| # | Company | Rank | Status |
|---|---|---|---|
| 1 | Rejected-Technical 3 212 SEC H JANKIPURAM LUCKNOW LUCKNOW UTTAR PRADESH 226021 | LUCKNOW | UTTAR PRADESH | 226021 | - | Rejected-Technical Technically Disqualified |
| 2 | NILRejected-Finance | NIL | Rejected-Finance TECHNICAL ERROR OF CPP PORTAL. CASE IS RE-TENDERED |
| 3 | NILRejected-Finance | NIL | Rejected-Finance TECHNICAL ERROR OF CPP PORTAL. CASE IS RE-TENDERED |
Tender Value
Refer Docs
EMD Value
₹9.3 L
Closing Date
21 Jul 2023, 11:00 amClosed
BUH
Hindustan Urvarak and Rasayan Limited Admin Building HURL Campus PO Fertilizer Factory Gorakhpur UP 273007
Bi-Annual Rate Contract for Electrical Maintenance Jobs at HURL Gorakhpur Site
2023_HURL_759132_1
H/G/CnM/23-24/C-333/TE-558
Open Tender
AMC/ Maintenance Contracts
Tender cum Auction
730 days
HURL GORAKHPUR SITE
As per NIT of tender document
7 documents required · 7 mandatory
₹0
₹9.3 L
Yes
11 Sept 2023
23 Jun 2023
22 Jul 2023
23 Jun 2023
21 Jul 2023
23 Jun 2023
Amount
Part A : Various Electrical Maintenance Jobs
Preventive Maint of Motor ≤15kW
Preventive Maint of Motor 15kW< to ≤30KW
Preventive Maint of Motor30kW< to ≤100KW
Preventive Maint of Motor100kW< to ≤300k
PM OF 11KV Motor rating ≤1000kW
PM OF11KV Motor rating 1000kW<to ≤3000KW
BREAKDOWN Maint Motor rating ≤15kW
BREAKDOWN Maint Motor rating15kW<to≤30KW
BREAKDOWN Maint Motor 30kW<to≤100KW
BREAKDOWN Maint Motor 100kW< to ≤300KW
INSTALLATION/REMOVAL Motor up to ≤15kW
INSTALLATION/REMOVAL Motor 15kW< to ≤30K
INSTALLATION/REMOVAL Motor 30kW<to≤100KW
INSTALLATION/REMOVAL Motor100kW<to≤300KW
INSTALLTION/REMOVAL of 11KV motor≤1000KW
INSTALL/REMOV 11KV motor1000kW<to≤3000KW
Instal/Removal of MV Motor ≤500kW
Insta/Removal of MV Mtr 500kW<to≤1000kW
SHIFTING OF Motor/PNL/EQP. beyond 100 kg
SHIFTING OF Motor/PNL/EQP. Wt.500KG-3MT
SHIFTING OF Motor/PNL/EQP. More than 3MT
MAINTENANCE OF MV Motor ≤500kW
MAINT of 3.3KV Motor 500kW<to≤1000kW
Bearing Replacement of Motor ≤1.5kW
Bearing Rplcmnt of Motor 1.5< to ≤ 7.5kW
Bearing Rplcmnt of Motor 7.5 < to ≤ 30kW
Bearing Rplcmnt of Motor 30 < to ≤ 45kW
Bearing Rplcmnt of Motor 45 < to ≤ 75kW
Bearing Rplcmnt of Motor 75< to ≤ 90kW
Bearing Rplcmnt of Motor 90 < to ≤ 200kW
Bearing Rplcmnt of Motor 200 <to≤ 500KW
Bearing Rplcmnt of Motor 500kW<to≤1000KW
Greasing of Motor 30kW < to ≤ 45kW
Greasing of Motor 45kW < to ≤ 75kW
Greasing of Motor 75kW < to ≤ 90kW
Greasing of Motor 90kW < to ≤ 200kW
GREASING of 3.3 KV MV Motors
GREASING of 11kV Motors
PM of Generator System
PM of Generator Excitation System
PM of Generator system Control Panel
Gen Shaft earth maint & shaft V Msrmnt
Maintenance of Generator LAVT
PM Generator NGT system
Remove,terminate Pwr&Ctrl Cable LT Mtr
Maintenance of 11KV Switchboard panels
PM of 11KV Vacuum circuit breaker
Maintenance of 3.3KV SWITCHBOARD PANELS
PM of 3.3KV Vacuum circuit breaker
Maintenance of 415V LT Switchboard Panel
PM of 415V Air Circuit breakers (ACB)
Maintenance of MCC Pnls rating up to≤32A
Maintenance of MCC Pnls 32A<to≤63A
Maintenance of MCC Pnls 63A<to≤125A
Maintenance of MCC Pnls 125A<to≤250A
Maintenance of MCC Pnls 250A<to≤400A
Maintenance of MCC Pnls 400A<to≤630A
EREC & COMM OF FEEDER PILLER,250AMPS
EREC & COMM OF FEEDER PILLER,125AMPS
EREC & COMM OF FEEDER PILLER,63Amps
CAB.LAY-UNDER GROUND <= 21.5 MM OD
LT cable LAY under ground 22 to 50MM OD
LT cable LAY under ground 51 to 100MM OD
Cable Laying above Ground<=21.5MM OD
Cable Laying above Ground 22.5To50MM OD
Cable Laying above Ground 51 To 100MM OD
Cable Laying above Ground>100MM OD
Temporary cable laying OD upto 35 MM
Temporary cable laying OD > 35 MM- 55 MM
Temporary cable laying OD >55 MM - 75 MM
Temporary cable laying OD > 75 MM
Fabric &Erect CableTrayLaying>100to150mm
Fabric&Erect CableTrayLaying 150to250MM
Fabric&Erect CableTrayLaying>250 to450MM
Fabric&Erect CableTrayLaying Upto 100MM
Fabric&Erect CableTrayLaying >450to600mm
Fabric&Erect CableTrayLaying >600to750mm
Fabric&Erect LAD Tray Bend >600UPTO750MM
Fabric&Erect LAD Tray Bend >450UPTO600MM
Fabric&Erect LAD Tray Bend >150UPTO250MM
Fabric&Erect LAD Tray Bend>100UPTO150MM
Fabric&Erect LAD Tray Bend>75UPTO100MM
Fabric&Erect LAD Tray Bend UPTO 75MM
Excavation of earth for cable laying
BACK FILLING EXCAVATED EARTH
PVC/HDPE Pipe Laying F/cable<=75MM DIA
PVC/HDPE Pipe LayingF/cable>75To150MMDIA
PVC/HDPE Pipe Laying F/cable >150MM DIA
50 mm dia GI Pipe Laying
100 mm dia GI Pipe Laying
150 mm dia GI Pipe Laying
Supply & Fixing of GI Route Marker
INSTAL LT/HT CABLE ROUTE MARKER
End termination 3x2.5 sqmm cables Cu lug
End Termination 5x2.5 sqmm cables Cu lug
End Termination 7 x2.5 sqmm Cu lugs
End Termination10 x 2.5 sqmm Cu lugs
End Termination 12 x 2.5 sqmm Cu lugs
End Termination 14 x 2.5 sqmm Cu lugs
End Termination 16 x 2.5 sqmm Cu lugs
End Termination 19 x 2.5 sqmm Cu lugs
End Termination 3-1/2 x 25 sqmm
End Termination 3-1/2 x 35 sqmm
End Termination 3-1/2 x 50 sqmm
End Termination 3-1/2 x 70 sqmm
End Termination 3-1/2 x 95 sqmm
End Termination 3-1/2 x 120 sqmm
End Termination 3-1/2 x 150 sqmm
End Termination 3-1/2 x 185 sqmm
End Termination 3-1/2 x 240 sqmm
End Termination 3-1/2 x 300 sqmm
End Termination 3-1/2 x 400 sqmm
End Termination AL 3 X 4 Sqmm
End Termination AL 3 X 6 Sqmm
End Termination AL 3 x 10 sqmm
End Termination AL 3 x 16 sqmm
End Termination AL 3 x 25 sqmm
End Termination AL 3 x 35 sqmm
End Termination AL 3 x 50 sqmm
End Termination AL 3 x 70 sqmm
End Termination AL 3 x 95 sqmm
End Termination AL 3 x 120 sqmm
End Termination AL 3 x 150 sqmm
End Termination AL 3 x 185 sqmm
End Termination AL 3 x 225 sqmm
End Termination AL 3 x 240 sqmm
End Termination AL 3 x 300 sqmm
End Termination AL 3 x 400 sqmm
End Termination AL 4 X 4 Sqmm
End Termination AL 4 X 6 Sqmm
End Termination AL 4 x 10 sqmm
End Termination AL 4 x 16 sqmm
End Termination AL 4 x 25 sqmm
End Termination AL 4 x 35 sqmm
End Termination AL 4 x 50 sqmm
End Termination Cu 3 x 2.5 sqmm cables
End Termination Cu 5 x 2.5 sqmm cables
End Termination Cu 7 x 2.5 sqmm cables
End Termination Cu 10 x 2.5 sqmm cables
End Termination Cu 12 x 2.5 sqmm cable
End Termination Cu14 x 2.5 sqmm cables
End Termination Cu 16 x 2.5 sqmm cables
End Termination Cu 19 x 2.5 sqmm cables
End Termination Cu 3-1/2 x 25 sqmm cable
End Termination Cu 3-1/2 x 35 sqmm cable
End Termination Cu 3-1/2 x 50 sqmm cable
End Termination Cu 3-1/2 x 70 sqmm cable
End Termination Cu 3-1/2 x 95 sqmm cable
End Termination Cu 3-1/2 x120 sqmm cable
End Termination Cu 3-1/2 x150 sqmm cable
End Termination Cu 3-1/2 x185 sqmm cable
End Termination Cu 3-1/2 x225 sqmm cable
End Termination Cu 3-1/2 x240 sqmm cable
End Termination Cu 3-1/2 x300 sqmm cable
End Termination Cu 3-1/2 x400 sqmm cable
LT Straight through joint3/3.5/4x6 sqmm
LT Straight through joint3/3.5/4x10 sqmm
LT Straight through joint3/3.5/4 x16sqmm
LT Straight through joint3/3.5/4x25 sqmm
LT Straight through joint3/3.5/4x35 sqmm
LT Straight through joint 3/3.5/4x50sqmm
LT Straight through joint3/3.5/4x70 sqmm
LT Straight through joint3/3.5/4x95 sqmm
LT Straight through joint3/3.5/4x120sqmm
LT Straight through joint3/3.5/4x150sqmm
LT Straight through joint3/3.5/4x185sqmm
LT Straight through joint3/3.5/4x225sqmm
LT Straight through joint3/3.5/4x240sqmm
LT Straight through joint3/3.5/4x300sqmm
LT Straight through joint3/3.5/4x400sqmm
LT Straight through joint3/3.5/4x6 sqmm
LT Straight through joint3/3.5/4 x10sqmm
LT Straight through joint3/3.5/4x16 sqmm
LT Straight through joint3/3.5/4x25 sqmm
LT Straight through joint3/3.5/4x35 sqmm
LT Straight through joint3/3.5/4x50 sqmm
LT Straight through joint3/3.5/4x70 sqmm
LT Straight through joint3/3.5 /4x95sqmm
LT Straight through joint3/3.5/4x120sqmm
LT Straight through joint3/3.5/4x150sqmm
LT Straight through joint3/3.5/4x185sqmm
LT Straight through joint3/3.5/4x225sqmm
LT Straight through joint3/3.5/4x240sqmm
LT Straight through joint3/3.5/4x300sqmm
LT Straight through joint3/3.5/4x400sqmm
11KV HT Straight through joint3x185 sqmm
11KV HT Straight through joint3x240 sqmm
11KV HT Straight through joint3x300 sqmm
11KV HT Straight through joint3x400 sqmm
11KV HT Straight through joint1x500 sqmm
3.3KV HT Straight through joint3x185sqmm
3.3KV HT Straight through joint3x240sqmm
3.3KV HT Straight through joint3x300sqmm
11KV HT End Termination 3x150sqmm
11KV HT End Termination 3x185sqmm
11KV HT End Termination 3x240sqmm
11KV HT End Termination 3x300 sqmm
11KV HT End Termination 3x400 sqmm
11KV HT End Termination 1x500 sqmm
11KV HT End Termination 3x150 sqmm
11KV HT End Termination 3x185 sqmm
11KV HT End Termination 3x240 sqmm
11KV HT End Termination 3x400 sqmm
11KV HT End Termination 1 x 500 sqmm
6.6/3.3KV HT End Termination 3 x150 sqmm
6.6/3.3KV HT End Termination 3 x185 sqmm
6.6/3.3KV HT End Termination 3 x240 sqmm
6.6/3.3KV HT End Termination 3 x300 sqmm
6.6/3.3KV HT End Termination 3 x400 sqmm
11KV HT straight through 3 x150 sqmm
11KV HT straight through 3 x185 sqmm
11KV HT straight through 3 x240 sqmm
11KV HT straight through 3 x 300 sqmm
11KV HT straight through 3 x 400 sqmm
11KV HT straight through 1 x 500 sqmm
3.3KV HT straight through 3 x 150 sqmm
3.3KV HT straight through 3 x 185 sqmm
3.3KV HT straight through 3 x 240 sqmm
3.3KV HT straight through 3 x 300 sqmm
3.3KV HT End termination 3 x 150 sqmm
3.3KV HT End termination 3 x 185 sqmm
3.3KV HT End termination 3 x 240 sqmm
3.3KV HT End termination 3 x 300 sqmm
11KV HT End termination 3 x 150 sqmm
11KV HT End termination 3 x 185 sqmm
11KV HT End termination 3 x 240 sqmm
11KV HT End termination 3 x 300 sqmm
11KV HT End termination 3 x 400 sqmm
11KV HT End termination 1 x 500 sqmm
Providing Cu lug of 1.5 sqmm
Providing Cu lug of 2.5 sqmm
Providing Cu lug of 4 sqmm
Providing Cu lug of 6 sqmm
Providing Cu lug of 10 sqmm
Providing Cu lug of 16 sqmm
Providing Cu lug of 20 sqmm
Providing Cu lug of 25 sqmm
Providing Cu lug of 35 sqmm
Providing Cu lug of 50 sqmm
Providing Cu lug of 70 sqmm
Providing Cu lug of 95 sqmm
Providing Al lug of 6 sqmm
Providing Al lug of 10 sqmm
Providing Al lug of 16 sqmm
Providing Al lug of 25 sqmm
Providing Al lug of 35 sqmm
Providing Al lug of 50 sqmm
Providing Al lug of 70 sqmm
Providing Al lug of 95 sqmm
Providing Al lug of 120 sqmm
Providing Al lug of 150 sqmm
Providing Al lug of 185 sqmm
Providing Al lug of 240 sqmm
Providing Al lug of 300 sqmm
Providing Al lug of 400 sqmm
Providing Al lug of 500 sqmm
Providing cable glands 10.0 to 16.0 mm
Providing cable glands 16.5 to 18.0 mm
Providing cable glands 18.5 to 20.0 mm
Providing cable glands 20.5 to 23.0 mm
Providing cable glands 23.5 to 26.0 mm
Providing cable glands 26.5 to 30.0 mm
Providing cable glands 30.5 to 33.0 mm
Providing cable glands 33.5 to 37.0 mm
Providing cable glands 37.5 to 41.0 mm
Providing cable glands 41.5 to 46.0 mm
Providing cable glands 46.5 to 52.0 mm
Providing cable glands 52.5 to 60.0 mm
CT/PT replacement in 11KV HT Switchboard
CT/PT replacement in 3.3KV MVSwitchboard
CT/PT replacement in 415V LT Switchboard
Providing earthing with GI strip75X10 MM
Providing earthing with GI strip 75 X5MM
Providing earthing with GI strip 50 X6MM
Providing earthing with GI strip 40X 5MM
Providing earthing with GI strip 25 X5MM
Remove & terminate pwr & ctrl HT cable
Earthing 50 X 5 MM COPPER STRIP
6 SWG Earthing with bare GI wire
8 SWG Earthing with bare GI wire
10 SWG Earthing with bare GI wire
6 MM Earthing with GI wire rope
10 MM Earthing with GI wire rope
Earthing strt light poles with GI pipe
64 kg charcoal and 5 kg salt
PROVIDING AND FIXING OF GI WIRE
SUPPLY & FIXING OF CU STRIP EARTH BUS
Earth Pit value checking
Maintenance of Earth Pit
INSTALLATION OF EARTH PITS AS PER IS3043
SF6 gas filling in Breaker.
Tightness Clmp,Jmpr,strctr,bolts syrd
Attending oil leakage for CT, CVT syrd
Replacement CT/PT/ LA/ BPI/ syrd
Replacement of Breaker pole
Cleaning of grass Syd.
PM of Relay Pnl/Mtrng Pnl/RTCC Syd
Shutdown maint. syrd equipment
Maintenance of OLTC of Transformer
Lighting arrester maint. 132KV syrd
Rmvl and reconction of Trf bushing jmpr
Rmvl and reconction of Trf LV Side Cable
FILTRATION OF TRANSFORMER OIL:
Attend oil leak/filling/Filter TRF oil
PM/Replace buch/prv/mog/osr/temp gugTRF
Breather maint/replacement of TRF
maint. of Transformer
PM of Lighting transformer
PM Ele Hoist/Crane upto 3Ton
PM Ele Hoist/Crane upto 3#10Ton
PM Ele Hoist/Crane upto 10#15Ton
PM Ele Hoist/Crane upto 30Ton and above
PM of Distribution Board 115/240V ACDB
PM of Distribution Board 220V DCDB
PM of Distribution Board 415V MLDB
PM of feeder pillar box
PM of welding receptacle
Laying & Termination Telephone CAB-05P
Laying & Termination Telephone CAB-20P
Telephone installation/Removal
FO cable laying
FO cable termination/Splicing/Testing
LHS cable Laying for Fire Systems
Capacitor bank Maintenance
PM of Variable frequency drive
TEMP CONN.HYDROJETTING M/C.UPTO 200 KW
MONSOON PROT LCS/ GEARBOX/O/L>20-63A
Moonsoon Protn-Exd type power socket
Monsoon Protn-Exd type Light DB
Monsoon protection light JB
Monsoon protection Indust.Light DB
Monsoon protection indust.power socket
CHECK & RECTI.OF LIGHT CIRCUIT NON-HAZ
Check & Recti. of light circuit HAz-Area
Replace of LED/GLS/Floodlight/lamp/Fixtu
Replace LED/DC/GLSlamps Upto100W Fitting
Replace of 20/36/40/80W LED/fluor Tubes
Install LED/HPMV/HPSV/MS/LPS light fixt.
Repl of louver/Diffuser for LED/Fluo Fix
Install of High/M bay LED/Flu T-fixture
Repl of Cond/Starter/High/Medi bay fixtu
Removal of high/medium bay fixture
Replacement of Choke/Ballast/Tube fixtur
Replacement of CeilingFan Pin/RubberBush
Replace ofMis item-ceiling rose/holder
Repl of starter holder/lamp holder
Repl of protective cover for fittings
Replacement of Toggle switch
Repl of wiring of light/Point upto 6SQMM
Install of ELCB/MCB with connection
Removal of ELCB/MCB with connection
Install of Decorative lamp
Wiring using CSNG&CPNG/RIGID PVC CNDT
Install of flexible conduit (PVC)
Wiring using metallic Conduit
Removal of casing capping/Rigid conduit
Removal of ceiling fancomplte & wire
Removal of High Bay Fixture
Removal of Lighting Fixtures
Installation of Tube Light Fixture
REMOVAL OF EXHAUST FAN
Removal of Air circulator
Replace/Installation of MCB box
Removal of ceiling/wall mounted Fan
CONCEALED WIRING WITH 2.5 MM2 PVC WIRE
Installation of ceiling/wall mount fan
Installation of air circulator
Install of Exhaust fan with wall opening
Relpace/Install of 5/6A Swit/Sock/Plug
Replace/Install of16/32/63ASwit/sock/Plu
Replacement/Installation of timers
Making wall opening for exhaust fan
Installation of 1Ph energy Meter
Install&Wiring of1-Ph voltage stabilizer
Installation of 3-Ph energy Meter
Installation of Anchor fastners
Install of 3PH-E switch/welding socket
Replace of TPN isolator Non-MCB,125Amps
Replace of TPN isolator Non-MCB,63Amps
Replacement of TPN isolator MCB type
Installation of Power distribution board
Install of rod/spike type lightning cond
Install of Ind.Typ Push button STN-NFLP
Install of Ind.Typ Push button STN-FLP
Temporary conn of dewatering pump
Replac of TPN isolator Non-MCB,250 Amps
Replac of TPN isolator Non-MCB,400 Amps
Replac of TPN isolator Non-MCB,630 Amps
REM of Indust.Typ Push button STN-FLP
REM of Indust.Typ Push button STN-NFLP
Remove temp.connect of dewatering pump
dewatering of cable trench/Pit
INS.INT JN BOX>400X400&<600X600MM NFP/FP
INST.INTJNBox>200x200& <400x400MM NFP/FP
INST interm JN Box<=200x200MM NFP/FP
PM of FLP TPN welding socket upto 63Amps
PM of NFLP TPN welding socket upto 63Amp
INSTL-FUSE BASE WITH TOP 16 AMPS
INSTL-FUSE BASE WITH TOP 32 AMPS
INSTL-FUSE BASE WITH TOP 63 AMPS
INSTALLATION OF MCP
INST 3/6KEY LOUDOPH POINTS
INST.SMOKE/HEAT DETECTOR
TESTING OF MCP FOR HEALTHINESS
INST OF LOCAL CONTROL STATION
INST-CHECKER PLATE FOR COVER TRENC
ARTISTIC LETTER / PAINTING BOARDS
letter writing:single letter of 1in size
letter writing:single letter of 2in size
letter writing:single letter of 3in size
Cutting in running meters
Welding in running meters
Part B : Supply of contract Manpower
Service charge for unskill manpower
Service charge for skill manpower
Service charge for semi skill manpower
Service charge for highly skill manpower
Bidder Name
Amount in Words
Pace Process Controls Pvt Ltd
POWERTECH ENGINEERS
Pace Process Controls Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .