the name of bidder
Valid Labour Insurance Policy in the name of bidder
Latest bank solvency certificate from any Nationalized/Scheduled bank
Adhar Card (Optional) (In case of Bidding is done on Individual name)
Scanned copy of DD cheque.
3 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS.
3.1 Bidders willing to participate in tender will have to get themselves registered on website
www.nprocure.com
Bidders willing to participate in tender should have valid digital certificate / Digital
3.2 Signature as per Information technology Act 2000 using which they can sign their electronic
bids. Bidders can also procure the same from (n) code solutions, a division of GNFC Ltd.,
who are licensed certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in
the tender document.
For details regarding digital certificate and related training the below mentioned address
may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev, Ahmedabad
Toll Free No:1-800-233-1010 Mob.: 9327084190; 9898589652, E-mail: [email protected]
3.4 Bidders who already possess valid Digital certificate need not procure a new digital
Bidders can prepare and edit their offers number of times before tender submission
date and time as mentioned in this tender details table no1. After tender submission
date and time, bidder cannot edit their offer submitted in any case. No written or
online request in this regard shall be granted.
Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic format on
3.6 website www.nprocure.com before the validity period mentioned in tender details Table
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers in physical form will not be accepted in any case
Sign Stamp of the Bidder Page 6|97
4. UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND
SPECIFICATIONS.
4.1 All interested parties are requested to understand this Tender
Document in detail in order to comply with PGVCL’s requirements including
but not limited to the Tender fees, EMD and deadlines, selection criteria,
selection methodology, scope of work, and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and
documents and fully inform himself as to all the conditions and matters
which may in any way affect the Work or the cost thereof. If any Bidder
finds discrepancies or omissions in the specifications and documents or is
in doubt as to the true meaning of any part, he shall at once request in
writing in advance before filling in the tender , within the time limit as per
Table no 1, for an interpretation / clarification by the PGVCL Botad Division
office. Then The PGVCL Botad Division office will issue interpretation
and clarifications as he may think fit of such interpretations and
clarifications, the Bidder may submit his bid but within the time and date
as specified in the Table no1. All such interpretations and clarifications
shall form a part of the specifications and documents, and accompany the
bidder's proposal. In case of difference of opinion about interpretation
of specification etc. the decision of Executive Engineer Botad Division
will be final and shall be binding to the contractor.
4.3 Verbal clarifications and information given by the PGVCL or his employee(s)
or his representative(s) shall not in any way be binding on the PGVCL.
17. All interested parties requested to strictly abide by all terms prescribed
in this RFP Document and provide accurate information to the best of their
knowledge without misleading PGVCL to be considered for participation in
18. Bidders should be in touch with websites
https://pgvcl.nprocure.com &www.pgvcl.com for information
regarding revision / corrigendum / Amendment in the Tender
Document till due date of online / off line submission and thereafter.
No separate information shall be sent in this regards and also not
publish (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST
Rules in force during this Tender Period.
5.1 The Tender fees is payable, as per following Table, between the dates
mentioned in Table no 1 ,In case of cash payment (upto 10000 including
GST),the scanned copy of Cash receipt shall have to be uploaded with
BID.In case of DD/Cheque the scanned copy of original document in favour
of the Paschim Gujarat Vij Company Limited payable at Botad on any
Nationalized /Scheduled banks shall have to be uploaded with bid and
original copy of the same wiil be submitted at the office address specified
within 5 days of bid opening or by NEFT/RTGS
Sign Stamp of the Bidder Page 7|97
Tender Fees Present rate
Sr.No Tender Amount
Above Rs 5,00,000/- up to
Above Rs 10,00,000/- up to
Above Rs 25,00,000/- up to
The tender fees once paid for tender document will not be refunded under any
circumstances or not transferred to other bidder.
6. EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates mentioned in Table no 1 In case of cash
payment (upto 10000 including GST),the scanned copy of Cash receipt shall have to
be uploaded with BID.In case of DD/Cheque the scanned copy of original document
in favour of the Paschim Gujarat Vij Company Limited payable at Botad on any
Nationalized /Scheduled banks shall have to be uploaded with bid and original copy
of the same wiil be submitted at the office address specified within 5 days of bid
opening or by NEFT/RTGS by Bank guarantee from any Nationalized/Scheduled
6.2 The bank decided
money receipts by Government
of payment of Gujarat
of Tender fees time or
% ofsubmitted in PHYSICAL
the Tender Estimatedmode
. and in case of any clarification
the physical document may be asked from bidder in stipulated time.In case of DD
,on the backside of DD it is mandatory to mention TENDER NAME and Name of the
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will be
returned after the award of the contract.
6.4 EMD of the successful bidder to whom a contract is awarded will be returned after
the said bidder pays the security deposit and signs the contract agreement.
6.5 If the successful bidder fails to submit a Security Deposit within 15 days from the
date of LOA of the contract or fails to sign the contract agreement then the EMD
amount will be forfeited in favour of PGVCL without any notice or and action for
“Stop deal” will be initiated as decided by tender inviting authority.
6.6 No interest will be payable by the PGVCL on the above Deposit
DETAILS OF THE BANK ACCOUNT FOR PAYMENT OF TENDER FEE /EMS
THROUGH RTGS /NEFT ACCOUNT NO.:56011001406 IFSC
CODE:SBIN0060011 AND RECEIPT OF ONLINE PAYMENT TRASACTION MUST
BE SUBMITTED PHYSICALLY WITHIN STIPULATED TIME LIMIT.WITHOUT
SUBMISSION OF RECEIPT TENDER WILL BE REJECTED WITHOUT NOTICE.
BANK DETAILS OF PGVCL
ACCOUNT NUMBER:56011001406
IFSC CODE:SBIN0060011
BRANCH: COURT COMPOUND ,BOTAD
NAME:PASCHIM GUJARAT VIJ COMPANY LIMITED
Sign Stamp of the Bidder Page 8|97
6.10 Tenders submitted without Earnest Money Deposit by the firms, who are not eligible for any
exemption, will be rejected without entering in to further correspondence in this regard and
no reference will also be made.
7. In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.11 Following documents are mandatory and to be in submitted through online mode (scanned
copy of original document or notarised or self attached copy) only on nprocure(See page
No.2)” along with the name and stamp of bidder on documents.
1 Attested Copy of successful work Completion certificate, as mentioned on page no
point no 2.11 of this document.
2 Attested copy of Memorandum of Association or partnership deed.
3 Attested copy of document showing P.F. Number obtained by the bidder
4 Attested copy of power of attorney if any for signing the bid documents.
5 Attested copy of latest solvency certificate issued by Nationalized or scheduled bank
6 Attested Copy of registration Number under Shop and Estt. Act (If as case may be applicable)
7 Copy of PF Code Number allotted by concerned PF Authority
8 Copy of Labour License (If as case may be applicable)
9 Copy of Registration under ESIC (If as case may be applicable)
10 All Annexures of this tender documents , duly signed bythe bidder,in chronological order only
11 Certificate – A
12 Copy of Tender Document duly signed and stamped on each page.
13 Type test certificates for Cable Box, Straight through Joints (In Case of UG Work Involved).
The contractor shall have a separate provident fund code of RPFC and the Contractor who
do not possess separate P.F. Code shall not be considered for acceptance of tender.
15 Original Copy of DD cheque/Money receipt/Bank guarantee for EMD and Tender fee.
Sign Stamp of the Bidder Page 9|97
16 Contractor has to submit such certificate showing separate P.F. Code along with tender.
17 List of available safety gadgets, as per annexure XI, with the bidder.
18 Copy of documents mentioned in sr. no 2.2 of this tender.
7.2 Commercial / Price Bid:
7.2 The bidder must clearly quote their rates in Schedule – B of this tender, in percentage above
than, below than or equal to, the tender rate in figure as well as in words. The bidder should
specify whether the quoted rates are with or without prevailing taxes, if applicable, in force
at that time, The bidder must work out the total price of their tender offered accordingly and
the total amount should be clearly written in words & figure, in case of any discrepancy
the total amount should be clearly written in words & figure, in case of any discrepancy
whatever written in words shall prevail. Company shall at liberty to decide the matter as it
In casefit.of non SOR rate, Item wise rate should be mentioned and item wise rate will be
consider for the lowest party.
7.2 Further bidders, for “On line tenders”, are requested to submit price – bid on-line only
and not to submit the price bid in physical form. This is mandatory. If price bid is
submitted in physical form, same will not be opened and only on-line submitted price bid
will be considered for evaluation. In On Line price Bid, GST is to be mentioned in separate
PGVCL reserves the right to reject any OR all tenders without assigning any reasons
8. In case of on line Tenders
8.1 Technical Bid cover
8.11 All the documents as specified in Section I sr no. 7.1 are mandatory and to be submitted in
online mode only along with the name and stamp of bidder on documents.
8.2 Commercial / Price Bid cover:
8.2 All the documents as per Section 1 sr no 8.22 & 8.23 are mandatory and should be submitted
8.2 The bidder must clearly quote their rates in Schedule – B, attached with this tender, in
percentage above than, below than or equal to, the tender rate in figure as well as in words.
The bidder should specify whether the quoted rates are with or without prevailing taxes, if
applicable, in force at that time, The bidder must work out the total price of their tender
offered accordingly and the total amount should be clearly written in words & figure, in case
offered accordingly and the total amount should be clearly written in words & figure, in case
of any discrepancy whatever written in words shall prevail. Company shall at liberty to
decide the matter as it deem fit.
8.2 In case of non SOR rate, Item wise rate should be mentioned and item wise rate will be
consider for the lowest party.
Sign Stamp of the Bidder Page 10|97
8.24 No deviation in terms & condition in Schedule-B and Technical Specification will be
entertained. All the documents related to this Tender shall be final and binding to all the
bidders. Any ignorance for this shall not relieve the contractor from their contractual liability
arising as per Tender documents.
9 The works referred herein shall cover the entire scope of the Tender.
10 The issuance of bid document would not mean that the bidder has qualified for the bidding.
Hence bidders should ensure themselves of their credentials before submitting their offer.
11 Executive Engineer, PGVCL, Botad Division reserves the right to spread the order if required.
12 Does not anticipate change in the PGVCL ownership during the proposed period of
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in Table1,PGVCL
may, for any reason, whether at its own initiative or in response to a clarification requested
by a respective bidder, modify the bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & nprocure website in case of on
line tender, PGVCL will bear no responsibility or liability arising out of noncompliance of the
same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and will be given due
consideration by the bidders while they submit their bids and invariably enclose such
documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for submission and no any further
communication in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their tenders
and the information called for is given in totality. A set of complete tender documents is
required to be ONLINE submitted duly signed and stamped by authority competent to sign on
behalf of bidder on each page as a token of unconditional acceptance to the conditions of
various clauses of tender documents. The bidder's bid and the documents attached there to
shall be considered for forming part of the contract documents.
14.2 For “On Line Tenders”
14.2 Tender Papers & Specifications may be down-loaded from Web site
https://www.nprocure.com (For view, download and on line submission) and PGVCL web
site www.pgvcl.com (For view & down load only).
14.2 The bidder has to follow instruction given in this section point no 4 to 7. All of the document
should be submitted online unless asked from bidder.in case of online submitted document
,if any query arises then physical document may be called from bidder.
14.3 ALL THE RELEVANT DOCUMENTS MUST BE SUBMITTED ONLINE ONLY. PHYSICALLY
SUBMITTED DOCUMENTS WILL BE NOT CONSIDERED FOR EVALUATION AND PHYSICALLY
SUBMITTED DOCUMENTS WONT BE OPENED AND SAME HAS BEEN DISCARDED
WITHOUT ANY NOTICE TO BIDDER .
Sign Stamp of the Bidder Page 11|97
•Technical bid should be submitted ONLINE only before time limit specified in "tender
Details".Bidder has to make sure that all of the document are notarised/self attched
and if any misinformation occurs in documets then PGVCL has right to disqualify the
bidder without giving any reason. In case of any clarification PGVCL may ask for
physical documents from bidder and those documents should be submitted in
prescribed time limit.
• Price bids to be submitted ON LINE only before time limit specified in “Tender Details”
Table no1 of this document.
15. REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions, schedules and other
details called for in this specification and keep himself fully informed about all which may,
in any way, affect the work, or cost thereof. The bidder should sign on each page of tender
documents , as mentioned in Section 1 point no. 2.15, filure to furnish the required
information or submission of tender not as per the specification will be at the Bidders risk
may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this tender.
Sign Stamp of the Bidder Page 12|97
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL,
UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal investigation for
any kind of fraud for public and theft of material or/and with handlings the material and any
civil and/or criminal case pending at any stage than offer of such bidder /firm will be out
rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set out in the Table
no1, shall be rejected.
15.5 Any deviation found in Data/Details/Documents in online offer (e-tendering) , offer of the
same shall be liable for rejection at the discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or manuscript in the
bid shall be ignored and will not be considered authentic unless same are signed with
Bidder's Stamp/Seal as mentioned in Section 1 point no.
15.7 Conditional bids shall not be accepted.
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no 1, in any case which
are received after due date and time of the receipt of tender irrespective of delay due
to internet services or any other reasons and company shall not assume any
responsibility for late receipt of tender. Any correspondence in the matter will not be
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a bid. In
the event of any discrepancy in meaning, the English language copy of all documents shall
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business of the person or
persons making the bid .
17.2 Bids by corporation/ company must be signed with the legal name of the corporation/
company by the President, Managing Director or by the Secretary or other person or persons
authorized to bid on behalf of such corporation/ company in the matter.
17.3 A bid by a person who affixes to his signature the word 'President', 'Managing Director'
'Secretary', 'or other designation without disclosing his principal will be rejected.
17.4 Satisfactory evidence of authority of the person signing on behalf of the Bidder shall be
furnished with the bid.
17.5 The Bidder's name stated on the tender shall be exact legal name of the firm.
17.6 Erasures or other changes in the bid documents shall be over the initials of the person
signing the bid.
17.7 The bidder should sign on each tender documents & then they have to submit this tender
documents online.
Sign Stamp of the Bidder Page 13|97
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening of the
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each bidder
in his bid for the complete scope of works including all duties and Taxes ,.will be evaluated
by the PGVCL to ascertain the best and lowest evaluated bid in the interest of the PGVCL, for
the complete works covered under these specifications and documents
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail. If
there is discrepancy between the unit price and the total price which is obtained by
multiplying the unit price and quantity, or between sub-total and the total price, the unit or
sub-total price shall prevail, and the total price shall be corrected. In case of discrepancy
between sub-total price obtained by adding various prices in the schedule and the sub-total
price indicated for that particular schedule, the sub-total obtained by addition of various
arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices
arrived at from various schedules, identified for that purposes, in the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will be rejected.
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful bidder by the
22.2 The contract will be awarded to the best qualified and responsive bidder offering the lowest
evaluated bid in conformity with requirements of these specifications and documents and
PGVCL shall be the sole judge in this regard and subject to the provisions of these
instructions to bidders and other terms and conditions detailed out in these documents and
specifications. A responsive bid is one which accepts all terms and conditions of these
specifications and documents without any modifications.
22.3 PGVCL Reserves the right to award separate contract to two or more parties in line with the
terms and conditions specified in the specification.
23.The Warrantee Period
In case of erection and maintenance HT/LT and transformer ,If during one year
following the work completion any maintenace is felt neccesary,for example
straightnening of pole,cross arms,conductor stringing,tightning of guy etc. then such
work will have to done by the bidder free of cost. If there is any new material required
for maintenace during this warrantee period i.e.one time period,such requirement will
have to be approved by The Executive Engineer of concerned division.Quarterly report
of such material issued (vendor wise) will have to be shared with circle office by
24. ADDITIONAL DOCUMENTS
division office.
At the time of evaluation of tender PGVCL Botad Division office may ask bidder to submit
required documents other than mentioned in section I Point no 2.2, if required.
25 IF THERE WERE MORE THAN ONE PARTY IS L1 UNDER PRICE BID EVALUATION THEN
EXECUTIVE ENGINEER CAN SELECT L1 PARTY BY DRAW SYSTEM USING CHEATS AND SAME
HAS TO BE BINDING TO ALL BIDDERS ALSO EXECUTIVE ENGINEER CAN ALSO SELECT
DRAW WILL BE DONE
MULTIPLE IN PRESENCE
L1 PARTY OF ALLSYSTEM
USING DRAW ELIGIBLEIFBIDDERS
THERE ARE MORE L1 PARTIES
Sign Stamp of the Bidder Page 14|97
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender consist
365 Days. The commencement date of Order shall be Date of issue of the Order.
Sign Stamp of the Bidder Page 15|97
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
Type of Company
Attach Proof of Company
Registration along with a copy
5 of the Partnership Deed/ Proprietorship/ Partnership/ Private Limited/ Public Limited
Article of Association and
Name and designation of the
representative of the Bidder
made to expedite technical co-
Stores Address where
Store Documents to be
submitted (Rental/PGVCL)
Permanent Account
16 nos of labours in the name of Nos of Labours Insured in this policy :-
18 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and belief. If any
information found to be concealed, suppressed or incorrect at later date, our tender shall be liable to
rejected and our company debarred from executing any business with PGVCL.
Sign Stamp of the Bidder Page 16|97
SECTION II Schedule A:
1.0 For Underground Cable
1 Bidder has to maintain the records of allotted Cable Drum with actual
Cable/Conductor length. Cable length must be measured before laying. Cable joints
are to be done as per requirement only and length of cable must be utilized
2 Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3 The trench excavation and filling–in shall be so executed that all walls, roads, sewers,
drains, pipes, cables, structures, places and things shall be reasonably secured against
risk of injury and shall be carried out to the satisfaction of the authorities concerned.
However, if any, damages to existing services made, Contractor shall arrange and pay
for any necessary repair, to make good the damages.
4 When the excavation of the trenches has been accurately executed, the contractor
shall inform engineer in-charge for approval. Lying of cables shall not be started until
engineer in-charge approves the trench.
5 All the related material for laying the cable in trench i.e. Half round RCC Pipes having
both sides smooth surfaces, 25.4 mm thick , 152.4 mm inner diameter, 1000 mm
long and well cured and good quality; Sand from river bed, HDPE Pipes, GI Pipes and
sundries material if any (As per Schedule B) are to be supplied by Bidder at his own
Cost. All such material must be approved from concerned Engineer-in-charge before
utilization and it must be ISI marked where ever applicable
6 Cable laying work must be executed as per prescribed in Schedule B. sand filling in
Trench must be done as mentioned in Schedule B. Megger test of Cable must be taken
in presence of Engineer-in-charge before laying and Bidder has to maintain separate
Records duly signed by Engineer-in-Charge for each results. After laying the Cable in
trench it is to be covered with half round pipe of RCC as prescribed in Schedule B and
approved sample. Each Half round Pipe must be marked with “PGVCL” with solid Red
7 Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay Cable
in the stretch on small pulleys kept in the Trench so that it can be prevented from any
scratches on Cable. Drum must be fixed on Drum Machine while stretching and to be
kept on one end of Trench for smooth laying
8 After completion of laying as above, remaining trench must be filled with sand.
Leveling with Road is to be done after complete sand filling. No any stones or any
other debris are to be utilized in filling of Trench. The contractor shall dispose of
surplus material at his own cost.
9 A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also be
laid. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS
GUJARATI) as “CAUTION: 11000 VOLTS PGVCL CABLE” and to be placed at about
mm To 450 mm depth from ground level along the route of cable.
Sign Stamp of the Bidder Page 17|97
10 Trench route is to be made as per instructions of concerned Engineer-in-Charge and
then laying of cable in this trench accordingly.
11 Cable Laying with Mechanical Boring across the Road without disturbing the asphalt is
to be done instructions of concerned Engineer-in-Charge with prior approval and work
is to be executed as per Specifications in Schedule B only.
12 For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type test
certificate not older than Seven years and as per relevant IS 13573:2011 with latest
amendment if any along with sample before installation of cable kit at concern
Division office. GTP is to be submitted with Technical Bid.
13 If any Hard Rock area is encountered during the digging of Trench, Bidder must have
all the modernized equipment i.e. Erath Cracker JCB etc. to execute the required
Trench. Such area must be certified by a formation of Committee at Division Level
headed by Executive Engineer and to be executed in presence of Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14 Route Markers are to be installed at every 100 Meters length as per specifications in
Schedule B The marker should incorporate the following relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road
crossing, Cable Joints etc. of cable route as per requirement over and above specified
15 Empty Drums are to be credited at PGVCL respective stores at Bidders cost and Risk
after successful completion and Execution of work. Otherwise Recovery will be
proposed as per Section V Clause No.
16 After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing must
be carried out with help of Voltage Surge Testing Kit as per IE Act by applying 22 KV
for continuous Five Minutes and Cable must hold the satisfactory Results. Bidder
must have such testing facility. Following Pre commissioned Tests are also to be
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of 10 KV DC for
one minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the screen.
e) Continuity & Phase confirmation
Sign Stamp of the Bidder Page 18|97
2.28 Security deposit will be returned on after completion of awarded work
2.29 If the successful Bidders fails to pay security deposit within given time limit then the
letter of intent will stand cancelled. EMD amount will be forfeited in favour of PGVCL
without any notice or and action for “Stop deal” will be initiated as decided by tender
inviting authority.
3.0 SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt
of LOI/LOA, on Stamp Paper of Rs 300/-as per Company’s rules in the prescribed form
of the P.G.V.C.L. attached with this Tender. The cost Rs.300.00 of the Stamp Paper will
have to be borne by the successful Bidders.
4 For the Tendered work, other than turnkey work, entire material will be issued by
PGVCL. Any other related material required to carry out work mentioned in Schedule
A is to be brought by Bidder. No any extra cost will be paid towards such material.
5 Successful Bidder has to follow all the rules and Regulations of Work Safety. Required
tools and Tackles for Safety are to be arranged by Bidder only.
Bidder is responsible to any type theft/damages of Company’s material and also
responsible to any type damages to any property and any kind fatal/non-fatal
accidents to anybody during the execution of work. Insurance of all workers is
compulsory, who are involved in Execution of Tendered work. There will be no any
financial liabilities of PGVCL for damage charges paid such way. Copy of valid Labour
Insurance Policy in the name of bidder is to be submitted with Tender Documents
7 Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8 Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be
granted and Penalty with applicable GST and other taxes in force at that time will be
levied on delayed portion of work.
9 Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA.
Security Deposit (In form of DD/BG) and Insurance Policy is also to be submitted with
Agreement within this time limit i.e. 15 (Fifteen) Days.
10 Remaining material is to be credited at Respective Stores of PGVCL within a month
after completion of work.
11 Agreement and Indemnity Bond is to be executed on Rs. 300/- Stamp Paper and cost
of stamp paper is to be borne by Bidder. Solvency Certificate is to be submitted as per
PGVCL rules and Tender Condition.
12 Bidder is solely responsible for the material supplied by PGVCL.
13 Coal and Salt are to be brought by Bidder at his own expenses, for earthig work, and
work to be done as per PGVCL rules and RE specification for this work.
Sign Stamp of the Bidder Page 22|97
17 During the Execution if any deficit found in allotted material OR in case of any theft of
PGVCL allotted material, then PGVCL will recover the cost of such material from
Bidder as per the prevailing Market Rates
18 No any Advance Payment will be made after issuing of Order.
19 PGVCL will be not responsible and liable for the material supplied by the Bidder.
20 During Execution of work for Trench and Cable Laying authorized representative of
Bidder who is in knowledge of Engineer-in-Charge must remain present.
21 Bidder must have to submit the List of all related Equipment and Testing facility
necessary for the Tendered work while quoting the Bid.
22 PGVCL reserves the right to change/modify/alter/addition in condition in case of any
dispute and holds the power to decide the final verdict.
23 GST as per prevailing rates are applicable to Bidder for this work.
24 In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
25 Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26 Necessary shutdown for connection/jumper of UG cable with existing network will be
provided as per availability or convenience of the PGVCL which shall be acceptable to
the contractor & contractor shall try to complete the work in minimum time.
27 All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at Contractor’s
28 Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and
PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
2.0 For Overhead Line
1 Bidder has to maintain the records of allotted Conductor Drum with actual Conductor
length. Conductor length must be measured before Stringing.
2 E/o Poles must be according to RE Standards. Pole Pit, stringing installation of
Fabrication must be done as per standards and esthetically.
3 Earthing of Poles and Transformers must be as per Drawings and RE Standards. The
Coal and Salt composition must be followed as per rules. The Earth Pit must be kept
at a distance mentioned in Standard form the Pole. Earth Pit must be as per Drawing.
4 Concreting of Poles/Guys are to be carried out as per site situation and as per
instructions of Engineer –In-Charge.
5 Construction of Transformer Structure must be as per standard with all required
accessories like LA, Box and Fuse etc.
6 Delta Type Three Earthing are compulsory for each Transformer Centre.
Sign Stamp of the Bidder Page 19|97
7 All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
8 Wherever required, Guarding as per standard must be done.
Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision officers
has to submit the proposal to the division office with all justification before
commencement of work. Committee of Executive Engineer, DE Tech of Division office
has to verify the submitted proposal and decide whether concreting is required or
not. After the approval of committee work of concreting should be process as per
specification attached herewith.
10 Bidder must have records of each work carried out with every material inventory and
account thereof issued to him.
11 Bidder must have the well-drawn sketch of each work and to be submitted with
Inventory sheet within 15 Days of work completion.
12 All the fabricated material and Girder Poles must be painted with Coats of Silver Oxide
and without this work, work completion will not be accepted.
13 Pole Numbering must be completed within week time as per Engineer-in-Charge
14 Bidder must have proper pole accounting for the work carried out by him. He must
have the location details from where the poles are lifted and where these poles are
utilized for each work. A separate Register is to be maintained by him and details are
required to be submitted with Inventory and Sketch submission.
15 Necessary shutdown for connection/jumper of newly erected line with existing
network will be provided as per availability or convenience of the PGVCL which shall
be acceptable to the contractor & contractor shall try to complete the work in
16 Successful Bidder must have ensured for that the safety Gadgets are issued to his
Labour , by him, and required regulations of Safety will be followed while carrying out
the line erection work.
17 The Work for the erection of of Poles, Guys, Earthing, Transformer and Concreting,
Stringing and Guarding must be done as per attached Specifications and Drawings.
18 The material which is dismantled from site during the execution of work must be
credited to respective Divisional stores immediately after completion of work with
complete inventory and measurement details and length to weigh conversion
19 Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be
initiated against the Contractor
20 In case of any Disputes, Superintending Engineer of Concerned area is the final
Authority to take any Decision.
Sign Stamp of the Bidder Page 20|97
General Instructions to the successful bidders
1 1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful
Bidders indicating the quantity allocated to them and the security deposit amount to
be deposited by them with PGVCL. Short listed Bidders will be required to deposit the
requisite security deposit within 15 days from issuance of LOI / LOA.
2 2. Security Deposit:
2.21 Security deposit will be accepted in Cash if the amount is less than Rs. 10000.00 and,
if the amount is more than Rs. 10000.00 then will be payable by Demand Draft (DD) or
Bank Guarantee (BG) from Nationalized / Scheduled Banks as per Govt. GR No. EMD /
10 / 2014 / 570 / DMO dated 01.04.15 will be acceptable. DD should be drawn on any
Nationalized /Scheduled banks in favour of Paschim Gujarat Vij Company Ltd. payable
at Botad or by Bank guarantee from any Nationalized/Scheduled nationalized bank
decided by Government of Gujarat time to time only. Cheque will not be acceptable.
2.22 The successful Bidders will be required to deposit the requisite security deposit within
15 days from the date of issuance of LOI / LOA of an amount equivalent to 5 % of the
value of the work to be allotted to him and as mentioned in LOI / LOA.
2.23 In case, if the Bank Guarantee is furnished / submitted, it should have a Clear one
time validity till the completion of awarded work of this work order.Bank Guarantee
for interim period will not be allowed. Security Deposit shall be suitably extended time
to time as per requirement.
2.24 If by any reasons the completion period of this work order is extended, then supplier
should undertake to renew the Bank Guarantee at least one month before the expiry
of the validity failing which PGVCL will be at liberty to encase the same. CORPORATE
GUARANTEES NOT ALLOWED.
2.25 No interest will be paid on the Security Deposit.
2.26 In the event of awarding the order of additional quantity, the successful Bidders will
be required to deposit additional Security Deposit on prorate basis within two weeks
of the issuance of LOA /LOI for the additional order quantity.
2.27 In the event of failure to carry out work offered by successful Bidders and as accepted
by them while receiving the order within given time period, will lead to forfeiture of
the Security Deposit up to 100% and will lead to disqualification of the bidder to
transaction business with PGVCL for at least TWO years or the time duration as may
be decided by the Managing Director, PGVCL.
Sign Stamp of the Bidder Page 21|97
14 Work is to be carried out in presence of PGVCL authorized representative and to be
duly certified also.
15 No idle labour charges will be paid by the PGVCL in case such occasion of idle labour
arises, due to want of any materials or any othersituations.
16 PGVCL have full rights to accept or reject the offer received against the Tender.
17 Bidder has to submit the Performance Certificates under whom the similar kind of
Tender work has been executed. Such Certificates must not older than 3 Years from
Date of submission of the Bid. Such Certificate must be duly signed by Cadre
Executive Engineers and above only.
Sign Stamp of the Bidder Page 23|97
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in
India, including any such laws passed or made or coming into force during the period
of the Contract.
2. Wages to be paid at the time of payment etc.by the contractor
2.1 The successful bidder shall pay minimum prevailing rates per day, as may be specified
here after, or rates fixed under the Minimum Wages Act, whichever is higher. The
wages of every contract labour employed by him under this contract shall be paid by
him before the expiry of 7th day of the month irrespective of which the wages are
payable i.e. wages of a last month have to be paid by him in the first week of the next
month). The contractor shall have to make wages to his workers through bank only.
The agency shall have to submit the copy of a letter given to the Bank advising for
crediting wages in individual account of the workmen along with photocopy of the
cheque showing total payment to be made to all such workmen whose accounts are
operated in that branch. (If there is more than one Branch, the agency will have to
submit separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the company so
that in case of labour trouble etc. the contractor can be contacted. The contractor
shall arrange to have his office outside the factory premises and the contractor shall
keep himself present through the work hours.
3 Persons below the age of 18 years shall not be deployed for the said work.
4 No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5 Identity cards as prescribed under the factories Act/Shops and establishment Act (As
the case may be applicable) with Photo affixed thereto, for identification.
6 The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them.
In absence of such license, the contract shall be liable to be terminated without
assigning any reason thereof.
7 The successful bidder shall at his own expenses comply with all labour laws and keep
the PGVCL indemnified in respect thereof. Some of the major liabilities under various
labour and industrial laws which the Contractor shall comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident fund,
administrative charges etc. at the rates made applicable from time to time by the
Government of India / Government of Gujarat or other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate with the
office of the commissioner of labour as per the Contract Labour (Regulation and
abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and abolition) Act
rules framed there under depending upon the number of workmen.
Sign Stamp of the Bidder Page 24|97
7.4 Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per
industrial Dispute Act. Any payment to the Contractor's employee arising out of any
claim of disputes under the Industrial Dispute Act 1947 or any other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed
or any government Contractor under any of the provisions of the Minimum wages
act, Payments of wages Act, Employee's compensation Act, Contract Labour
regulation abolition Act, Employee provident fund or any other law due to act of
omission of the Contractor, the PGVCL may make such payment and shall recover the
same from the successful bidder 's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such amount as
may be necessary to cause of observe, or for non-observance of the provisions
stipulated in the notifications/byelaws/Acts/Rules/Regulations/ including
amendments. If any, on the part of the Contractor, the PGVCL shall have the right to
deduct any money due to the successful bidder under this contract or any other
contract with the PGVCL including his amount of security deposit for adjusting the
payment. The PGVCL shall also have right to recover from the Contractor any sum
required or estimated to be required for making good the loss or damage suffered by
8 the PGVCL. compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation
fund and under the liabilities insurance. The Contractor will arrange insurance policies
for arranging payment to his staff injured / met with accident (Fatal / nonfatal) on
duty of sufficient amount as per Labour laws. In case of any such happening
Contractor will be liable for any other payment to workers / staff engaged as per
existing rules. Contractor will not make any such payment to the Contractor's staff or
any compensation etc. during the pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments engaged.
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and conditions of service )
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
Sign Stamp of the Bidder Page 25|97
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labour laws, in force from time to time, from
statutory authorities like GOI-GOG, which the Contractor shall have to comply with.
10 It should be ensured that before commencing the said work, the successful bidder
should submit the details of their labourer such as a full name, address and age with
proof and subsequently changes of workers details are submitted accordingly.
11 The successful bidder shall employ adequate number of an experienced staff at site for
daily supervision and for maintenance of various register and records required under
the law and contract. No payment for supervision shall be admissible.
12 PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or
regulations that have to be observed by the contractor for carrying out the work.
13 The contract will be governed by the company as per works terms & conditions of the
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No female
worker shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next
14.2 Contractor shall maintain a valid labour license under the Contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence
of such a license, the contract shall be liable to be terminated without assigning any
reason thereof. Contractor should also employ qualified and experiences persons as
per requirement of Electricity Act and rules for carrying out supply and erection work
under this contract.
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any Government
agency under any of the provisions of the Minimum Wages Act, Payment of Wages
Act, Employee Compensation Act, Contract Labour Regulation Abolition Act, Employee
Provident Fund or any other law due to act of omission of the Contractor, PGVCL may
make such payment and shall recover the same from the Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect
of each concerned employee The contractor's contribution and the workers’
contribution towards Provident Fund and Family Pension Scheme shall be done at the
rate made applicable by the Government from time to time and deposited by the
contractor with Regional Provident Fund Commissioner, Rajkot.
Sign Stamp of the Bidder Page 26|97
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who
are members of the Provident Fund as the contribution to the Deposit Linked
Insurance Scheme with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by
the Contractor with Regional Provident Fund Commissioner, Rajkot at the rates
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the
Contract Labour shall be provided by the Contractor to his, workers. He shall maintain
Leave Records, Leave Cards for individual labourer which shall be duly verified,
approved and certified by the Authorized Officer of PGVCL. Remuneration for such
leave period shall be fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the
performance of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per
rates fixed under the Minimum Wages Act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the expiry of
7th day from the last day of the month in respect of which the wages are payable (i.e.
wages of a month have to be paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor shall
be punishable to the extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so
that, in case of labour trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office within working area and the contractor keep himself
present throughout the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor and
if it is not taken, offer of the firm will not be considered. The attested documentary
evidence to be submitted along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be
ensured that all the contract labourers are covered under the provident fund scheme
and employees’ pension scheme and their contributions are remitted regularly to the
concerned RPFC. The photo copies of the Chelan in this regard should be collected
from the concerned contractor and kept in the file of the concern contractor.
Sign Stamp of the Bidder Page 27|97
21. CONTRACTOR TO INDEMNIFY THE COMPANY
The successful bidder shall indemnify the Company and every member officer and
employees of the Company, also engineer in charge and his staff against all actions,
proceedings, claims of demands, coasts and expenses, which may be made against the
Company or Government for or in respective of or performance of his obligation
under the contract documents the Company shall not liable for or in respective of or
in consequence of any accident or inquiry to any workman or other person in the
employment of the contractor or his sub-contractor and the contractor shall
Indemnify and keep indemnified the Company against all such damage and
compensation and against all claims, demands, proceedings costs, charges and
expenses whatsoever in respective thereof in relation thereto.
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid
price shall include all the costs in fulfilling all the insurance liabilities under the
22.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and
interests of the PGVCL against all perils detailed herein. The form and the limit of
such insurance as defined herein together with the under-writer in each case shall be
acceptable to the PGVCL. However, irrespective of such acceptance, the responsibility
to maintain adequate insurance coverage at all time during the period of Contract
shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve
him of any of his contractual responsibilities and obligations. The insurance covers to
be taken by the Contractor shall be in the name of the Contractor. The Contractor
shall, however, be authorized to deal directly with Insurance Company or Companies
and shall be responsible in regard to maintenance of all insurance covers. Further the
insurance should be in freely convertible currency.
23 Any loss or damage to the equipment during handling, transportation, storage,
erection, putting in to satisfactory operation and all activities to be performed till the
successful completion of commissioning of the equipment shall be to the account of
the Contractor. The Contractor shall be responsible for preference of all claims and
make good the damages or loss by way of repairs and/or replacement of the
equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the PGVCL with copy of all insurance policies and documents
taken out by him in pursuance of the Contract. Such copies of documents shall be
submitted to the PGVCL immediately after such insurance coverage. The Contractor
shall also inform the PGVCL in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation,
renewal etc., as may be necessary well in time.
Sign Stamp of the Bidder Page 28|97
24 The perils required to be covered under the insurance shall include, but not be limited
to fire and allied risks, miscellaneous accidents (erection risks) workman
compensation risks, loss or damage in transit, theft, pilferage, earth quake, riot and
strikes and malicious damages, civil commotion, weather conditions, accidents of all
kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including
delivery of goods and other costs till the equipment is delivered at Site. The insurance
policies to be taken should be on replacement value basis and/or incorporating
escalation clause. Notwithstanding the extent of insurance cover and the amount of
claim available from the underwriters, the Contractor shall be liable to make good the
full replacement/rectification value of all equipment/materials and to ensure their
availability as per project requirements.
25 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL may
from time to time, during the pendency of the Contract, ask the Contractor in writing
to limit the insurance coverage, risks and in such a case, the parties to the Contract
will agree for a mutual settlement, for reduction in Contract price to the extent of
reduced premium amount. The Contractor, while arranging the insurance shall ensure
to obtain all discounts on premium which may be available for higher volume or for
reason of financing arrangement of the project.
26 The clause entitled ‘Insurance’ covers the additional insurance requirements for the
portion of the works to be performed at the Site.
27 The successful bidder will not be allowed to work after working hours except in special
28 The successful bidder has to engage required strength of skilled persons for execution
of work and proper supervisor to avoid complication and unnecessary delay to
complete work timely. The successful bidder will be solely responsible for labour
claims arising out of the labour employed for this job.
29 The successful bidder should furnish details of past experience of such job of similar
nature completed by him satisfactorily within the time limit in PGVCL will be
The successful bidder will be abide by and fulfil all the terms and provisions of the
“Tender and contract” for works as applicable and in case of any default there to the
PGVCL Company shall forfeit the S.D. or any other action as may be decided by
Superintending/Executive Engineer Botad Division.
31 The successful bidder will certify that he has complied with the provisions of Industrial
& Labour Laws including PF Act, ESI Act etc. as may be applicable. Copy of challans of
PF related to be submitted along with bill.
32 The successful bidder will governed by the PGVCL general conditions of works
contract. The Booklet will be available in the concerned office in any working days. In
the event of placing order, the successful bidder will be bound to the terms &
conditions of the booklet. All the usual terms and conditions of the Company though
the same might have not been mentioned in this specification or contractor booklet
will applicable to this contract, and the decision of the Executive Engineer, Botad
Division shall be binding on the Contractor.
Sign Stamp of the Bidder Page 29|97
SECTION V TAXES and Duties: GST
1 The prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services. The amount and % of GST and Cess as applicable
should clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under
2 GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
and CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
Contractor shall have to submit a C.A Certificate & duly authorized Signatory,
certifying that you have not claimed Refund of any applicable GST and Cess, charged
to COMPANY or shall not claim any such Refund, on a future date, from the concerned
Authorities and if, any Refund, in respect of such GST and Cess, is claimed by you, it
will be immediately passed on to the COMPANY, without COMPANY making any
specific Claim, for the same, either from the Department or from you.
4 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Composition
Scheme under GST Act, which should be clearly indicated in the price bid. COMPANY
may at its discretion consider such offer with presumption of highest applicable rate
of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
5 If the Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of
the contract, the rate mentioned in the price bid shall be final and any additional GST
will have to be borne by the tenderer. In no case additional amount towards tax or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory
Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
6 Contractor should charge GST in Invoice at the rate as agreed to/mentioned in
acceptance of tender only and any deviation in the same shall not be accepted.
Further, any additional liability of GST (later on due to wrong mentioning of GST rate,
mis-interpretation of HSN/SAC Code, etc.) over and above as charged in the invoice
shall be borne by the Supplier/Contractor. However, any refund received by the
supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along
with interest needs to be passed on suo-moto by the contractor.
Sign Stamp of the Bidder Page 30|97
7 Further, the Company has a right to recover the amount of GST along with penal
interest at the rate of 15% per annum if GST charged is not paid/short paid to the
government or fail to upload the details or uploads inaccurate particulars on GSTIN
portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to
inclusion of any other additional item of their inputs / input services under the ambit
of the Input Tax Credit provisions under the GST Act, subsequent to the date of
submission of the offer, the same should be passed on to COMPANY and you should
inform such changes to COMPANY from time to time. PGVCL’s GST Registration No.is
24AADCP1453C1ZZ
9 TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed
against the PGVCL or the Contractor in pursuance of the Contract. In addition the
Contractor shall be responsible for payment of all Indian duties, levies and taxes
lawfully assessed against the Contractor for his personal income & property only.
10 Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance
with the provision of Income-Tax Laws and to that effect a certificate will be issued to
the contractor, however added as contractor has to submit separate invoice for
supply parts item as well as works part item separately, otherwise TDS will be
deducted on entire invoice value.”
11 Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay
the same to the respective Govt. Department. Tax will be deducted as per applicable
statutory rules.
12 Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS,
welfare cess or any other taxes applicable time to time etc. All other statutory
liabilities towards this contract will be on your part.
12.1 STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within
the contract period will not be considered except GST. No statutory variation will be
given for this work except GST.
12.2 The Contractor shall be fully responsible for deducting the P.F. of the
employees/labour Working under him as per statutory regulations and depositing the
same with the concerned authorities.
13 The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person
employed of the Contractor or his subcontractors for the purposes of the Works.
Sign Stamp of the Bidder Page 31|97
SECTION VI: TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers,
drawings, etc. attached & if has any doubt as to the meaning of any portion of any
condition / specification, etc. he shall before signing the contract submit the
particulars thereof to PGVCL in order that such doubts are removed.
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer,
assign or sublet the work under this contract or any substantial part thereof to any
1.3 other party.
The execution of work should be commenced as per the instruction of the Engineer in
Charge as per actual requirement and should be completed within the time limit
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the
work altogether or reduce or cut it down. If the work is stopped altogether, the Bidder
shall only be paid for work done. If the work is cut down the Bidder shall not be paid
for the work as so cut down, but in neither case shall be paid any compensation what
so ever for the loss or profit which he might have made if he had been allowed to
complete all the work included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered
post or telegram or telex or any other way of communication to the successful bidder
at his specified address shall be deemed to have been delivered to the successful
The work shall be carried out by the successful bidder with prior approval of PGVCL.
Work carried out without PGVCL’s approval shall not be accepted and the PGVCL shall
have right to reject it and to recover the cost from the successful bidder. He will be
liable against all losses, expenses or claims arising in connection with the death of or
injury to any person employed by the successful bidder or his subcontractors for the
purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment during
transit due to improper or inadequate packing, handling, loading and unloading. The
cases containing easily damageable material shall be very carefully handled. Adequate
protection must be provided for outdoor storage at site in tropical humid climate,
wherever necessary. The successful bidder without any extra cost shall supply any
material found short inside intact store area.
1.7 If the successful bidder neglects to execute the work with due diligence and expedition
or refuses or neglect to comply with any reasonable orders within two days’ notice
given in writing to the successful bidder and if he fails to comply with the notice, then
in such a case PGVCL shall be at liberty to get the work or any part of it, executed
through any other agency/Bidder in the manner and on the terms it thinks proper. If
the cost of executing the work as aforesaid shall exceed the balance due to the Bidder,
and the Bidder fails to make good the deficiency, PGVCL may recover it from the
Bidder in any lawful manner.
Sign Stamp of the Bidder Page 32|97
1.8 PGVCL shall have at all reasonable time access to the works being carried out by the
Bidder under this contract and stores where material issued by PGVCL is stored. All
the works shall be carried out by the Bidder to the satisfaction of PGVCL.
1.9 The quantities mentioned in the accompanying schedule B are only approximate same
may decrease or increase. The PGVCL reserves the right for revising or omitting any of
the quantities. The actual work executed by the successful bidder will be calculated at
the rate given in the contract schedule of the rates binding to the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-
up/closed due to whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any account
whatsoever through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be applicable
to this work contract.
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge
and for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should contact our
Engineer In Charge as well as Division Office, Botad daily for the availability of
materials required for this work, failing to which this work order shall be terminated
without giving any notice.
1.15 The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of
Engineer In Charge.
1.16 In case of any dispute doubt, the decision of Superintending/Executive Engineer Botad
Division shall be unchallengeable and final, which will be binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of
guaranteed period if any.
1.18 All legal complication of disputes is subject to Botad jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered value will
have to be produced by the contractor and party has to submit attested copy of
solvency certificate to the company before commencing of work.
1.20 The successful bidder will be solely responsible for any accident/damage either to
equipment or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.22 The successful bidder will have to make his own arrangement for required all kinds of
tools, tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill. The
assessment of which will be done by Engineer In Charge in consultation with division
office, and his sole discretion and his decision shall be binding to the successful bidder
and shall be considered as final and unchallengeable.
Sign Stamp of the Bidder Page 33|97
1.24 The successful bidder will have to give indemnity bond to PGVCL against any possible
claim of compensation for damage to Contractor’s equipment or staff or any of third
parties during the execution of work as per attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in Schedule-B
of contract awarded to him, as per directive and instruction of Engineer In Charge. If
he fails to do so entire work will be carried out at the risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock,
exclusively for execution of work.
1.27 Specification in any items mentioned in tender are subject to change without any
prior notice and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all
relevant Govt. Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful bidder
has to deploy adequate man power, material, tools etc. well in advance and has to
complete the entire work during this specific outage period only, failing to which
Company shall be at liable to deduct the amount of revenue loss due to prolong
1.30 The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for
completion of work. The contractor will not be eligible for any extra payment in
respect of such minor accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time and it will
be his sole responsibility to execute and complete this work as per the instruction of
Engineer In Charge.
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall be
made from you, on the basis of prices of the materials (prevailing on the date of
settlement of materials account) plus 15% supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised and
latest provision under I.E. Rule Act made there under and as per instruction of
Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on same day
and to be preserved in safe custody failing to which PGVCL shall initiate Police action.
Similarly as per instruction of Engineer In Charge, you have to credit the material at
PGVCL store without any loss of time failing to which PGVCL shall initiate Police
1.35 Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by Superintending/Executive
Engineer, Botad Division shall be recovered from successful bidder’s bill as a penalty
with applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.37 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL
does not take any responsibility in case of accident or injury to the workers. The
safety, security of men, materials and equipment shall be sole responsibility of the
Sign Stamp of the Bidder Page 34|97
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and
that of local body is a must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra amount
towards any type of claim except for the description indicated in Schedule –A. The
party has to carry out all other additional required activities / work as directed by
Engineer In Charge which is not mentioned in Schedule but required to be completed
as per the site condition and for this work no extra payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification and
experience who could supervise the execution of work throughout. He should always
be present on the site.
1.41 The contractor shall be responsible for breakages, losses and a theft of material during
transit or erection after the materials issued from the stores till the completion of
work and is taken over by the PGVCL.
1.42 As regard damages to the materials, equipment, successful bidder himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN”
Compensation Act or any other statutory provisions, the same will be paid by
contractor directly. If he thinks fit, he may take necessary insurance covering at his
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement etc. as
early as possible and he shall fulfil the entire requirement which is necessary to
finalize the accounts.
1.44 The competent authority can delete any item in schedule of the tender if he feels that
the rate quoted by the contractor for the item is abnormally high when compared to
the estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time and it
will be his sole responsibility to execute and complete this work as per the instruction
of Engineer In Charge.
1.46 The erection work should be carried out according to the specification as per
instructions and programmed laid out by the Engineer in charge. Contractor has to
ensure safe shifting and erection of all accessories / equipment as per standard
1.47 The Bidder shall not display the photograph of the work and shall not take advantage
through publicity of the work without written permission of PGVCL.
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of
completing the work confirming to the requirement of this contract.
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to the line
and Electrical Equipment until the successful completion as defined elsewhere in the
1.50 All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
1.51 In the event of an emergency, the Executive Engineer reserves the right to reallocate
the work order from one subdivision to another, as deemed necessary for the timely
and effective execution of the contract.
Sign Stamp of the Bidder Page 35|97
1.52 The law applicable to the contract shall be the laws in force in India. The courts of
Rajkot shall have exclusive jurisdiction in all matters arising under the contract.
1.53 If during one year following the work completion any maintenance is felt necessary,for
example straightning of poles ,cross arms,conductor stringing,Tightning of Guy
etc.then such work will have to done by bidder free of cost.
1.54 For erecting poles the pits should be digging by using Pole Erection Devise (PED
Machine). Where ever it is not possible to use the PED machine in the area lick hard
rock, small streets etc. the permission of the engineer in charge shall be obtained
for digging of pits as per the conventional method.
1.55 The maintenance bill shall be submitted within two months after completion of the
work, along with the corresponding Geo ID.
ઓનો સંદર્ભ આપી શકો છો: (GR No: EMD/4/2022/002/DMO તારીખ: ૨૦/૦૫/૨૦૨૨)
• નિયમ: સફળ બિડરે લેટર ઓફ ઈન્ટેન્ટ (LOI) અથવા વર્ક ઓર્ડર મળ્યાના ૧૦ થી ૧૫ દિ
• સંદર્ભ: GUVNLના સ્ટાન્ડર્ડ ટેન્ડર ડોક્યુમેન્ટ મુજબ, જો આ સમયમાં FD ન ભરાય, તો
વિભાગ કોઈ પણ પત્રવ્યવહાર કર્યા વગર ઓર્ડર રદ (Outrightly Cancel) કરી શકે છે.
૨. EMD જપ્તી (Forfeiture)
• જો કોન્ટ્રાક્ટર નોટિસ પિરિયડમાં પ્રતિસાદ ન આપે અથવા FD ન ભરે, તો તેની EMD જપ્
ગ લેવા પર પ્રતિબંધ (Debarred/Banned) મૂકવામાં આવશે.
જો L1 પાર્ટી LOA/LOI મળ્યા પછી પણ ભરેલા ભાવમાં ટેન્ડર સ્વીકારતી નથી અથવા Secur
ity Deposit (SD) ભરતી નથી, તો GUVNL ના સર્ક્યુલર મુજબ LOA/LOI તરત જ રદ થાય છે, E
MD જપ્ત થાય છે, અને Tender Committee L2 ને L1 ના દરે કામ ઓફર કરી દેશે.
1.58 For every erection and maintenance work, random before and after photographs shall
be attached along with the bill. The photocopying charges of such photographs will be
borne by PGVCL, Botad Division.
2. PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm
price basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of the
PGVCL, for the complete works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they willhave to
match their end cost with end cost of L-1 technically acceptable bidder. PGVCL (tender
Inviting Authority) may go to the L-2, L-3 and so on depending upon the requirement.
If PGVCL (tender Inviting Authority) feels that there is lack of serious competition or
any other reasons, PGVCL (tender Inviting Authority) may negotiate with the L-1
party. PGVCL’s (tender Inviting Authority) decision shall be final and binding on all the
3. QUANTITY DISTRIBUTION
3.1 3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have
confirmed /fulfilled pre eligibility criteria , as mentioned in Section 1 sr No 2 , will only
be considered for price evaluation. PGVCL will not consider the, price bid of any
contractor who does not confirm / fulfil the eligibility criteria as mentioned in Section
3.11 While placing the order, the quantity distribution to each new contractors / new firms
shall be restricted up to 30 % of the tender amount/Qty. for all such new bidders
provided the price of New contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a regular contractor only
after full filing experience criteria as mentioned in Bidders qualifying criteria as per
point no. 2 in Section I.
Sign Stamp of the Bidder Page 36|97
3.12 The new contractor will be asked to match the L-1 prices of the new contractor only
and the Regular contractor has to match the L-1 price of the Regular/experienced
contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very high,
the above condition no. 2.11 shall be suitably relaxed by PGVCL. L-1 regular contractor
however will get heavy weight age in order placement.
3.2 For laying of Under Ground Cable work:
3.21 While placing the order, the quantity distribution to each new contractors / new firms
, Section 1 sr No 2, shall be restricted up to 10 % of the tender amount/Qty. for all
such new bidders provided the price of New contractor is lower than the
regular/experienced contractor. New contractor / new firm will be considered as a
regular contractor only after full filing experience criteria as mentioned in Bidders
qualifying criteria as per point no. 2 in Section I.
Sign Stamp of the Bidder Page 36|97
2. PRICE EVALUATION:
No price preference shall be given on any account.All tenders must be submitted firm price
basis(InclusiveofallTaxes)and lowest evaluated bid in the interest of the PGVCL,for the complete works covered
under these specifications and documents.If more than one party is to be considered for placement of
order,they will have to match their end cost with end cost of L-1 technically acceptable bidder.
PGVCL(tenderInvitingAuthority)may go to the L-2,L-3 and soon depending upon the requirement.If
PGVCL(tenderInvitingAuthority)feels that there is lack of serious competition or any other
reasons,PGVCL(tenderInvitingAuthority)may negotiate with the L-1 party.PGVCL’s(tender Inviting Authority)
decision shall be final and binding on all the parties.
Sign Stamp of the Bidder Page 36 (2)|97
3.22 The new contractor will be asked to match the L-1 prices of the new contractor only
and the Regular contractor has to match the L-1 price of the Regular/experienced
contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very high,
the above condition no. 2.21 shall be suitably relaxed by PGVCL. L-1 regular contractor
however will get heavy weight age in order placement. The Contractors who have
confirmed /fulfilled pre eligibility criteria will only be considered for price evaluation.
PGVCL will not consider the price bid of any contractor who does not confirm / fulfil
the eligibility criteria. L-1 regular contractor however will get heavy weight age in
order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each
concerned Divisions under above locations. The planning for each location has to be
prepared in consultation of the Deputy Engineer of the concerned Sub Division under
whose control the work is allocated. The work must be carried out under Supervision
of concerned S/dn Head or Authorized Staff appointed by SDO.
5.ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be alloted from any store Centres
of PGVCL jurisdiction and successful bidder has to take delivery from these stores at
6 Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued
Fourth Sub Work Order only after the submission of Inventory sheet with sketch and
material account statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 a. The contractor has to keep all materials in safe custody and transport to the
respective sites and will be fully responsible for any damage to or loss of all materials
at any stage during transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe
custody of all the stored materials at his own cost. Material which is to be allotted by
PGVCL is to be carted, loaded and unloaded at Bidder’s cost and risk from PGVCL’s
respective Stores. PGVCL must have access to such Store/s at any time of Day thought
the contractual period and Contractor will cooperate for verification of such store/s
and Inventory accounting. Failing to which actions may be initiated after issuance of
required Notice to the Contractor. Store address/s is to be mentioned in the “General
information about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose,
semi assembled and/or erected by him at site in his custody. The Contractor shall
make suitable security arrangements at his own cost to ensure the protection of all
materials, equipment and works from theft, fire pilferage and any other damages and
loss. It shall be the responsibility of the contractor to arrange for security till the
works are finally taken over by the PGVCL
Sign Stamp of the Bidder Page 37|97
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to
the extent of 100 % cost of materials, which are required to complete the work.
Contractor shall have to take comprehensive insurance policy equivalent to the Order
Value against any loss, damage, theft, pilferage, fire etc. for the complete period of
storage, erection and commissioning up to the time of taking over by PGVCL. The
Contractor shall deal directly and pursue the claim with the Insurance Company and
shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the successful Contractor
shall be furnished to Engineer-In-Charge. In absence of the above insurance policy, R.A.
Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be
responsible to lodge, pursue and settle all the claims with the Insurance Company for
all items, materials and the PGVCL shall be kept informed about it. Contractor shall
replace the lost / damaged materials / items promptly irrespective of the settlement
of the claims by underwriter and ensure that the work progress is as per agreed
schedule. The loss, if any, such replacement will have to be borne by the Contractor
and PGVCL will not entertain any claim / representation in this regard. However it will
be contractor's responsibility to insure the entire project is taken over by the PGVCL.
8.Account of material issued
8.1 The successful bidder shall have to maintain accurate day to day item wise account of
use of issued materials which shall be got checked from time to time by the Engineer
In Charge of the Company. The contractor will be responsible for custody and
preserving the issued materials till the work is hand over by the contractor after
8.2 The successful bidder has to maintain site register, covering all the daily details of
material receipt and utilization, progress of work etc. This register shall be checked
and signed by Engineer In Charge/Deputy /Executive Engineer,_Botad Sdn/Division
during the site visit as per requirement and exigency of work if deem fit.
8.3 After completion of the work against each Sub Work Order, all the surplus materials
issued by the PGVCL shall be returned by you to the respective divisional /Regional
stores only at contractor’s cost. Do not credit this material in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the
ordered work within 365 Days from the Date of issue of Work Order.
9.2 Time limit of Each sub work order should not be maximum up to 60 Days.
9.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to
heavy rains or other reasonable causes, such facts should be immediately brought to
notice of the Engineer In Charge. If the reasons for stopping the work are genuine the
Engineer In Charge may ask the successful bidder to start the work again as per
condition. The period of such stoppage will not be considered as a part of working
days moreover the successful bidder cannot claim compensation for such stoppage.
Sign Stamp of the Bidder Page 38|97
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer
In Charge and Executive Engineer_Botad. If found that the work is unsatisfactory or
not progressing as per schedule then any action would be taken by the PGVCL as may
deemed fit to see that work is completed at the risk and cost of contractor. The
completion time allowed for each Sub work Order shall be strictly observed.
10 Time limit extension will be given, as per Clause No. 12 of this section, if material is
not supplied in time and in any case of objection not cleared in time. But if materials
given in time and there is no any objection, then no time limit extension will be
granted and penalty with applicable GST will be imposed as per rules.
11 CHANGE OF QUANTITY
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or
decrease the quantities of items under the Contract but without any change in unit
price or other terms & conditions. Such variations unless otherwise specified in the
accompanying GCC and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the
Contract shall be limited to the extent of 30% (Thirty Percept) of the contract price by
way of suitable amendment to the contract.
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in
the Contract for the change in quantities as above. The base unit rates, as identified
in the Contract shall however remain constant during the currency of the Contract, In
case the unit rates are not available for the change in quantity, the same shall be
subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor.
Responsibility of material will be that of the contractor.
12 Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If the work is not
completed within the scheduled period as prescribed in Sub Work Order, penalty +
GST at the rate of 0.5 % per week or part thereof on delayed portion subject to
maximum up to 10 % of the sub work order Value with GST as per applicable rate.
This will be deducted from the bills payable either against this contract or any bank
guarantee or any other amount payable under any other contract with the PGVCL. For
Penalty calculations or Time limit Extension, following points are to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which
the first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store In-
charge/Store Keeper must be taken against the particular item by the contractor.
12.4 In Case of non-availability of Material, contractor must visit the respective store every
fortnight and no stock material details are to be submitted to respective Executive
Engineer and concerned SDO.
Sign Stamp of the Bidder Page 39|97
12.5 TLE of Sub work order can be granted on the basis of above such documents produced
12.6 Time limit Extension must be given as per F & A Letter No. PGVCL/F&A/5083/14-06-
12.7 At the time of submission of Bill against SWO, all such Documents are to be submitted
by contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
13 During the execution of Work, if Contractor/Labour are found violating OR Braking the
Safety rules and Regulations, then Engineer-in-Charge will serve the warning Notice on
first Instance. On second Instance the amount of Fine will be Rs. 500.00 or 0.1 % of
amount of SWO (Whichever is high). Even If after above two instances, still Contractor
found breaking of Safety Rules and Regulations then Procedures for Stop dealing must
be initiated against him as per rules and regulations.
14 Payment terms shall be as follows:
14.1 Payment will be made against Invoice value and shall be paid against actual execution.
The bills should be submitted in Duplicate to respective Superintending/Executive
Engineer, Circle/Division Office along with following documents:
Measurement Report of each site by PGVCL authorized inspection Officer (not below
the rank of Deputy Engineer)
Material Accounting for work duly certified by Engineer-in-charge
Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
Copy of Insurance Policy against the Material equivalent to the Order Value as per
Tender Condition No. No.7 under this Section.
Contractor must submit the above documents within Fifteen (15) Days from the
actual date of completion of work to respective S/dn Office.
DOP is to be followed for Payments against the Work Orders.
14.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise
only final bill shall be paid.
14.3 The time limit for the work may be reduced and contractor should make all his efforts
to complete the work within stipulated time limit as may be given by the Engineer In
Charge depending upon emergency of work.
15 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
15.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign
enemies, mobilization, requisition or embargo;
15.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
Sign Stamp of the Bidder Page 40|97
15.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any
nuclear waste from the combustion of nuclear fuel, radioactive toxic explosive, or
other hazardous properties of any explosive nuclear assembly or nuclear components
15.4 Riot, commotion or disorder, except where solely restricted to employees of the
15.5 Neither party shall be considered to be in default or in breach of his obligations under
the Contract to the extent is that performance of such obligations prevented by any
circumstances of Force Majeure that arise after the date of the Notification of Award.
15.6 If either party considers that any circumstances of Force Majeure have occurred which
may affect performance of his obligations he shall promptly notify the other party.
15.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall
endeavour to continue to perform his obligations under the Contract so far as
reasonably practicable. The Contractor shall notify the Engineer-in-Charge of the steps
he proposes to take including any reasonable alternative means for performance,
which are not prevented by Force Majeure. The Contractor shall not take any such
steps unless directed so to do by the Engineer-in-Charge.
15.8 If circumstances of Force Majeure have occurred and shall continue for a period of
180 days, notwithstanding, the Contractor may by reason thereof, having been
granted an extension of Time for Completion of the Works, either party shall be
entitled to serve upon the other, 30 days’ notice to terminate the Contract. If at the
expiry of the period of 30 days Force Majeure shall continue, the Contract shall
16 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules &
procedure. Any extra cost involved due to incompleteness of work or bad
workmanship found out subsequently shall be set right with and by you at your own
HANDING OVER OF ASSET
17.1 After successful completion of the lines and Transformers or any other electrical
equipment the entire newly created network is to be handed over to the concern
Deputy Engineer of PGVCL. The handing over note covering the details of all the
materials used and total work executed must be signed jointly by the bidder and
PGVCL Engineer. Copy of handing over note must be attached along with bill.
17.2 The contractor shall arrange to hand over the complete work immediately on
completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by
contractor due to non-availability of particular item/material for long period of time
and TLE cannot be approved for that work beyond certain time limit Or such item if
not required to be installed at particular location, then Recovery is to be made as
mentioned below for not carrying out that work from SWO issued for that work.
Sign Stamp of the Bidder Page 41|97
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other
Recovery should be made other than above Work.
19. CONTRACT QUALITY ASSURANCE:
19.1 The Bidder shall include in his proposal the Quality Assurance Program containing the
overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
19.2 At the time of Award of Contract, the detailed Quality Assurance Program to be
followed for the execution of the Contract. PGVCL reserve the right to inspect the
work at any stage of contract i.e. during the execution and after the execution of work.
19.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out
items (if any) are being supplied. Such details shall be accompanied by their list of
previous supplies made performance reports etc. However, in case of orders are
placed, specific approval shall be obtained from the PGVCL for the vendor supplied
materials. The quality assurance program shall be furnished for each material
separately for approval.
20. TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
20.1 In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to
cancel the order without giving reasons thereof and forfeit the security deposit.
20.2 The PGVCL reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor
of his decision to do so.
20.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall
discontinue the work on the date and to the extent specified in the notice, make all
reasonable efforts to obtain cancellation of all orders and Contracts to the extent they
are related to the work terminated and terms satisfactory to the PGVCL, stop all
further sub-contracting or purchasing activity related to the work terminated, and
assist PGVCL in maintenance, protection, and disposition of the works acquired under
the Contract by the PGVCL. In the event of such a termination the Contractor shall be
paid compensation, equitable and reasonable, dictated by the circumstances
prevalent at the time of termination.
20.4 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless the PGVCL is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of
partnership, the surviving partners, are capable of carrying out and completing the
Contract the PGVCL shall be entitled to cancel the Contract as to its in completed part
without being in any way liable to payment of any compensation to the estate of
deceased Contractor and/or to the surviving partners of the Contractor’s firm on
Sign Stamp of the Bidder Page 42|97
account of the cancellation of the Contract. The decision of the PGVCL that the legal
representatives of the deceased Contractor or surviving partners of the Contractor’s
firm cannot carry out and complete the Contract shall be final and binding on the
parties. In the event of such cancellation the PGVCL shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased
Contractor and/or the surviving partners of the Contractor’s firm liable to damages
for not completing the Contract.
21. ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the
sole arbitration of a person nominated by Managing Director, PGVCL. This reference
shall be governed by Indian Arbitration Act prevailing at the time of dispute and the
rules made there under. The award in such arbitration shall be final and binding on all
the parties. Work under the agreement shall continue during the arbitration
proceedings unless the PGVCL or the Arbitrator directs otherwise
The technical information, drawings, specifications and other related documents
forming part of the enquiry or Contract are property of PGVCL and shall not be used
for any other purpose, except for the execution of the contract. All rights related to
the technical specifications, drawings and records are reserved by PGVCL only and no
part or partial should be reproduced, copied or alter without prior permission to
PGVCL in writing. In the event of the breach of this provision, PGVCL can claim the
damages caused by such events.
23.Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
23.1 Has submitted fake, false or forged documents/certificates
23.2 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and
unless it is sought for
23.3 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the
same is issued by the Company within the validity period and as per agreed terms and
23.4 Has committed breach of contract or has failed to perform a contract or has
abandoned the contract
23.5 Has failed to provide suitable expertise for the work as per prescheduled program
23.6 Has failed to submit all the necessary Test reports/documents within time schedule /
as per Company's time limit, as mentioned in the LOA, if the Letter of Acceptance
(LOA) is placed subject to submission of type reports / documents to the firm.
23.7 Has indulged in construction and erection of defective works.
23.8 Has substituted materials In lieu of materials supplied by the Company or has not
returned or has short returned or has unauthorised disposed of materials/
documents/ drawings/ tools or plants or equipment supplied by the Company
Sign Stamp of the Bidder Page 43|97
23.9 Has involved in malpractices such as bribery, corruption, fraud, canvassing and
23.10 Has unauthorised obtained official company information or copies of documents, in
relation to the Tender/Contract
23.11 Has failed to follow the stipulated mode of communication, if specified by the
tendering authority/ purchaser.
23.12 Any other ground for which in the opinion of the Company makes it undesirable to
deal with the Firm, and In case the State Government directs the Company to place a
firm in stop dealing/ banned for business dealing/ blacklisting
23.13 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or
any subsidiary Companies of GUVNL shall be considered as a stop deal and/ or
banned for business dealing and/ or blacklisting for all Companies.
24. Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are as
24.1 The proprietor/all the partners/directors of the stop deal/ banned for business
dealing/ blacklisting firm shall also be considered for stop deal/ banned for business
Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in
the list of Stop dealing / Banned for business dealing in any Company of GUVNL and
its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid submitted by the
Firm shall be returned.
24.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put
on Stop dealing/ Banned for business dealing by GUVNL or any of its subsidiary
Companies, during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of
Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price bid of the
Firm should not be opened and the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of
(iii) After opening of price bid, the offer of the Firm should be ignored and will not be
further evaluated. The Firm will not be considered for issue of order even if its price is
the lowest. In this situation, the next lowest bidder shall be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be returned after
obtaining confirmation from GUVNL and its other subsidiary Companies that there
are no outstanding dues recoverable from the firm.
24.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is
already executing work and/ or Letter of Acceptance/ purchase order awarded to
them by another Company, then the firm should be allowed to complete such
awarded work / supply.
Sign Stamp of the Bidder Page 44|97
24.5 The amount of EMD/SD/ any payment against supply withheld at the instance of
GUVNL or any of its subsidiary Companies shall be appropriated against the dues
recoverable from the firm by GUVNL or any of its subsidiary Companies. EMD/ SD/ PG
in the form of bank Guarantee shall be encashed and appropriated.
24.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm
is put on Stop dealing/ Banned for business dealing, all the manufacturing works of
the Firm shall be on Stop dealing/ Banned for business dealing for GUVNL and its
Subsidiary Companies & for all Services of the Firm.
24.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary
Concern, then all the Concerns of the same Proprietor shall also be considered to be
on Stop Dealing/ Banned for business dealing.
24.8 The Board of Directors of the concerned Company may however, if he considers it to
be in the interest of the Company, remove the ban in respect of any specific Service
from any Contractor for that Company only.
25 Every bidder should, at the time of submission of bid, give a declaration as per
Annexure VI attached with this Tender, that bidder and/or proprietor/ partner/
director of the firm has not been placed on Stop dealing / Banned for business dealing
/ blacklisting by GUVNL and it’s any Subsidiary Companies.
Sign Stamp of the Bidder Page 45|97
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Sr. No. Item Time required for work Mentioned in Tender
Tender of Labour Work for Erection
and Maintenance of HT,LT & TC
Work Under ND and other Scheme
under Botad Rural Sub Division
Sign Stamp of the Bidder Page 46|97
Details of work experience in last three years
(To be completely filled by the Bidder)
Name of the Company
with full address, phone, Ref. & date of Work Order
Sr. No. Work Description Details of order
fax and name of contact the order Value
Copies of MAJOR Work orders along with Work completion certificates should be attached with this
If necessary, separate sheet may be used to submit the information
Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 47|97
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Name of the Company
completion with
with full address, Ref. & date of Work Order
Sr. No. Work Description Certification of
phone, fax and name the order Value
of contact person
Copies of MAJOR Work orders along with Work completion certificates should be attached
with this information.
If necessary, separate sheet may be used to submit the information
Tender for Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 48|97
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________
NA______________________________________, employee of PGVCL at
________________NA_____________ (place), is related to our
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent
Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
Sign Stamp of the Bidder Page 49|97
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified
below in this sheet. If there are no deviations offered, it should be clearly mentioned on this
Deviation offered to Chapter No, Clause No. of
Deviation offered
the tender document
No Deviation Offere No Deviation Offere
Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 50|97
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. No. Name of equipment Date of purchase Date of calibration Utility
1 Not Applicable
Tender for Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 51|97
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
Ref: - Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
All bidders will have to furnish the following undertaking duly filled in signed and stamped for each quoted item
of the tender along with the Technical Bid.
_____________________________________________________isnot stop deal/black listed by GUVNL and or
any subsidiary companies viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item.
Sign Stamp of the Bidder Page 52|97
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Rating & Type /
Type Test Report No. & Tests Carried out at (Name Designation of Name of the
Sr. No. Of the Tests.
Date of Laboratory) Item / test Conducted
1 Not Applicable
Tender for Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 53|97
List of Performance Certificate:
Name of the Authority by whom certificate is
Sr. No. Reference No. & Date Details of items
Executive Engineer, Erection and
1 Division Office, PGVCL, Maintenance of
Botad HT,LT & TC Work
Tender for Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 54|97
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Type Of Accident
Nos. of Affected
Sr. No. (Electrical/Mechanical) Fatal/Nonfatal Brief Reason for the Accident
Tender for Erection and Maintenance of HT,LT & TC Work
Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
Sign Stamp of the Bidder Page 55|97
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR MISHANDALING OF
Ref: - Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
_____________________________________________________ hereby certify that none of the
Proprietors/Partners/Directors is not under any criminal investigation for any kind of fraud for theft of material
or/and with handling the material and any civil and/or criminal case pending for such matter listed by GUVNL
and or any subsidiary companies. Viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item
Sign Stamp of the Bidder Page 56|97
Sub: -UNDERTAKING FOR Safety Gadgets
Ref: - Tender No: PGVCL/BTCO/Tech-2/847/1170-5/20.05.2026
provide_____________________________________________________nos of labours to carry out
this tenders scope of work. we are having Labour Insurance Policy No.
_____________________________________________________nos of our labours. we declare that,
as mention below table, we are having following safety gadgets of our own and they all are in good
Sr No. List of Safety Gadget Unit
owned by bidder
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items (Chain for Earthing ) No
Sign Stamp of the Bidder Page 57|97
CERTIFICATE – “A”
firms who have submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm
Signature of the Tenderer
With Designation
Sign Stamp of the Bidder Page 58|97
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.:-BTCO/Tech-2/847/1170-5/20.05.2026
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having
their registered office at _____________________________________ (Address of the firms
Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
(Supply/ Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank Guarantee
for (hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid till _________
(Mention here date of validity of this Guarantee which will be 5 (FIVE) months beyond initial
validity of Tender’s offer) which is required to be submitted by the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank
Guarantee) having our registered office at ______________________ (Address of Bank’s
registered office) hereby give this Bank Guarantee No.________________ dated _________ and
hereby agree unequivocally and Unconditionally to pay immediately on demand in writing from the
Paschim Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any amount not
exceeding Rs. ______________ (Amount of E.M.D.), (Rupees
_________________________________ (In words) to the said Paschim Gujarat Vij Company Ltd.
on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender
or part thereof by the Tenderer within its validity or Non submission of Security Deposit by the
Tenderer within one month from the date tender or a part thereof has been accepted by the
Paschim Gujarat Vij Company Ltd. would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encashed amount is
liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be terminable
by notice or by Guarantor change in the constitution of the Bank or the firm of Tenderer Or by any
reason whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alternations made, given, conceded with or without our
knowledge or consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. __________ (Amt. of E.M.D.) (Rupees
____________________________________) (In words). Our Guarantee shall remain in force till
_________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before_______ (Date of Validity of the Guarantee), all
rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and
discharged from all liabilities there under:
Please Mention here Complete Postal Address of Signature of the Bank’s Authorized Signatory
the Bank with Branch Code, Telephone and Fax with
Nos. Official Round Seal
Sign Stamp of the Bidder Page 59|97
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which
are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
1.• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij
Company Ltd. or any Officer authorized by it in this behalf any amount up to and not
exceeding _______ (in words) Rupees ___________________ to the said Paschim
Gujarat Vij Company Ltd. on behalf of M/s.
contract for the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of
______________ and shall not be terminable by notice or by change in the constitution of
the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or variations
or alterations made, given conceded or agreed, with or without our knowledge or consent, by
or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL
or Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
“NOTWITHSTANDING”anything contained herein before, our liability under this guarantee is
restricted to Rs.___________ (Rupees ___________________________ only). Our
guarantee shall remain in force until ____________________ (Date of validity of the
Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing
on or before_______ (Date of validity of the Guarantee), all rights of Beneficiary under this
Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities
Please Mention here Complete Postal Address of Signature of the
the Bank with Branch Code, Telephone and Fax Bank’s Authorized Signatory with Official Round
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which
are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
Sign Stamp of the Bidder Page 60|97
This agreement is made at ___________the ___ day of ______month _______Year between the
Paschim Gujarat Vij Company Ltd. & __________________________(hereinafter referred to as “the
Contractor “which expression shall unless excluded by or repugnant to the context included its
successors or permit assigns) of the one part and the Paschim Gujarat Vij Company Ltd. Having its
Regd. and Corporate Office at Laxminagar, Off Nanamava Road, Rajkot, 360004 (hereinafter called
“The Company” which expression shall unless excluded by or repugnant of the context include its
successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work of
____________________, Dated ___________, hereinafter called “The works and more particularly
desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer, , Circle/Division, PGVCL on behalf of the
Company, a list where of is made out in the schedule here under written and all of which said
documents are deemed to form part of this contract and include in the expression “The works
“wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and Underground cable up on the terms and subject to the conditions
herein mentioned.
The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable necessary
for the completion of the works as mentioned and at the time in the manner and subject to the
terms conditions and stipulation contained in this contract and in consideration of the due
provision, executions, construction and completion of the works agreed to by the contractors as
aforesaid the company both hereby covenant with the contractor to pay all the claims of money
as and when they become due and payable to the contractor under the provisions of the
contract such payment to be made at such times in such manner as is provided by the contract.
2) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of the
conditions and the covenant as stipulated in the general conditions specifications form Or
tender schedule drawing etc. attached with the Company LOA No.
3) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his Supervisors
and labours to execute the work mentioned in Tender. On violating or breaking the Safety Rules
and Regulations, and if Supervisors/Labours are found without Safety Gadgets, “The Company”
reserves the right to take actions as per the terms and conditions mentioned in Tender without
4) The Company reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The PGVCL shall in
such an event give fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
5) The Contractor upon receipt of such notice shall discontinue the work on the date and to the
extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders
and Contracts to the extent they are related to the work terminated and terms satisfactory to
the Company, stop all further sub-contracting or purchasing activity related to the work
terminated, and assist “The Company” in maintenance, protection, and disposition of the works
acquired under the Contract by the Company. In the event of such a termination the Contractor
shall be paid compensation, equitable and reasonable, dictated by the circumstances prevalent
at the time of termination.
Sign Stamp of the Bidder Page 61|97
6) If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the
Contractor is a partnership concern and one of the partners dies then unless “the Company” is satisfied that
the legal representatives of the individual Contractor or of the proprietor of the propriety concern and in the
case of partnership, the surviving partners, are capable of carrying out and completing the Contract “the
Company” shall be entitled to cancel the Contract as to its in completed part without being in any way liable to
payment of any compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the Company that the legal
representatives of the deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and
complete the Contract shall be final and binding on the parties. In the event of such cancellation the Company
shall not hold the estate of the deceased Contractor and/or the surviving partners of the estate of the deceased
Contractor and/or the surviving partners of the Contractor’s firm liable to damages for not completing the
The contract value extent of supply delivery dates, specifications as other relevant matters may be altered by
mutual agreement and if so altered shall not be deemed or constructed to mean and to effect or alter other terms
and conditions of the contract and the contract so altered or revised shall be and shall always be deemed to have
been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first above written.
Signed sealed and delivered by for
1 and on Behalf of the presence of
name and address.
Signed sealed and delivered by for
2 and on behalf Of The Paschim
Gujarat Vij Company Ltd
Sign Stamp of the Bidder Page 62|97
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of
_______________ and all future contract that may be awarded to me in the next one year and
in terms of the condition in clause 1.24 of Section VI of the COMPANY’s tender and contract for
I residing at by this Bond bind myself responsible for
and shall pay compensation to my workmen payable under the workmen’s compensation ACT –
1923 (viii of 1923) hereinafter called the said Act for death or injuries caused to the workmen
engaged by this presents, if such compensation is paid by the COMPANY as principal under
such sub-section (1) of section 12 of the said Act on behalf of me, to pay such amount of
compensation on demand within 48 hours to the COMPANY that it might have to spend as legal
and other incidental charges in defending any suit or action arising out of the death of injuries
in regard to compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the
death or injuries to the workmen engaged by me. During the execution of work of said contract
and all future contracts that may be awarded to me in the next one year is filed by the worker
against the COMPANY, I shall imbrues to the COMPANY such sum that
the COMPANY is required to spend as legal and other incidental charges in defending such suit
or action and also the amount that may be ordered to be paid to the worker / or his heirs as
compensation and that the above written bind shall remain in full force and virtue till the
COMPANY is required to defend such suit or action filed by the workers and or heirs against the
COMPANY. Further it is applicable on death of contractor himself also. No any compensation
will be claimed by legal heirs of contractor.
Signature of the Executant
Sign Stamp of the Bidder Page 63|97
SECTION VIII: Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work 11 KV and L.T.
Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the
PGVCL. The inferior and unsatisfactory work is liable for rejection and to be rectified
at the cost of contractor. The work will have to be carried out as per programmed laid
down by department and under the entire instruction of engineer-in-Charge and
contractor should employ supervisor who could supervise the works through out and
he should remain present on site. No tools & Tackles will be supplied by the
A. Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done
by the contractor at his cost. The Company will assist the contractor in getting
necessary permission for tree cutting etc. Any claim for compensation in above
respect will have to be borne by contractor.
B. Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and
will be shown to the contractor. He should adhere to these locations in all
circumstances unless directed by the department to make any change. The Poles from
One site to other site or at proposed locations must be carted by loading on Tractor
or Hand-Cart. The Poles shall not be carted by toeing/Dragging with Tractor or Cart or
with any other means.
C. Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height
of the pole and for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet.
The poles and guys must not be set at the edge of cuts/at shore/embankment where
the soil is liable to be washed or eroded out of such setting should be avoided. While
back filling, earth must be packed tight and in no case earth be dumped to greater
depth more than four inches without being rammed, hard before the next layer is
thrown in. Extra earth should be packed around the poles and rammed.
The cost of damage done to the pole during erection will be recoverable from the
contractor. No pole, which is out of plumb or out of alignment shall be accepted. The
pole will be in his safe custody till erected and he is liable to compensate to the
Company the full cost of pole along with supervision charges, if the pole is broken
during erection, or stolen from his custody. He should be able to render full account
of the poles entrusted to him whenever the Supervising Officer demands to
scrutinizes the same.
D. Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place
in the village, excavation of pit, erection in position (with base plate where required),
of 8/10 meter PSC poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting
of clamps and cross arms and fabricated materials, fixing of caution board, anti-
climbing device etc. complete as per drawing and specification inclusive of painting,
numbering. Generally vertical formation will be used on each pole. However
horizontal formation will have to be used in special circumstances as per instruction
at Engineer in change.
Sign Stamp of the Bidder Page 64|97
E. Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or
telephone line crossing, terminal structure for distribution transformer centre comprises
of Excavation suitable pits and refilling of earth, erection in position of two Nos. of 8/10
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps, cross arms,
bracing cross arm bracing etc. as per drawing/ standards with mounting D.O. fuses/A.B.
switches/HT metering equipment’s etc., painting, Pole numbering, fixing of caution
Board and anti-climbing devices.
The D.P. must be properly aligned and must be in plumb. Special structure if included will
be erected as per drawing supplied. Each Shackle Points must have “D” type Jumpers
F. Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary
HT/LT pin and strain insulators, binding on insulators, jumpers, the jointing in HT line will
be done by twisting sleeve joints as per standard practice. Care must be taken in
handling the conductor to protect against cuts, scratches or kinks. The conductor must
not be drawn over rough or rocky ground, when it is liable to be damaged. AAA/ACSR
conductors must be drawn on wooden or aluminium pulley only. Wastage and cutting
should be avoided as far as possible. Not more than 3 % sag will be accepted in the
materials account. The sag and spans will be maintained as per drawing/standard. The
cross arms insulators must be so fixed that neither tilts nor bands from position. The
sagging should be uniform for all conductors and uneven sagging will not be allowed. The
ground clearance to be maintained as per IE Rules 2010 Clause No. 58 as mentioned
For lines of voltage not exceeding 650 5.8 Meters
Across a street Volts
For lines of voltage exceeding 650 Volts
but not exceeding 33 kV
For lines of voltage not exceeding 650 5.5 Meters
Along any street Volts
For lines of voltage exceeding 650 Volts
but not exceeding 33 kV
If bare - 4.6 Meter
For lines of voltage up to and including
Elsewhere than along 11,000 Volts
or across any street
For lines of voltage exceeding 11,000 Volts
but not exceeding 33 kV
• An overhead line shall not cross over an existing building as far as possible and no
building shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules
Clause No. 60 from any accessible point, on the basis of maximum sag , shall be
observed, namely:-
Sign Stamp of the Bidder Page 65|97
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof-
(a) when the line passes above the building a vertical clearance of highest part of
building immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters
from the nearest point
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules
Clause No. 61 from any accessible point, on the basis of maximum sag, shall be
observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above
the building a vertical clearance of highest part of building immediately under such
line 3.7 meters from the highest point,
(b) When the line having voltage 650 V and up to and including 11000 V passes
to the building a horizontal clearance between nearest Conductor and any part of
such building on the basis of maximum deflection of wind must be 1.2 meters.
(iii) Minimum clearances in meters between lines crossing each other as per IE
Clause No. 69 are as below.
Nominal System Voltage 11-66 kV 220 kV 400 kV 800 KV
1 Low and Medium 2.44 3.05 4.58 5.49
In case of illegal construction / structure on the line under erection, the same is to be
put in written notice to the Engineer-In-charge.
G. Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation
of suitable pit size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay
wire. The stay insulators must be inserted in the stay wire on all stays as per drawing.
The wrapping of the Guy wire strands at both ends the stay insulator must be even
and must presents neat appearance and good workmanship. No stay should be left
loose but should be tight and straight to withstand in say cyclone or sand storm, the
item includes refilling of earth and painting of fabrication material. If stays are not
required to be concreted, a pre casted cement concrete block will be supplied by the
department from his division store which the contractor will have to transport at his
own cost to the site of work and will have to use for fixing of anchor rod at site.
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing
is required to be carried out. The earthing pipe/earthing plate/earthing coil supplied by
the company shall be used as per specification and drawing. GI wire no. 8 SWG for
earthing should be bolted with earthing pipe/earthing plate/earthing coil. G. I. Wire
must be passed through PVC rigid Pipe which must be buried at least 0.5 Meter in
ground and to be kept 2.0 Meters above ground along the Pole. The earthing are to be
done at place as indicted in the pole schedule or as selected by the field Engineer. The
coke and salt will have to be supplied by the contractor at his cost. Erection of earthing
should be carried out under the supervision of the Engineer in charge or nominated
Supervisors. At least 20 KG of salt and 20 KG of coal per earth on alternate layers (as
per drawing) will be used by contractor. No amount will be paid if the work is not done
in accordance with these specification.
Sign Stamp of the Bidder Page 66|97
The guarding will have to provide at crossing of lines, telephone line crossing, road
crossing and any accident prone places as indicated by the Engineer in Charge. The
work comprises of fixing of guard cross arms, eye bolts, guard cradle as per design, GI
cross lacing wires complete. Any special type of guarding if required will be designed
by the department. Binding cross arms must be used where the HT line crosses the
road. The ground clearance, line to line clearances etc. to be maintained as per IE Rules
2010 69 and 70. The poles for road crossing may be concreted as instructions of the
Engineer In-charge. The work has to be carried out as instructions of the Engineer In-
Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two
coats of approved aluminium paint. All fabricated material will also be painted with
two coats of approved aluminium paint and there should be sufficient interval
between every coat of painting in order to allow for drying. The bolts and must shall
be dipped in anticorrosive oil before insertion. The lower portion of steel poles up
foot above ground level shall be cleaned of all dust and rust. This surface should be
given a base coat of red lead and an additional coat of black bituminous paint before
inserting in the ground. The good quality paint will be supplied by the contractor and
should be of I.S.I mark and will be got approved from Executive Engineer, prior to
Name of the feeder and pole number has to be written on all the poles in
English/Gujarati as per instruction of Engineer In-charge. The colour of back ground
and name/number must be of contras colour. Prior to apply Colour for Numbering on
P.S.C poles, it should be properly cleaned and all accumulations of earth, dirt etc.
should be removed.
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC
Pole/Guys to be concreted without any special reason. The Concreting of PSC Poles
must be approved by concerned Executive Engineer prior to execution as per Tender
Condition mentioned under Section III Clause No. 2 and sub clause No.
Certificates for special Reason and approvals must be submitted with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by
Engineer In-Charge as and where required. Concreting should be with one part of
cement, two part of specified quality sand and four parts of well burnt Brice bats
(1:2:4). The mixture should be prepared on GI sheet and should be free from the dust.
Cement, river sand and metal should be used by contractor at his own cost. The
finishing coat of cement plaster shall be applied on outer surface Concreting and
boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for
stay 2 x 2x 1 Feet (0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet
(h) (2’ above and 1' below ground) (0.15 cmt).
Sign Stamp of the Bidder Page 67|97
L. Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on
two poles structures as per standard drawing and 5 KVA Transformers are to be on
Single Pole. This work include erection of special two pole structure as per Item No.
and fixing of all fabricated material for support of line, L.A., HG Fuse/AB Switch,
Transformer, LT Dist. Box, cable wiring, anti-climbing devices etc. The works includes
of transportation and hoisting of transformer, numbering and painting of all
fabricated materials. For transformer having capacity of 100 KVA and above MS
channel shall be utilize which will be supplied by the company. Three Earthing are to
be provided on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on
3) For neutral, two separate Earth wire on both side of Transformer and to be
All three earthing are to be done as in Delta Formation as shown in the attached
Drawing. All earthing wires are to be connected by proper size of lug and bolted at
each earthing points properly. The Earthing of Transformer Body must be done with
lug only. Looping or winding with Earthing Bolt on Transformer Body is not allowed.
Earthing wire Lugs are to be brought by Contractors. No any extra cost will be paid for
Extra payment for hard soil or rock is payable as per SOR as per committee report to
be formed to decide hard soil or rock which shall consists of Concerned SDO, Deputy
Engineer (Tech) and Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is
recoverable from contractor.
Before starting the work (new, alteration or addition) and during the works the
contractor must obtain line clear wherever necessary for the concerned officer of this
office of other Office. For any damage done to the Men, Materials and/or property
due to non-observance of rules, the contractor will be solely responsible.
Sign Stamp of the Bidder Page 68|97
4.23 Conflict of Interest among Bidders/ Agents.-
A bidder shall not have conflict of interest with other bidders for particular quoted
item. Such conflict or interest can lead to anti-competitive practices to· the detriment
of Procuring Entity's interests. The bidder found to have a conflict of interest shall be
Disqualified. A bidder may be considered to have a conflict of interest Wi.th one or
more. Parties in this bidding process for particular quoted Item, if:
A. they have proprietor/ partner(s)/ Director(s) in common; or
B. they receive or have received any direct or indirect subsidy/ financial 'stake from Any
C. They have the same legal representative/agent for purposes of this bid; or
D. They have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on the
bid of another bidder: or
E. bidder participates in more than one hid in this bidding process, Participation by a
bidder in more than one Bid Will result in the disqualification of all bids in whlch the
parties are involved. However, this does not limit the tncluslon of the components/
sub-assembly/ assemblies from one bidding manufacturer in more than one bid.
F. in cases of agents quoting in offshore. procurements, on behalf of thelr principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in: a particular tender enquiry. One manufacturer can also authorise only on.e
agent/ ·dealer. There can be only one bid from the following:
1. The principal manufaeturerdirectlv or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
G. a Bidder or any ·of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that Is the subject of the Bid:
H. in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/ management, only
one unit should quote. Similar restrictions would apply to closely related sister
companies. Bidder must properly declare such sister/ common business/
management units in same/Sister line of business.
I. Bidder shall not act in contravention/ violation to the provisions of competition act,
as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder
shall not have conflict of interest With other bidders for particular quoted Item, as
Sign Stamp of the Bidder Page 69|97
Sign Stamp of the Bidder Page 70|97
Sign Stamp of the Bidder Page 71|97
Sign Stamp of the Bidder Page 72|97
Sign Stamp of the Bidder Page 73|97
Sign Stamp of the Bidder Page 74|97
Sign Stamp of the Bidder Page 75|97
Sign Stamp of the Bidder Page 76|97
Sign Stamp of the Bidder Page 77|97
Sign Stamp of the Bidder Page 78|97
Sign Stamp of the Bidder Page 79|97
Sign Stamp of the Bidder Page 80|97
Sign Stamp of the Bidder Page 81|97
Sign Stamp of the Bidder Page 82|97
Sign Stamp of the Bidder Page 83|97
Sign Stamp of the Bidder Page 84|97
1. Corrigendem in tender Condition as per circular no : PGVCL/Tech-2/6155 Dt. 23.08.2022
The Warrantee period If during one year following the work completion any
maintenance is felt necessary , for example straitening of pole , cross arms
Conductor stringing , Tightening of Guy etc. then such work will have to done by the
bidder free of cost .
If there is any new material required for maintenance during this warrantee
period i.e. one year time period , such requirement will have to be approved by The
Executive Engineer of concerned division . Quarterly report of such material issued (
vendor wise ) will have to be shared with circle office by division office .
Sign Stamp of the Bidder Page 85|97
DETAILS OF WORKS UNIT
HT TAPPING FROM THE EXISTING POLE INCLUDING FIXING OF CROSS ARMS, CLAMPS ANTI-
CLIMBING DEVICES, DANGER BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF
1 FABRICATED MATERIALS AND NUMBERING COMPLETE WITHCOST OF PAINTS AS PER STANDARD NO.
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF PSC POLES OF 8 MT./200 KG INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, INSULATORS
2 ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NO.
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SET AND EARTHING.
ERECTION OF STEEL POLES OF 9 TO 11 METERS INCLUDING EXCAVATION OF PIT AND REFILLING
OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, DANGER
3 BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF STEEL POLE, FABRICATED MATERIALS NO.
USED ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SET ANDEARTHING.
ERECTION OF STEEL POLE OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG LINE FOR
0.400/11/22KV OVERHEAD LINES I.E INCLUDING EXCAVATION OF PIT & REFILLING OFEARTH,
FIXING CROSS ARMS, TOP FITTING CLAMPS,ANTI-CLIMBING DEVICES DANGER BOARD, INSULATORS
4 ETC. COMPLETE AND PAINTING OF STEEL POLES, FABRICATED MATERIALS USED ON THE POLES NO.
AND NUMBERING WITH COSTOF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF 8 METERS 200 KG PSC POLES INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTHING, FIXING OF CHANNELS, SUPPORTING
ANGLES,CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS,INSULATORS ETC.COMPLETE AND
5 PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF NO.
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND
EARTHING.(WITHOUT AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURE OF 9 TO 11 METERS.STEEL POLE INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS, SUPPORTING ANGLES,
CLAMPS,ANTI-CLIMBING DEVICES DANGER BOARDS, INSULATORS ETC.COMPLETE & PAINTING OF
6 POLES,FABRICATED MATERIAL SUSED ON THE POLES AND NUMBERING WITH COST OF PAINTS AS NO.
PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND
EARTHING.(WITHOUT AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH, HG FUSES OF 8 MTRS
200 KG PSC POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH,FIXING OF
CHANNELS SUPPORTING ANGLES, CLAMPS, ANTI-CLIMBING DEVICES, DANGER BOARDS,
7 INSULATORS,DOFUSES ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE NO.
POLES AND NUMBERING WITH COSTOF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING
OF ERECTION OF GUY SET AND EARTHING.(WITH AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH,DO FUSES, 9 TO
METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, FIXING OF
CHANNEL, SUPPORTING ANGLES, CLAMPS, ANTI-CLIMBING DEVICES , DANGER BOARDS,
8 INSULATORS, ETC. COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ONTHE NO.
POLES AND NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SET AND EARTHING.(WITH AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH, DO FUSES,
TRANSFORMERS, LIGHTENING ARRESTORS, DISTRIBUTION BOX. OF 8 METERS 200 KG AND PSC
POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS
FROMSTORES TO SITE, FIXING OF CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS
9 CLAMPS, ANTICLIMBING DEVICES ,DANGER BOARDS, CONDUCTOR AND CABLE WIRING NO.
ETC.COMPLETE AND PAINTING OF FABRICATED MATERIALS USE ON THE POLES AND NUMBERING
WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY
SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH, DO FUSES
TRANSFORMERS, LIGHTENINGARRESTORS, DISTRIBUTION BOX 9 TO 11 METERS STEEL
POLESINCLUDING EXCAVATION OF PITS & REFILLING OF EARTH CARTING OF TRANSFORMERS
FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING ANGLES, BRACING, CROSS
10 ARMS,CLAMPS, ANTICLIMBING DEVICES, DANGER BOARDS,CONDUCTOR AND CABLE WIRING ETC. NO.
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THEPOLES AND
NUMBERING AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTIONS OF GUY SETS AND
ERECTION OF GUY SET INCLUDING EXCAVATION OF PITS &REFILLING OF EARTH AS PER
11 STANDARD SPECIFICATION WITH STAY CLAMPS, STAY WIRE, ANCHOR ROD, TURN BUCKLE, EYE NO.
BOLT, GUY INSULATOR, CEMENT CONCRETE BLOCK ETC. BUT EXCLUDING CONCRETING.
CONCRETING OF POLES, GUYS, ETC. INCLUDING COST OF CEMENT SAND METAL (1:2:4) AND
12 WATER ETC. AS PER STANDARD SPECIFICATION. CEMENT SHOULD BE OPC (53 GRADE ) USED FOR CMT
ERECTION OF COIL TYPE EARTHING INCLUDING COST OF COAL SALT ETC. BUT WITHOUT COST
13 OF GI WIRE AS PER STANDARD SPECIFICATION (20 KG SALT + 20 KG COAL) NO.
ERECTION OF PLATE TYPE EARTHING INCLUDING COST OF COAL SALT ETC. BUT WITHOUT COST
14 OF GI WIRE AS PER STANDARD SPECIFICATION (20 KG SALT + 20 KG COAL) NO.
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITH CLAMPS, BRASS NIPPLE, BRASS HOLDER
15 TECK WOOD BUSH,REFLECTORS FUSE, WIRING ETC. AS PER STANDARD SPECIFICATION BUT NO.
EXCLUDING COST OF MATERIALS.
STRINGING OF 30MM2 ACSR/34MM2,55MM2 AAAC CONDUCTOR FOR 11/22KV & LT LINES ONE COND
16 INCLUDING FIXING OF INSULATORS, BINDING JUMPERING ETC.
17 STRINGING OF GI WIRE 8 SWG INCLUDING BINDING JUMPERING ETC. DO
DETAILS OF WORKS UNIT
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC 2.5/4.0 MM2 TWIN CORE CABLE
FROM TERMINAL POLE TO METERING POINT WITH METR EARTHING INCLUDING FIXING OF METER
18 & COMPLETE WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF MATERIALS BUT NO.
INCLUDING COST OF JUSTI KHILA.
PROVIDING THREE PHASE 4 WIRE SERVICE CONNECTION WITHPVC 4MM2/10MM2 FOUR CORE
CABLE FROM TERMINAL POLETO METERING POINT INCLUDING FIXING OF METER & COMPLETE
19 WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING COST OF MATERIALS BUT INCLUDING NO.
COST OF JUSTI KHILLAS, NUTS & BOLTS.
ADDITIONAL COST FOR EXCAVATION OF PIT IN HARD ROCK AREA FOR ERECTION OF POLE/ GUY
ETC. AS PER STANDARD SPECIFICATION OVER & ABOVE NORMAL COST COVERED AGAINST
20 EXCAVATION OF PIT UNDER NORMAL SOIL FOR ERECTION OF POLE,GUY, DOUBLE POLE NO.
STRUCTURE EARTHING WITH THE APPROVAL OF SUPDT.ENGINEER.
21 PROVIDING GUARDING TO HT LINE ON ROAD/ RAIL CROSSING. MTR
22 PROVIDING GUARDING OF LT LINES ON ROAD/RAIL CROSSING. MTR
23 LT LINE TAPPING- SINGLE PHASE NO.
24 LT LINE TAPPING- THREE PHASE NO.
STRINGING/LAYING OF OVERHEAD LT CABLE FOR ROAD CROSSING,HT LINE CROSSING AND
25 TELEPHONE LINE CROSSING ETC.(PER SPAN) Per Span
ERECTION OF SINGLE POLE STRUCTURES WITH DO FUSES, TRANSFORMERS, LIGHTENING
ARRESTOR, DISTRIBUTION BOX. ON 8 METERS 200 KG PSC POLE INCLUDING EXCAVATION OF
PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS FROM STORES TO SITE, FIXING OF
26 CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES NO.
DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF SINGLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH ,DO FUSES,
TRANSFORMERS, LIGHTENING ARRESTOR, DISTRIBUTION BOX. ON 9 TO 11 METERS RSJ POLE
INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS FROM
27 STORES TO SITE, FIXING OF CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS CLAMPS, NO.
ANTICLIMBING DEVICES DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND
PAINTING OF FABRICATED MATERIALS USED ON THE POLE AND NUMBERING AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF SINGLE POLE STRUCTURES WITH, HG FUSES, TRANSFORMERS, LIGHTENING
ARRESTOR, DISTRIBUTION BOX ON EXISTING 8 METERS 200 KG PSC POLE INCLUDING
EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS FROM STORES TO
28 SITE, FIXING OF CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING NO.
DEVICES DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF SINGLE POLE STRUCTURES WITH , HG FUSES, TRANSFORMERS, LIGHTENING
ARRESTOR, DISTRIBUTION BOX ON EXISTING 9 TO 11 METERS RSJ POLE INCLUDING EXCAVATION
OF PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS FROM STORES TO SITE, FIXING
29 OF CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES NO.
DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF PSC POLES OF 10 MT./270 KG INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS, ANTI-CLIMBING DEVICES, INSULATORS
30 ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NO.
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF 10 METERS 270 KG PSC POLES INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTHING, FIXING OF CHANNELS, SUPPORTING
ANGLES,CLAMPS, ANTI-CLIMBING DEVICES DANGER BOARDS,INSULATORS ETC.COMPLETE AND
31 PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF NO.
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND
STRINGING OF 100MM2 ACSR/100MM2 AAAC CONDUCTOR FOR 11/22KV & LT LINES INCLUDING ONE COND
32 FIXING OF INSULATORS, BINDING JUMPERING ETC.
STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL ACCESSORIES I.E. SPECIAL
DESIGN SUSPENSIION/TENSION CLAMP, FIXING OF CROSS ARM, LT SHACKLE INSULATOR, &
33 DIRECTED BY ENGINEER-IN-CHARGE. MTR
STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL ACCESSORIES I.E. SPECIAL
DESIGN SUSPENSIION/TENSION CLAMP. FIXING OF CROSS ARM, LT SHACKLE INSULATOR,ETC. FOR
34 FIXING OF MESSENGER WIRE COMPLETE, AS REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE. MTR
STRINGING OF 11KV ABC OF FOLLOWING SIZES IN RURAL/URBAN AREA INCLUDING FIXING OF
CROSS ARM, SPECIAL DESIGN SUSPENSION/TENSION CLAMP, BINDING TO PIN INSULATOR,
PREPARING SHACKLE POINT JUMPERS ETC. AS REQUIRED AND DIRECTED BY ENGINEER-IN-
STRINGING OF ABC OF FOLLOWING SIZE INCLUDING FITTING OF ALL ACCESSORIES
36 (I) 2C X 50 + 1C X 25 + 35 SQ. MM Mtr
DETAILS OF WORKS UNIT
ERECTION OF DOUBLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH, HG FUSES,
TRANSFORMERS, LIGHTENING ARRESTORS, DISTRIBUTION BOX OF 10 METERS 270 KG AND PSC
POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF TRANSFORMERS
FROM STORES TO SITE, FIXING OF CHANNELS, SUPPORTING ANGLES, BRACINGS CROSS ARMS
37 CLAMPS, ANTICLIMBING DEVICES DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC. NO.
COMPLETE AND PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NUMBERING
WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY
SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE FOR CTPT UNIT ( PSC POLE )
(ERECTION OF DOUBLE POLE STRUCTURES WITH CTPT, LIGHTENING ARRESTORS, OF 8 METERS
200 KG AND PSC POLES INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF
CTPT FROMSTORES TO SITE, FIXING OF CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS
38 CLAMPS, ANTICLIMBING DEVICES ,DANGER BOARDS, CONDUCTOR AND CABLE WIRING NO.
ETC.COMPLETE AND PAINTING OF FABRICATED MATERIALS USE ON THE POLES AND NUMBERING
WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY
SETS AND EARTHING.)
ERECTION OF SINGLE POLE SHACKLE POINT ON PSC POLE 8 MT./200 KG.(ERECTION OF PSC
POLES OF 8 MT./200 KG INCLUDING EXCAVATION OF PIT AND REFILLING OF EARTH, FIXING OF
39 CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, INSULATORS ETC. COMPLETE AND NO.
PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING)
ERECTION OF SINGLE POLE SHACKLE POINT ON STEEL POLE ( 9 TO 11 MTR )
(ERECTION OF STEEL POLES OF 9 TO 11 METERS INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES,
40 DANGER BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF STEEL POLE, FABRICATED NO.
MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET ANDEARTHING).
ERECTION OF SINGLE POLE SHACKLE POINT ON STEEL POLE (13 MTR)
(ERECTION OF STEEL POLES OF 13 METERS INCLUDING EXCAVATION OF PIT AND REFILLING OF
EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, DANGER BOARD,
41 INSULATORS ETC. COMPLETE AND PAINTING OF STEEL POLE, FABRICATED MATERIALS USED ON NO.
THE POLE AND NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SET ANDEARTHING)
ERECTION OF DOUBLE POLE STRUCTURE OF 13 MTR STEEL POLE
(ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH, DO FUSES
TRANSFORMERS, LIGHTENINGARRESTORS, DISTRIBUTION BOX 13 METERS STEEL
POLESINCLUDING EXCAVATION OF PITS & REFILLING OF EARTH CARTING OF TRANSFORMERS
42 FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING ANGLES, BRACING, CROSS NO.
ARMS,CLAMPS, ANTICLIMBING DEVICES, DANGER BOARDS,CONDUCTOR AND CABLE WIRING ETC.
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THEPOLES AND
NUMBERING AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTIONS OF GUY SETS AND
ERECTION OF DOUBLE POLE STRUCTURE FOR CTPT UNIT ( GIRDER POLE )
(ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OF CTPT, LIGHTENINGARRESTORS,
TO 11 METERS STEEL POLESINCLUDING EXCAVATION OF PITS & REFILLING OF EARTH CARTING
OF CTPT FROM STORE TO SITE, FIXING OF CHANNELS SUPPORTING ANGLES, BRACING, CROSS
43 ARMS,CLAMPS, ANTICLIMBING DEVICES, DANGER BOARDS,CONDUCTOR AND CABLE WIRING ETC. NO.
COMPLETE AND PAINTING OF POLES FABRICATED MATERIALS USED ON THEPOLES AND
NUMBERING AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTIONS OF GUY SETS AND
PROVIDING SINGLE PHASE SERVICE CONNECTION (FOR SOLAR GENERATION METER, HIGH RISE
BUILDING, COMPLEX ETC.)WITH PVC 2.5/4.0 MM2 TWIN CORE CABLE FROM COMMON BUS BAR
44 TO METERING POINT INCLUDING FIXING OF METER & COMPLETE WORK AS PER STANDARD NO.
SPECIFICATION BUT EXCLUDING COST OF MATERIALS.
PROVIDING THREE PHASE 4 WIRE SERVICE CONNECTIONS (FOR SOLAR GENERATION METER, HIGH
RISE BUILDING, COMPLEX ETC.) WITH PVC 4MM2/10MM2 FOUR CORE CABLE FROM BUS BAR TO
45 METERING POINT INCLUDING FIXING OF METER & COMPLETE WORK AS PER STANDARD NO.
SPECIFICATION BUT EXCLUDING COST OF MATERIALS.
46 Replacement of V-X-Arm with transportation,etc (+) Painting. Set
47 Straightning of tilted V-X -Arm & Top fiting / LT X-Arm/ Tapping Angle No.
48 Dismentaling of Old V-X-Arm with Top fiting / LT X-Arm/ Tapping Angle from existing pole. Set
49 Fixing of V-X-Arm with Top / LT - X- Arm/ Tapping Angle on existing nacked pole with colour Set
50 Refixing & Changing hight of V-X-Arm / LT-X-Arm / Tapping Angle Projection Brackets. No.
Dismentaling of Old deteriorated/Broken PSC Pole with all Fabrication - with crediting
51 fabrication at field store and staking of pole safely on road side. No.
Dismentaling of existing re-usable PSC Pole with all Fabrication - with crediting fabrication at
52 field store and staking of pole safely on road side. No.
Dismentaling Of Old Deteriorated/Broken/ Rail Pole / Tubular Pole With All Fabrication - With
53 Crediting Fabrication At Field Store And Staking Of Pole Safely On Road Side. No.
Dismentaling Of existing M.S.Girder Pole with entire length , intact and Re-Usable With All
54 Fabrication - With Crediting Fabrication At Field Store And Staking Of Pole Safely On Road Side. No.
55 Dismentaling of Old deteriorated/Broken D.P. Structure set of PSC Poles Set
56 Dismentaling of Old re-usable D.P. Structure set of PSC Poles (if intact and re-usable) Set
57 Dismentaling Of Old Deteriorated/Broken D.P. Structure Set Of M.S.Girder Poles Set
58 Dismentaling Of intact and Re-Usable D.P. Structure Set Of M.S.Girder Poles Set
Replacement Of 11 Kv Pin Insulator With Providing New Double Pin Bindings.(old pin rod
59 should be credited to field store) No.
DETAILS OF WORKS UNIT
Replacement Of Old 11 Kv Pin Insulator By New 22 Kv Pin Insulator With Rod And Providing
60 Double Pin Bindings And Check Nuts Etc. No.
61 Re-Pin Binding With Cleaning Of 11 Kv / 22 Kv Pin Insulator. No.
62 Replacement of old 11 KV Disc Insulator by New one with binding etc. No.
63 Providing 11 KV double disc insulator with binding etc. No.
Replacement of old jumpers and providing new D - type jumper on both side with 8" binding
64 and pvc pipe etc. Per Jumper
Replacement of existing ACSR./all alu. Conductor up to 55 mm2 by new one/ coated conductor Per cond.
65 with double pin binding including transportation and crediting to store etc.
Replacement of existing 11 KV conductor by 0.1 A.C.S.R./ AAAC DOG conductor with new Per cond.
66 double pin binding.
Re-stringing of 11 KV A.C.S.R./AAAC Conductor & L.T. Line conductor/ Coated conductor (All 1 Wire per
67 size) with new double pin binding between two location.
68 Re-stringing of 11 KV Aerial Bunch Cable (All size) between two location. Per Span
69 Removal / Dismentaling Of Ex. Ht / Lt Line Conductor (All Size)
70 Straightning of tilted PSC Poles / Gurder Poles. No.
71 Dismentaling of guy set comp. with rod (If possible) etc. Set
72 Re-tightning in all respect of loose guy set. Set
73 Providing new guy insulator and tightning of guy set / Repairing etc Set
74 Trimming / Cutting of tree branches of obstructing HT/LT Line on one tree.
75 Cutting of bigger size of tree branches/ whole tree obstructing HT/LT Line.
76 Providing 11 KV projection brackets in place of old V-X- Arm Set
77 Providing H.T. / L.T. proj. brackets (Combined) in place of ex. Old V-X Arm / L.T. X-Arm etc. Set
78 Providing LT projection brackets in place of old L.T. X-Arm etc. Set
79 Dismentaling of exist. HT / LT proj. brackets. Set
80 Providing bracing angle set in ex. D.P. ( 4-Angles) Set
81 Straghtning of tilted D.P. Set ( PSC / Gurder pole) etc with refilling of stones, morum etc. Set
Laying of 11 KV power cable from 70mm2 to 225mm2 with excation of 3 Feet depth cable
82 trench and refilling the same with providing bricks layers and refilling the same with sand / Mtr
marrum upto ground level as per specification.
83 -do-, additional cable in same tranche with additional bricks for seperating both cables Mtr
84 Re-activation of earthings of poles No.
Repairing And Providing Ht / Lt Guarding With Straghtning Of G.I. Wire & Providing Lacings At
85 Mtr Dist. As Per Specification With Using I - Rod Etc. Per Mtr.
Providing name of 11 KV fdr in "Gujarati" only on PSC / Girder Poles with providing back
86 ground colour on poles with two coats of colour and size of letters to be 2 to 3" in approved No.
ISI colour (Asian Apeolite, Three Mengo including all materials.
Providing Pole No with S/S code No, S/Dn Code No. / Fdrs Code No. / T.C. Code No. etc. with
87 back ground colour and hight of letters to be 2 to 3" I.S.I. approved colour (A.A. 3 Mengo ) No.
including all materials.
Providing New 11 KV A.B./ G.O. Switch with fabrications and insulated colour code jumpers /
88 bindings lug etc. Set
Providing New 11 KV D.O. Fuse With Fabrication And Insulated Colour Code Jumpers / Binding
89 / Lugs Etc. Set
Replacement of old 11 KV A.B. / G.O. Switch with providing new insulated colour code jumpers
90 / bindings / lugs etc. Set
91 Replacement of old 11 KV D.O. Fuse unit comp. No.
Providing C.C. ex. HT / LT Line Poles, Guy Sets etc as per sp. with all materials by contractors
92 including cement in 1:2:4 ratio as per sp it also includes excavation & relavent works and Cmt
muffing. (Cement Should Be Opc (53 Grade ) Used For Concreting)
Providing Muffing in stone masonry in cement mortar 1:5 for X'mers as per sp. with all
93 materials by contractors including cement without excavation work. (Cement Should Be Opc Cmt
(53 Grade ) Used For Concreting)
94 V-X-Arm / Tapping Chennal or Angle with all fiting.(Only colour work on ex. Items.As per specification) No.
95 L.T. -X-ARM + '-do-(Only colour work on ex. Items.As per specification) No.
96 H.T./L.T. Proj. brackets complete(Only colour work on ex. Items.As per specification) Set
97 H.T. Proj brackets(Only colour work on ex. Items.As per specification) Set
98 L.T. Proj. brackets(Only colour work on ex. Items.As per specification) Set
99 C Clamp(Only colour work on ex. Items.As per specification) No.
M.S.Girders 100x116 / Rail & Angle & Tubular Poles (9 to 13 Mtrs Long) Excluding Fabricated
100 Materials(Only colour work on ex. Items.As per specification) No.
101 M.S. Girders poles (150x150x11 to 13 Mtrs.)(Only colour work on ex. Items.As per specification) No.
D.P. Structure + All fabrications. (PSC Poles)-without Bracing(Only colour work on ex. Items.As per
102 specification) No.
D.P. Structure + All fabrications. (PSC Poles)-with bracing(Only colour work on ex. Items.As per
103 specification) No.
104 do- Transformer Structure set - PSC/Girder Pole.(Only colour work on ex. Items.As per specification) Set
105 Providing of XLPE hard coating on 34 mm2 AAAC conductor with 3 mm coating. Km
106 Providing of XLPE hard coating on 55 mm2 AAAC conductor with 3 mm coating. Km
107 Cost of drum in which party will return the Hard Core XLPE coated conductor. No.
108 Straightening of Transformer Centre No.
HT ABC Dismantling
109 (1)3x95mm2+1x80mm2 Mtr
DETAILS OF WORKS UNIT
110 Erection of Naked PSC Poles of 8 Mt./200 KG No.
111 Erection of Naked Steel Poles of 9 to 11 Mtr No.
112 Erection of Naked Steel Poles of 13 Mtr No.
113 Fixing of Pin Insulator with Pin rod with binding No.
114 Fixing of Disc Insulator with H/W with Binding No.
115 Dismantling of Pin Insulator With Rod No.
116 Dismantling of Disc Insulator With H/W No.
Dismantling of DP Angle/Channel with all fabraction, insulating materials etc. and crediting in
117 Field/Divisional Store. No.
118 Fixing of L Top No.
119 Re-Fixing of Top fitting in Proper position No.
120 Replacement of Top Fitting No.
121 Refitting of LA No.
122 Converting pin point to Shackle Point including Dismentaling & restringing etc. Location
123 Plumbing of PSC pole with straightening at tension point No.
124 Carting of PSC Pole at Destination morethan 5 Kms with prior approval of EE of Division No.
125 Petrolling of LT/HT Line & Submission of Summary Report Per Pole
126 Untie the kintting of the old AB Cable Mtr
127 D Type Jumper Per Jumper
128 Replacement of D.O.Fuse Set
129 Burning of Thread of LT/HT line including cost of oil bamboo etc. Span
130 Replacement Of LT X-Arm Comp. & Crediting In Store. Set
131 Replacement of LT Pin or shackle insulator by new one with double binding and climing etc. No.
132 Replacement of old deteriorated C - clamp No.
133 Re-Binding Of L.T. Pin / Shackle Insulator. No.
134 Providing spacer between L.T. Line condutor with binding etc. No.
135 Providing Cage Type Loop Guard In Vertical L.T. Line With Using Pvc Real Insulator Etc. No.
Replacement of old jumpers by new thick insulator colour code jumpers for bare conductor
136 with using PVC Pipe and providing 8" long binding on each jumpers. per Jumper
Providing SMC junction box or M.S. Box with wooden plate inside on pole with clamp etc. including fixing
137 of Kit kat Fuses up to No.
63 Amp & Neutral link with giving cable connections on poles and in fuses.-3 fuse
Providing SMC junction box or M.S. Box with wooden plate inside on pole with clamp etc. including fixing
138 of Kit kat Fuses up to No.
63 Amp & Neutral link with giving cable connections on poles and in fuses.-5 fuse
Providing SMC junction box or M.S. Box with wooden plate inside on pole with clamp etc. including fixing
of Kit kat Fuses up to
139 63 Amp & Neutral link with giving cable connections on poles and in fuses.-More Than 5 Fuse with respect Per fuse
to item No. 8.b
Replacement & Laying of O/H L.T. - PVC Cable for road / H.T. Line / P&T Line / Crossing with
140 using G.I. Wire No. 8/10 & PVC Real & Egg insulators etc.with connection of Lugs,etc. up to 70 One Span
Replacement & Laying of O/H L.T. - PVC Cable for road / H.T. Line / P&T Line / Crossing with
141 using G.I. Wire No. 8/10 & PVC Real & Egg insulators etc.with connection of Lugs,etc. for 95 One Span
Replacement of service lines with Meter Box & meters by using G.I. Wire No. 8/10, Real
142 insulator at the distance of 1.0 Mtr., two nos of egg insulator, wall fast, service angle, PVC No.
Service pipe etc. at equal vertical distance with giving connections of service.
143 -do-without meter box and meter No.
Replacement of service lines with Meter Box & meters by using G.I. Wire No. 8/10, Real
144 insulator at the distance of 1.0 Mtr., two nos of egg insulator, wall fast, service angle, PVC No.
Service pipe etc. at equal vertical distance with giving connections of service.
145 --do-- without meter box and meter No.
146 1 Phase Conn.Labour charge for replacement of Meter Box without meter. No.
147 3 Phse Conn.Labour charge for replacement of Meter Box without meter. No.
148 1 Phase Conn.Labour charge for replacement / providing of meter and Meter Box No.
149 3 Phse Conn.Labour charge for replacement / providing of meter and Meter Box No.
150 1 Phase Conn.Replacement of meter / providing only No.
151 3 Phse Conn.Replacement of meter / providing only No.
Labour Charge For Installation Of 3 Phase Meter Box & 3 Phase Meter On T.C. Complete In All Respect
152 Including Carting Of Set
Materials From Respective Store As Per Instruction Of Engineer Incharge.-In City Area
Labour Charge For Installation Of 3 Phase Meter Box & 3 Phase Meter On T.C. Complete In All Respect
153 Including Carting Of Set
Materials From Respective Store As Per Instruction Of Engineer Incharge.-In Rural Area
Providing leads of service wires on L.T. Line with 8 to 10 turns with insulation and 8 to 10 turns of bare
154 wire with L.T. Line No.
conductor and providing insulated PVC tape on it.-Per 1 Phase S/C.
Providing leads of service wires on L.T. Line with 8 to 10 turns with insulation and 8 to 10 turns of bare
155 wire with L.T. Line No.
conductor and providing insulated PVC tape on it.-Per 3 Phase S/C.
156 Stringing of Twin wire No.
157 Single Phase Meter, SMC & Service Shifting Work NO.
Providing Pole SMC BUS-BAR
158 (Providing leads of service wires on on BUS BAR per service) NO.
DETAILS OF WORKS UNIT
159 Providing Dropper ( 4mm/6mm Cable ) NO.
LT ABC Dismantling
160 (1)3x50mm2+16mm2+1x35mm2 Mtr
LT ABC Dismantling
161 (1) 1x35mm2 + 1x25mm2 Mtr
162 LT ABC Re-Stringing Per Span
Replacement of old jumpers by new insulated cover cable jumper/biding/lugs etc. etc from
163 L.A. to D.O. fuse or D.O. fuse to T/C. No
Replacement of old 200 KVA & above distribution box complete with making all connections
164 with crimping of lugs,tapping,neutral No
Replacement of old up to 100 KVA distribution box complete with making all connections
Dismentling of existing distribution transformer center up to 100 KVA with all fabrication and crediting the
166 old material Set
in sub-Division/Division store (With Transformer)-PSC Pole
Dismentling of existing distribution transformer center up to 100 KVA with all fabrication and crediting the
167 old material Set
in sub-Division/Division store (With Transformer)-Girder Pole
Dismentling of existing distribution transformer center above 100 KVA with all fabrication and crediting the
material including Distribution Transformer in sub-Division/Division store.-PSC Pole
Dismentling of existing distribution transformer center above 100 KVA with all fabrication and crediting the
material including Distribution Transformer in sub-Division/Division store.-Girder Pole
Dismantling of Transformer Centre (8 Mtr PSC Pole) (without Transformer) with crediting of
170 fabrication at store & stacking of pole safely on road side or Crediting to Departmental Store No.
Single Phase S/C-City Area(Disconnection & Reconnection)(Payment will be made after receipt of RC
171 Charges) No
172 Single Phase S/C-City Area(Only Disconnection ) No.
Single Phase S/C-Rural Area(Disconnection & Reconnection)(Payment will be made after receipt of RC
173 Charges) No.
174 Single Phase S/C-Rural Area(Only Disconnection ) No.
Three Phase S/C-City Area(Disconnection & Reconnection)(Payment will be made after receipt of RC
175 Charges) No
176 Three Phase S/C-City Area(Only Disconnection ) No.
Three Phase S/C-Rural Area - Other than Ag. (Disconnection&Reconnection)(Payment will be made after
177 receipt No.
178 Three Phase S/C-Rural Area - Other than Ag. (Only Disconnection) No.
Three Phase S/C-Rural Area - Ag. Connection (Disconnection & Reconnection)(Payment will be made after
179 receipt of RC Charges) No.
180 LT Pole Three Phase S/C-Rural Area - Ag. Connection (Only Disconnection) No.
181 Dismantlling and removal of service line from pole and crediting in store Single Phase-City Area No
182 Dismantlling and removal of service line from pole and crediting in store Single Phase-Rural Area No.
183 Dismantlling and removal of service line from pole and crediting in store Three Phase-City Area No
Dismantlling and removal of service line from pole and crediting in store Three Phase-Rural Area - Other
184 than Ag. No.
Dismantlling and removal of service line from pole and crediting in store Three Phase-Rural Area - Ag.
185 Connection No.
Excavation of trench 0.5 metre wide and 1 metre deep for laying of HT/LT underground cable
of size up to 300mm2 PILC or XLPE. (The cable should be laid on bed of sand and to cover cable
with half round RCC pipe 6" internal dia. And length of 1 metre along with each bottom and
186 top.) The entire trench thereafter should be refilled with earth duly rammed up to ground Meter
level as per drawing No. PGVCL/Tech/UG Cable/01/2014-15.
(Pro-rata charges may be given for extra digging.)
Excavation of trench 0.75 metre wide and 1 metre deep for laying of double HT/LT
underground cable of size up to 300mm2 PILC or XLPE. (The cable should be laid on bed of
sand and to cover cable with half round RCC pipe 6" internal dia. And length of 1 metre along
187 with each bottom and top.) The entire trench thereafter should be refilled with earth duly Meter
rammed up to ground level as per drawing No. PGVCL/Tech/UG Cable/02/2014-15.
(Pro-rata charges may be given for extra digging.)
Laying / re-laying of cable in cable trench and from ground level to Pole structure for providing
188 outdoor cable joints. Meter
Laying / re-laying XLPE/PILC cable by digging of pits, removal of old cable and laying of new
189 cable on sand bed as per item No.1 above. Meter
Widening & refilling with earth duly rammed the trench for laying additional No. of cable. For
190 Item No.1 above. Meter
Add : Charges for digging of Tar road for laying of cables over and above digging of pit in normal
191 soil as per Sr.No.1. Meter
Laying of underground 11 KV XLPE Cable by push and pool method (Manual) through with HDPE
Pipe 140mm diametre, 6mm thickness or 6" or 4" diametre GI Pipe without damaging surface of
192 the rod by Horizontal boring / drilling method (excluding cost of HDPE Pipe or 6" or 4" GI Pipe) Meter
as per drawing and specification. (Videography of work should be submitted with bill)
DETAILS OF WORKS UNIT
Laying of underground 11 KV XLPE Cable by push and pool method (by Horizontal directional
machine) through with HDPE Pipe 140mm diametre, 6mm thickness or 6" or 4" diametre GI Pipe
193 without damaging surface of the rod by Horizontal boring / drilling method (excluding cost of Meter
HDPE Pipe or 6" or 4" GI Pipe) as per drawing and specification.
194 Moulding of cable joints (straight joints, indoor and outdoor) for PILC Cable - labour charges. Nos.
Moulding of cable joints (straight joints, indoor and outdoor) for XLPE Cable - labour charges,
195 for Urban area. Nos.
Moulding of cable joints (straight joints, indoor and outdoor) for XLPE Cable - labour charges,
196 for Rural area. Nos.
197 Moulding of cable joints (straight joints, indoor and outdoor) for LT PVC Cable Nos.
Supply of HDPE pipe for laying 11 KV XLPE Cable 140mm diametre and 6mm thickness as per IS:
198 4984. R-Meter
DETAILS OF WORKS UNIT
Supply of HDPE pipe for laying 11 KV XLPE Cable 100mm diametre and 6mm thickness as per IS:
199 4984. R-Meter
200 Supply of half round RCC Hume pipe 6" internal diametre and length of 1 metre No.
201 Supply of mediam grade GI Pipe of size 6" diametre (including clamping the cable with Pole) R-Meter
202 Supply of mediam grade GI Pipe of size 4" diametre (including clamping the cable with Pole) R-Meter
Supply of RCC Hume Pipe of 6" internal diametre for laying cable for double circuit and road
203 crossing. R-Meter
Supply of sand 0.300 X 0.500 X 1.00 metre (layer at bottom of cable trench approx. 0.15 CMT)
204 as per Drg.No.PGVCL/Tech/UG Cable/01/2014-15 R-Meter
Supply of sand 0.300 X 0.750 X 1.00 metre (layer at bottom of cable trench approx.
205 CMT) as per Drg.No.PGVCL/Tech/UG Cable/02/2014-15 R-Meter
Rate of Route Marker
Providing, supplying & fixing route marker of C.C. 1:2:4, 150mm X 150mm X 750mm concrete
stone (PGVCL marked with approved yellow colour) embeded in earth atleast 300mm below the
206 ground level and 450mm above ground level at distance approximately 100 metre or as No.
directed by Engineer-In-Charge (this includes material and labour charges for excavation and
Dismantling of Under Ground Cable (Excavation and Refilling Earth and credited to store
207 without cutting/damage the cable.) Mtr
SR.NO. TRANSFOEM RATE FOR
ER CAPACITY TO 30 KM FOR
CITY RATE CITY AREA
Fail SR.NO. TRANSFOEM RATE FOR 0 RATE RATE RATE
tc ER CAPACITY TO 20 KM FOR FOR 0 FOR 41 FOR
RURAL AREA TO 21 TO 60 MORE
rate KM TO KM FOR THAN
40 KM RURAL 61 KM
Cable Kit Rate(Gst wiil be extra)
GEO MAPPING RATES
1 HT Line GEO Urja Mapping KM 112/KM
2 TC Center GEO Urja Mapping NO 20/NOS
Consumer Indexing (With all Details of Consumers like Meter No, Meter Make,Analogue / Static, Consumer Mobile 10/CONSUM
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOTAD R SDN HT TL TTC AND ND AND OTHER SCHEME .pdf
Download all tender documents and submit your bid