| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.4 L+₹18,036 (2.88%)Rejected-AOC | ₹6.4 L+₹18,036 (2.88%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical NO DETAILS FOUND | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | K P MUHAMMED L3 | VIMAL RAJU L1 | MOHAMMED RAFI M L2 | YASHIK L4 |
|---|---|---|---|---|---|---|---|
| 1.00Building Construction | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 25.2 | cum | 252.2 ₹6,355.44 | 244.08 ₹6,150.82 | 251.11 ₹6,327.97 | 197 ₹4,964.4 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.68 | cum | 5,561.79 ₹9,343.81 | 5,382.62 ₹9,042.8 Lowest | 5,537.75 ₹9,303.42 | 5,400 ₹9,072 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.36 | cum | 7,353.73 ₹54,086.68 | 7,116.83 ₹52,344.28 Lowest | 7,321.94 ₹53,852.87 | 7,300 ₹53,691.5 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.46 | cum | 8,954.65 ₹39,892.97 | 8,666.18 ₹38,607.83 Lowest | 8,915.93 ₹39,720.47 | 9,800 ₹43,659 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 19.77 | cum | 9,424.36 ₹1,86,347.87 | 9,120.76 ₹1,80,344.79 Lowest | 9,383.61 ₹1,85,542.12 | 10,500.1 ₹2,07,618.48 |
| 1.01 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 0.81 | cum | 7,775.11 ₹6,297.84 | 7,524.64 ₹6,094.96 | 7,741.5 ₹6,270.62 | 7,000 ₹5,670 Lowest |
| 1.01 | OD435722/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. | 9.39 | cum | 2,799.84 ₹26,287.7 | 2,709.64 ₹25,440.81 Lowest | 2,787.73 ₹26,174 | 3,200 ₹30,044.8 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,104.54 | kilogram | 78.82 ₹1,65,880.08 | 76.28 ₹1,60,534.54 | 78.48 ₹1,65,164.53 | 70 ₹1,47,318.01 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 41.7 | sqm | 270.73 ₹11,289.44 | 262.01 ₹10,925.82 | 269.56 ₹11,240.65 | 200 ₹8,340 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,176
Closing Date
11 Mar 2026, 6:00 pmClosed
ASSISTANT ENGINEER
O/o ASSISTANT ENGINEER LSGD SECTION THIRUVALI G.P
Annual Plan-Thiruvali GP 2025-26 PRO NO 362 THAYAMKODE ANGANWADI BUILDING CONSTRUCTION
2026_LSGD_842771_37
AE/LSGD/ETN/05/25-26
Open Tender
Civil Works - Buildings
Item Rate
THIRUVALI
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,870
₹21,176
6 Jun 2026
4 Mar 2026
13 Mar 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
Building Construction
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
OD435722/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1423270.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_1423270.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Other Document • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .