Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹3.0 L−₹36,600 (8.10%)Accepted-AOC 136 TRIMURTI NAGAR RATLAM | RATLAM | MADHYA PRADESH | 457001 | H3 | Accepted-AOC Lower rate quoted | |
| 2 | H1₹4.5 LRejected-Finance 13 790 | REWA | MADHYA PRADESH | 486001 | H1 | Rejected-Finance Higher rate quoted | |
| 3 | H2₹4.4 L−₹12,183 (2.70%)Rejected-Finance KEM NAGAR BABHUIYA RED SEVMI DISTT SEONI 480651 MP | 480651 | H2 | Rejected-Finance Higher rate quoted |
Tender Value
₹3.1 L
EMD Value
₹6,400
Closing Date
17 Mar 2025, 3:00 pmClosed
Executive Engineer
office of Executive Engineer T Dn MPPTCL Ratlam
SUPPLY FOR DRINKINGAND EATRH PIT WATER THROUGH PRIVATE TANKERS FROM DATED 15.03.2025 UP TO DATED 30.06.2025AT VARIOUS EHV SUBSTATION UNDER TESTING DIVISION MPPTCL RATLAM
2025_MPPTC_403356_1
2024-25/TS-08
Open Tender
Miscellaneous Services
Fixed-rate
120 days
EHV S/s Under Testing Dn. Ratlam
Please refer tender document enclosed
6 documents required · 6 mandatory
₹590
₹6,400
Yes
3 Apr 2025
18 Feb 2025
18 Mar 2025
18 Feb 2025
17 Mar 2025
18 Feb 2025
220KV Substation Ratlam :- 1.5 Tanker Par day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1.5 tanker per day = 161 tankers) Tanker Capacity @ 4000 liters
220KV Substation Jaora :- 1 Tanker per second day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per second day = 54 tankers) Tanker Capacity @ 4000 liters
220KV Substation Sailana :- 1 Tanker per Third day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per Third day = 36 tankers) Tanker Capacity @ 4000 liters
220KV Substation Daloda :- 1 Tanker Par day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per day = 107 tankers) Tanker Capacity @ 4000 liters
220KV Substation Nagra :- 1 Tanker Par day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per day = 107 tankers) Tanker Capacity @ 4000 liters
132KV Substation Sailana :- 1 Tanker per second day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per second day = 54 tankers) Tanker Capacity @ 4000 liters
132KV Substation Shivgarh :- 1 Tanker per second day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per second day = 54 tankers) Tanker Capacity @ 4000 liters
132KV Substation Tal :- 1 Tanker per second day Water Supply for the duration from dated 15.03.2025 to dated 30.06.2025. (Total =107 Days). (107 days x 1 tanker per second day = 54 tankers) Tanker Capacity @ 4000 liters
nitin KUMAR NEMA ELECTRICAL CONTRACTOR (BID ID -1216677)
Somya Construction (BID ID -1213229)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .