Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹7.2 L
Closing Date
26 Sept 2026, 12:00 pm4d left
Praveen Kumar
Suprintendig Engineer Varanasi Cercle Varanasi
Janapad Chandauli Me Gram Naraina Me Laghu Setu and Sampark Marg Ka nirman Kary
2026_CEUVZ_1187734_2
4315/183Com-VNSCircle/2026-27 Dated-10.09.2026
Open Tender
Civil Works
Fixed-rate
180 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹7.2 L
Yes
19 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | for Approach and Additional Approach Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m,transporting to site, spreading, grading to required slopes and compacting to meet requirment of Table 300.1 and 300.2 with lead upto 3000 m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,630 | Cum | 185.5 | ₹10,44,365 |
| 2 | Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 626 | Cum | 2,367 | ₹14,81,742 |
| 3 | Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (cement WBM grading III) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 813.75 | Cum | 2,927 | ₹23,81,846.25 |
| 4 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compresser as per Technical Specification Clause 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,812.5 | Sqm | 24 | ₹1,39,500 |
| 5 | Providing, Laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emuslion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of Type 'C' as per Tehnical Specification Clause 508 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,812.5 | Sqm | 212 | ₹12,32,250 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5,812.5 | Sqm | 80.8 | ₹4,69,650 |
| 7 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lift and leads , transporting to site, spreading, grading to required slopes and compacted to meet requirment of Table 300.2 with lead upto 3000 m as per as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1,100 | Cum | 174.4 | ₹1,91,840 |
| 8 | for Box Culvert (2 cell x 3 m span x 3 m H) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 360 | Cum | 40.7 | ₹14,652 |
| 9 | Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as perTechincal Specification clause 401(for box culvert) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 49.74 | Cum | 2,274.8 | ₹1,13,154.24 |
| 10 | Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 31 | Cum | 6,104 | ₹1,89,224 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_2236705.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .