Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹7,546.59 (5.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
4 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Construction of Culvert Nallah Birindara near L/o Ab Gani at Chattergul A phase IST.Block Kangan.PRI.733.
2026_RDPR_317975_18
E NIT No. 68/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW GANDERBAL
₹3,000
12 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of JCB for Site Clearance and clearing Debris all Complete Job | 5 | Hrs | 1,200 | ₹6,000 |
| 2 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by EiC | 8.03 | cum | 256.85 | ₹2,062.51 |
| 3 | Providing and laying of dry stone solling hand packed including spreading , levelling all carriages. | 1.02 | cum | 1,000 | ₹1,020 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand :8 graded stone aggregate 20 mm nominal size) | 1.2 | cum | 5,202.9 | ₹6,243.48 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) | 11.89 | cum | 5,733.6 | ₹68,172.5 |
| 5.1 | Plums 20% | 2.97 | cum | 1,000 | ₹2,970 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:1.5:3 (1 cement : 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) | 2.25 | cum | 7,788.4 | ₹17,523.9 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, piers, abutments, pillars, posts and struts etc. for mass concrete Complete Job | 24.72 | sqm | 286.35 | ₹7,078.57 |
| 8 | Providing and laying in position TMT reinforement for RCC works including cutting bending and Placing | 211.3 | kg | 115.35 | ₹24,373.46 |
| 9 | Carriage of various materials by MT/HL for a lead of 15 km | 19.2 | cum | 340 | ₹6,528 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_1045047.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .