Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Attached | |
| 2 | L2₹5.7 L+₹80,790.62 (16.6%)Accepted-Finance VILL MAMEL PO TEH KARSOG DISTRICT SOLAN HP | L2 | Accepted-Finance Attached | |
| 3 | L3₹5.8 L+₹89,968.42 (18.4%)Accepted-Finance BADIYAR A PO NANDPUR TEHSIL JUBBAL DISTT SHIMLA H P | JUBBAL | SHIMLA | HIMACHAL PRADESH | L3 | Accepted-Finance Attached | |
| 4 | L4₹6.4 L+₹1.5 L (31.6%)Accepted-Finance | L4 | Accepted-Finance Attached | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Physical documents not received. |
| Sl No | Description | Qty | Unit | Akash Thakur L3 | HARI KUMAR GOVT CONT L1 | DAYA NAND L4 | ABHINAV KAUSHAL GOVT CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation for foundation of structures as per drawing and technical specification Clause-305.1 including settingout, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 98 | Cum | 233 ₹22,834 | 110 ₹10,780 Lowest | 320 ₹31,360 | 250 ₹24,500 |
| 2.00 | Providing and laying in position cement concrete of specifiedgrade excluding the cost of centering and shuttering- All work up to plinth level. 1:2:4 (1 cement: 2 sand: 4 graded aggregate 20 mm nominal size) | 46.7 | Cum | 6,000 ₹2,80,200 Lowest | 6,900 ₹3,22,230 | 7,050 ₹3,29,235 | 6,200 ₹2,89,540 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,395.66 | Kg | 92 ₹1,28,400.72 | 60 ₹83,739.6 Lowest | 95 ₹1,32,587.7 | 92 ₹1,28,400.72 |
| 4.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 526.7 | Kg | 114 ₹60,043.8 | 115 ₹60,570.5 | 115 ₹60,570.5 | 100 ₹52,670 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 210 | Sqm | 411 ₹86,310 | 50 ₹10,500 Lowest | 420 ₹88,200 | 350 ₹73,500 |
Tender Value
₹6.3 L
Closing Date
21 Oct 2025, 4:00 pmClosed
Secretary
NP Karsog
C/o U shape drain from Co-operative Bank to Dachhain road in Km 0/00 to 0/200 Km
2025_UDDHP_117695_5
NP/Karsog/2025-757-762
Open Tender
Civil Works
Item Rate
60 days
Karsog
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Secretary
Exempted
4 Nov 2025
14 Oct 2025
22 Oct 2025
14 Oct 2025
21 Oct 2025
14 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_172153.xls
BOQ • 0.31 MB
Tendernotice.pdf
Tender Documents • 1.52 MB
SBD.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .