Deputy Municipal Commissioner
Construction Work of Additional Straircase at T.P. Scheme No.1 (Udhana-Majura), F.P. No.9 in Zone Office in South Zone-A (Udhana), Surat. (2nd Attempt)
268684
DMC/SZ-A/16/2025-26 WORK NO. 09
Open
Civil Works - Buildings
Surat
3 documents required · 3 mandatory
₹1,062
Commissioner, Surat Municipal Corporation
₹16,000
23 Jan 2026
23 Jan 2026
23 Jan 2026
10 Feb 2026
23 Jan 2026
Name of work : Construction Work of Additional Straircase at T.P. Scheme No.1 (Udhana-Majura), F.P. No.9
in Zone Office in South Zone-A (Udhana), Surat. (2nd Attempt)
DESCRIPTION QUANTITY UNIT AMOUNT
Excavation for foundation includ.sorting out & stacking of
1 useful materials & disposing of the excavated stuff upto 50 mt.
Lead & all lift, watering etc.Comp.
(A) Loose or Soft soil Executed With Manual Labour
SMC SOR-PAGE NO 1 IT NO
Providing and filling rubbles including hand packing and filling
2 interstices with quarry spalls behind abutments and between
returns as directed.
SMC SOR , ITEM NO. 22, PG. NO. 3 13.00 C.M. 1064.80
Providing & laying C.C 1:3:6 (1cement :3 coarse sand :6 Crushed
3 stone agg 20m.m Nominal size)&curing comp. excl. cost of form
work in :(a) foundation & Plinth
(A) Foundation 8.00 C.M. 3005.76
SMC SOR, PAGE NO 1 IT NO
Providing, mixing, placing, compacting by machine vibrator,
curing, testing M25 Design mix concrete as per IS 456:2000
4 (latest revision) and as per tender specification in all items
including cost of form work and rendering but excluding cost of
(A) foundation, footing, base of columns and mass concrete 15.00 C.M. 4180.62
SMC SOR, PAGE NO 14 DESIGN MIX M25
Providing, mixing, placing, compacting by machine vibrator,
curing, testing M25 Design mix concrete as per IS 456:2000
5 (latest revision) and as per tender specification in all items
including cost of form work and rendering but excluding cost of
(1) Having cross sectional area up to 0.085sq.mt. 0.00 C.M. 12587.74
(2) Having cross sectional area more than 0.085 sqmt & up to
(3) Having cross sectional area more than 0.12 sq. mt. 9.00 C.M. 9190.79
SMC SOR, PAGE NO 14 DESIGN MIX M25
(1)Having cross sectional area upto 0.08 sq.mt. 0.00 C.M. 8994.86
(2)Having cros sectional area more than 0.08 sqmt and upto
(3) Having cross sectional area more than 0.12 sq. mt . 5.00 C.M. 6999.09
SMC SOR, PAGE NO 14 DESIGN MIX M25
Providing & fixing IS Mark TMT Bar FE 500D reinforcement for
6 R.C.C. work incl. bending, binding & placing in position etc.comp.
Upto G.L./P.L. 4170.00 Kg. 76.21
SMC SOR, PAGE NO 1 IT NO
Filling in foundation and plinth with murrum or selected soil
7 in layers of 20cm. thickness including watering, ramming and
consolidating etc. complete.
SMC SOR, PAGE NO 1 IT NO 11 127.00 C.M. 289.06
Steel work welded in built up sections, framed work including
8 cutting, hoisting, fixing in position and applying a priming coat of
DESCRIPTION QUANTITY UNIT AMOUNT
(A) in beams & joists channels angles, tees, flats with connection
plates or angle cleats as in main & cross beams, hip & trussed
purlins connected to common raffers & the like.
SMC SOR , PAGE NO 09, IT NO
Providing & Applying 20mm.to 35mm Th.(Max. 35mm thickness
consider) Heavy Roller plaster on walls or similar surfaces at all
floor levels consisting of 12 mm av. Th. Backing coat of C.M. 1:3 (1
9 cement:3 sand : racron 3s ( 0.5 nos per bag )) also plaster master
wterproofing chemical 100 ml /bags as per companey manual &
approved by E.I.C or consultant & 8 mm. th. Finishing coat of C.M.
1:1 (1 cement: 1 sand) apply thick cement slurry and apply roller
horizontal as well as vartical ( two times ) up to good quality and 136.00 S.M 417.00
SMC SOR , PAGE NO 26, REHABILITATION IT NO
Painting two coat (excluding priming coat) on new steel and
other metal surface with synthetic enemal paint, burshing to give
an even shade including cleaning the surface of all dirt, dust and
other foreign matters.
SMC SOR, colour works,Pg No.15,item no.-08
Providing & applying two coats of weather shield max paint (3
coats may be required in case of darker colours.)of ICI Dulux or
Apex Ultima of Asian Paint including applying exterior acrylic
primer coat as per manufacturers specification and directions in
shade and colour approved by architects, on exterior surfaces of
the building including scaffolding, preparing the surface,
watering, curing etc. complete and as directed by the architects
and manufacturers. Surface Preparation : surface is thoroughly
clean, dry and free from all loose dirt, chalk, grease, fungi, algae
11 and flaking paint. This can be achieved by brushing with a wire/
stiff coir brush, followed by water jetting if required. Fill up all
minor cracks and defects with white cement and sand mixture in
the ratio 1:3. For application on previously painted wall, previous
coatings of paint must be thoroughly scraped off and Clean the
surface thoroughly using wire brushes. Priming: Apply a liberal
coat of exterior acrylic primer and allow it to dry for 4-5 hours.
Application of putty is not recommended. Minimum 4-6 hours
duration is required between each coat of weather shield max
For all Floors 136.00 S.M 82.00
SMC SOR, colour works,Pg No.16,item no.-17
Providing & laying granite slab 18mm thick in flooring, treads
of steps and landing laid on bed of 20mm thick cement
mortar 1:6 (1 Cement : 6 coarse sand) or lime mortar 1:1.5 laid
12 and finished with flush pointing in white or colour cement
including rubbing and polishing complete. (Basic Rate:-
For all Floors. 23.00 S.M 2410.00
SMC SOR 15-16, PAGE NO 4,IT NO 39 M.R.
DESCRIPTION QUANTITY UNIT AMOUNT
Providing and applying cement mortar (1:3) modified by using
polymer and expanding grout additives at 25mm thickness for
repair/strengthening of various RCC elements at all floor
levels, lead, lift, including breaking, chipping, dismentling existing
cover concrete and exposing existing reinforcement, applying
wirebrush for making surfaces of steel and concrete free from
rust and other loose materials, applying rust removing chemical
on existing reinforcement, applying anti-corrosive coating on
existing reinforcement, applying polymer bonding agent on
existing concrete surfaces before applying polymer modified
mortar in specified thickness as directed by the Engineer-in-
SMC SOR , PAGE NO 23, REHABILITATION IT NO
Providing and applying cement mortar (1:3) modified by using
polymer and expanding grout additives at 50mm thickness for
repair/strengthening of various RCC elements at all floor
levels, lead, lift, including breaking, chipping, dismentling existing
cover concrete and exposing existing reinforcement, applying
wirebrush for making surfaces of steel and concrete free from
14 rust and other loose materials, applying rust removing chemical
on existing reinforcement, applying anti-corrosive coating on
existing reinforcement, applying polymer bonding agent on
existing concrete surfaces before applying polymer modified
mortar in specified thickness as directed by the Engineer-in-
SMC SOR , PAGE NO 23, REHABILITATION IT NO
Apply hacking on RCC member manual or by mechanical as
discoused by engineer incharge. 350 - 400 notches (dents) per
15 sqmt. Process of making the back ground rough before plastering
for better bonding of mortar with RCC (Tacha)
SMC SOR , PAGE NO 26, REHABILITATION IT NO
Providing and appliying thixotropic Making up lost section of
concrete / mortor with thixotropic repair mortor of one
component, normal-setting, shrinkage-compensating, thixotropic
mortar for layers up to 25 mm thick. Supply and application of
one-component, normal-setting,shrinkage compensating
thixotropic mortar made from cementitious binders, selected
aggregates, special additives and synthetic polyacrylonitrile
fibres, for reconstructing deteriorated concrete structures. Apply
the mortar after adequate preparation of the substrate by
removing all deteriorated concrete to form a sufficiently-rough,
solid substrate with no detached portions. Clean the steel
reinforcement down to bare metal and apply a passivating
treatment by brushapplying two coats of one-component, anti-
corrosion cementitious mortar. Apply the product by trowel or
spray with a continuous-feed rendering machine on a clean
substrate saturated with water in layers up to 20 mm thick. To
improve expansion in the open air during the first few days of
curing, add a special curing additive when mixing the mortar to
reduce both plastic and hydraulic shrinkage at a dose of 0.25% in
weight on the weight of the mortar. The product must comply
with the minimum requirements of EN 1504-3 for structural
mortars and have the following performance characteristics:
DESCRIPTION QUANTITY UNIT AMOUNT
Compressive strength (EN 12190) (MPa):> 40 (after 28 days)
Flexural strength (EN 196/1) (MPa): 7 (after 28 days)
Compressive modulus of elasticity (EN 13412) (GPa): 25 (after
days) Adhesion to substrate (EN 1542) (MPa):> 2 (after 28 days)
Capillary absorption (EN 13057) (kg/m²•h0.5): < 0.20 Thermal
compatibility measured as adhesion according to EN 1542 (MPa):
– freeze-thaw cycles with de-icing salts (EN13687/1): > 1.5 (after
50 cycles) Storm cycles (EN 13687/2):> 1.5 (after 30 cycles) – dry
thermal cycles (EN 13687/4):> 1.5 (after 30 cycles) Reaction to
fire (EN 13501-1) (Euroclass):1 Consumption (per cm of
thickness) (kg/m²): approximately 18.5 Kg included and
calculated in the price for work carried out according to
specification: (1) hydro-cleaning of adhesion surfaces and
saturation of substrate with water immediately before applying
the mortar; (2) application of the mortar by trowel or spray
around steel reinforcement; (3) levelling off surfaces with a
straight edge and final tamping; (4) careful curing of the mortar
by spraying on water for at least 7 days (3times) after application.
SMC SOR , PAGE NO 25, REHABILITATION IT NO
17 Polishing flooring after repair work done as direct by E.I.C
SMC SOR , PAGE NO 26, REHABILITATION IT NO
Providing & Fixing Nylon net (having net weight-0.065 kg/sq.mt)
in outside as well as inside plaster / terrace water proofing at any
height (no load or lift will be paid for the same) etc as direct by
SMC SOR , PAGE NO 26, REHABILITATION IT NO
Providing Cement Concrete work 75% - M30-(design mix) and
25% micro concrete plus recron - 3s (12mm long polyester
fiber) plus appropriate dose of super lasticizer with curing,
finishing smooth, etc. complete for jacketing of structural
members at all floor levels, lead, lift, including breaking, chipping,
dismentling existing loose cover concrete and exposing
respective existing reinforcement as directed by the engineer-in-
charge, applying wirebrush for making surfaces of steel and
concrete free from rust and other loose materials, applying rust
removing chemical on existing reinforcement, applying anti-
19 corrosive coating on existing reinforcement, applying polymer
treatment and bonding agent on existing concrete surfaces as
directed by the Engineer-in-charge, etc. complete. The make and
quality of rust removing chemical, anti-corrossive coating,
polymer / epoxy bonding agent shall be approved by engineer-
incharge. The procedure for application shall be strictly in
accordance with manufacturer's detail specification, which shall
be submitted before start of work and shall be approved by the
Engineer-in-charge
SMC SOR , PAGE NO 24, REHABILITATION IT NO
Demolition including stacking of serviceable materials with all
lead and lift. (i)) RCC Work
SMC SOR , PAGE NO 18, DEMOLITION IT NO
DESCRIPTION QUANTITY UNIT AMOUNT
Demolition of brick work and stone masonry including stacking
of serviceable materials and disposal of unserviceable materials
with all lead and lift. (i) On Cement Mortar.
SMC SOR , PAGE NO 18, DEMOLITION IT NO
Removing and scraping of old deteriorated plaster of any
thickness from wall / RCC member including stacking of
serviceable material and disposal of unserviceable from site of
work with all lead and lift.
SMC SOR , PAGE NO 18, DEMOLITION IT NO
Dismentling steel work including distempering and stacking the
maerials with all lead and lift.
SMC SOR , PAGE NO 18, DEMOLITION IT NO
Dismentling door, windows, ventilators etc. (wood or steel)
shutters including chowkhats architraces, holdfasts and other
attacement etc. complete and stacking them within all lead and
lift. (i) Not exceeding 3 Sq.M. in area.
SMC SOR , PAGE NO 18, DEMOLITION IT NO
Dismentaling tiled of stone,kota,marble,tile and granite floors laid
in mortar including stacking of serviceable materilas and disposal
of unserviceable materials with all lead and lift.
SMC SOR , PAGE NO 18, DEMOLITION IT NO 10 to
26 Paver block flooring
SMC SOR , PAGE NO 18, DEMOLITION IT NO
Providing and fixing rebar of following diameter using chemical
grout of Swanchore/Hilti/Fischer or equivalent make including
cost of all equipments, tools, material, labour, etc. Standard
procedure as mentioned in manufacturer's specifications shall be
strictly followed, which shall be submitted and got approved from
the authority prior to start of work. The rate shall also include
cost of drilling of hole of required diameter and depth as
27 mentioned in manufacturer's specification, cleaning the hole with
required air blower and other necessary tools and tackles,
positioning, providing and grouting chemical, allied fixtures and
fasteners, etc. but excluding the cost of reinforcing bar etc.
complete. Item includes necessary scaffolding, staging, labour,
tools and equipments, etc. complete as directed by the engineer-
SMC SOR- Page no 11, It No.
DESCRIPTION QUANTITY UNIT AMOUNT
Providing & fixing in position collapsible steel shutters with
vertical channels 20 x10 x 2 mm. Braced with flat iron diagonals
20 x5mm size with top & bottom rails of T-iron 40x40x6mm. with
28 38mm dia. steel pulleys comp. with bolts, locking arrangements,
stoppers, handles incl. applying a priming coat of Redlead paint
Ground Floor 8.00 S.M 5865.10
SMC SOR , PAGE NO 5, IT NO
Providing & Fixing Polycarbonate sheet roofing with surface of
the sheet is coated with an anti-UV Co-extrusion layer having
good weather resistance, it can maintain its optical properties
and mechanical performance for a long time. Fasting is usually
done by screws.The fastening screws should be inserted about
500 mm apart and 300mm apart Along the supporting internal
29 purlin and edge pulin.All fixing holes with diameter at least 2 mm
larger than screw must be predrilled into each screw location.
The screws should be 6mm diameter with length according to
sheet thickness and corrosion resistant, with at least heavy duty
hot dripped galvanized or stainless steel. Excluding the cost of
purlins rafter and trusses.
(b) 2 mm thick Solid Sheet 23.00 S.M 1510.00
SMC SOR , PAGE NO 10, IT NO
Providing and fixing window having extruded aluminium colour
anodized section frame main outer size 63.50 x 38.10 x1.95 mm
(of Jindal section no.4605, @ Wt. 1.094Kg/mt) horizontal Two
track member size 61.85 mm x 31.75 mm x 1.20 mm (of jindal
section no:8687, @ Wt. 0.695 Kg/mt.) vertical member of size
61.85 mm x 31.75 mm x 130 mm (of jindal section no:8758 @ wt.
of 0.659 kg/mt) with sliding shutters of horizontal member size
40 mm x18 mm x 1.29 mm ( of jindal section no:8949, @ Wt. of
30 .456 Kg/mt) vertical member of size 40 mm x 18 mm x 1.29 mm
(of jindal section no:8947, @ Wt. of 0.456 Kg/mt/section 8948, @
Wt. of 0.457 Kg/mt) with 5 mm thick tranparent bronze colour
tineted float glass with powder coated aluminium fittings and
fixtures and transparent silicon sealant glass fixing to frame as
per details etc. complete for window.For all Floors.
(A) Same as above but colour anodized 8.00 S.M 1705.67
SMC SOR Alluminium Work ITEM NO.3(A),Pg No.17
Providing & fixing 35mm.th. Flush Door Solid Double Core
type Both Face water proof Ply Vennered & 1.5 mm th.laminate
shall be pasted on both side with adhesives as specified by the
manufacturers. The laminate shall be as per approved shade &
texture, of make incl. Sal wood frames of finished size 12cm x
7cm.incl. S.S. Hinges with nessary screws & Anodized aluminum
fixtures & fastenings For all Floor
(SOR SMC Pg No.5 It No. 51) MR
Dismentalling of R.C.C work by electric breaker, rate to include
32 all lead, lift , scaffoulding, transportation, and labour etc.
complete. As directed by engg. Incharge.
Aluminum section Window opening and refixing with all
necessary fix & fiting etc maid in wisely.
DESCRIPTION QUANTITY UNIT AMOUNT
SMC SOR , PAGE NO 26, REHABILITATION IT NO
Executive Engineer
South Zone - A (Udhna)
Sign of Contractor Surat Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
09 - Technical bid Add. Stair Case.pdf
09 - Price Bid Additional Stair Case.pdf
Download all tender documents and submit your bid