Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
11 Aug 2026, 10:30 amClosed
Executive Engineer HPPWD Divsion kasauli
Executive Engineer HPPWD Division kasauli
A/R and M/O HPPWD Rest House Parwanoo. (SH P/L Water Proffing on Set No.1 to 6)
2026_PWD_140469_1
5589-99 dated 31.07.2026
Open Tender
Civil Works
Percentage
Kasauli
As per tender document
3 documents required · 3 mandatory
₹350
₹9,800
3 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Cement concrete flooring 1:2:4 (1 cement :2 sand :4 graded stone Aggregate) finished with floating coat of neat cement including cement slurry but excluding the cost of Nosing of steps including cleaning of old paint surface with wire brush etc complete 40mm thick with 20mm nominal size stone aggregate. | 201.3 | Per SQM | 494.75 | ₹99,593.18 |
| 2 | Providing and laying in situ six course water proofing treatment with APP (Atactic poly-propylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer a 0.40 litre per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 Kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS: 702, 3rd and 5th layers of roofing membrane APP modified Polymeric membrane 1.5 mm thick of 2.25 Kg/sqm weight consisting of five layers prefabricated with centre core as 20 micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 7th, the top most layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1cement: 3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement: 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately). The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane as per direction of Engineer in Charge including carriage of all labour, equipment and material to various locations through all modes of transportation in all leads and lifts and all incidental charges. | 300 | Per SQM | 1,302.8 | ₹3,90,840 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 5.94 MB
BOQ_208346.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .