| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 CrAdmitted-Finance AT P O CHARIGAON INDIPUR P S NIKIRAI DIST KENDRAPADA PIN 754214 | KENDRAPADA | ODISHA | 754214 | -27.65% | ₹6.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹5.5 L (0.90%)Admitted-Finance | -27.00% | ₹6.2 Cr+₹5.5 L (0.90%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 Cr+₹26.6 L (4.35%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -24.50% | ₹6.4 Cr+₹26.6 L (4.35%) | L3 | Admitted-Finance |
| 4 | L4₹6.6 Cr+₹45.9 L (7.51%)Admitted-Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | -22.22% | ₹6.6 Cr+₹45.9 L (7.51%) | L4 | Admitted-Finance |
| 5 | L5₹7.6 Cr+₹1.5 Cr (24.4%)Admitted-Finance | -9.99% | ₹7.6 Cr+₹1.5 Cr (24.4%) | L5 | Admitted-Finance |
Tender Value
₹8.5 Cr
EMD Value
₹8.5 L
Closing Date
22 May 2026, 5:00 pmClosed
Er. Sanjib Kumar Nayak
O/o the Chief Engineer and Basin Manager, Baitarani Basin, Keonjhar
Drainage Sluice
2026_CEBBK_128903_1
cebbkbaid-02/2026-27
Open Tender
Civil Works - Others
Percentage
547 days
Harichandanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹8.5 L
Yes
5 Sept 2026
7 May 2026
25 May 2026
7 May 2026
22 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre-measurement disposing the debris away from the work site with all leads, lifts and delifts with cost of all labour, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge. | - | One Sqm | 1 | - |
| 2Earth work in excavation of foundation in hard soil or gravelly soil with required lead, lift & delift including dressing and leveling the bed and dumping the excavated materials away from the work site including cost of labour, carriage, cess, etc. all complete as per specification and direction of the Engineer-in-Charge. | |||||
| 3Filling foundation and plinth with sand by mechanical/manual means and laying in layers duly compacted, watering including cost, carriage, royalty with all leads, lifts, delifts, cess etc all complete as per drawing and specification and as per the direction of Engineer-in-Charge | |||||
| 4 | Supplying, driving and fixing Z type sheet pile up to maximum depth of 6.00 mtr. including hire and running charges of driving machine and all labour charges with interlocking sheet piles including cost, carriage, handling, loading and unloading of sheet pile to worksite including welding wherever necessary to form a water tight cut off and including all incidental charges, cess complete as per approved drawing and specification as per direction of Engineer-in-Charge. | 1 | One Sqm | 1 | ₹1 |
| 5.1 | Double under reamed pile P1 (500mm Dia 12 mtr long) foundation with RCC M-25 size black hard granite (crusher broken) stone chips including cost of Boreholes but excluding cost of M.S rod/Tor steel and labour charges for cutting, bending and binding of steel with cost, conveyance, royalty, cess etc. complete as per direction of engineer-in-chief. | - | One Each | - | - |
| 5.2 | Double under reamed pile P2 (500mm Dia 12 mtr long) foundation with RCC M-25 size black hard granite (crusher broken) stone chips including cost of Boreholes but excluding cost of M.S rod/Tor steel and labour charges for cutting, bending and binding of steel with cost, conveyance, royalty, cess etc. complete as per direction of engineer-in-chief. | - | One Each | - | - |
| 6Providing and laying Cement Concrete of grade M-15 with 40mm down graded hard granite crusher broken chips, clean & coarse sand and approved cement mixing with concrete mixers for cast-in-situ cement concrete lining in bed and slopes of canal with sleeper beams and keys etc. in panels including cost, carriage, royalty, cess with all leads, lifts & delifts and supply of all labours, machineries, T&P etc. dewatering if required, compacting & finishing with concrete paver finisher to proper profile and grade watering for curing to required period and form work etc. complete as per the direction of the Engineer-in-Charge | |||||
| 7Providing & laying cement concrete conforming to M-25 grade in approved surface using 20 mm size and down graded black hard granite (crusher broken) chips and sharp sand of approved grading from approved quarry for RCC work conforming to specification, mixing by concrete mixture including hoisting and laying concrete in position, compacting with concrete vibrator with all leads, lifts, delifts for mix concrete, royalty of all materials, cess including dewatering, curing for specified days by suitable means with supervision charges including mobilization and demobilization with cost of construction and dismantling of gangway and scaffolding, chute with all materials, construction of coffer dam / approach road, diversion road, site illumination, hire and running charges of machineries, dewatering by suitable means required for the work as per approved drawing and specification complete with all cost as directed by Engineer-in-Charge. | |||||
| 8Providing & laying cement concrete conforming to M-25 grade in approved surface using 20 mm size and down graded black hard granite (crusher broken) chips and sharp sand of approved grading from approved quarry for CC work conforming to specification, mixing by concrete mixture including hoisting and laying concrete in position, compacting with concrete vibrator with all leads, lifts, delifts for mix concrete, royalty of all materials, cess including dewatering, curing for specified days by suitable means with supervision charges including mobilization and demobilization with cost of construction and dismantling of gangway and scaffolding, chute with all materials, construction of coffer dam / approach road, diversion road, site illumination, hire and running charges of machineries, dewatering by suitable means required for the work as per approved drawing and specification complete with all cost as directed by Engineer-in-Charge. | |||||
| 9 | Supplying, straightening, cutting, bending, binding and tying the grills using uncoated HYSD bars cutting, bending of designed diameters and placing in position for fabrication and fixing the reinforcement grills including laps, ties, providing chairs and welding whenever necessary with all leads, lifts and delifts with all labour, cess complete including cost, conveyance of steel and binding wires complete and as per the direction of Engineer-in-Charge. | - | One Qntl | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
DTCN.pdf
Tender Documents • 3.26 MB
BOQ_589994.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .