| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.7 CrAccepted-AOC | ₹90.7 Cr Quoted ₹90.8 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹107.6 CrRejected-AOC | ₹107.6 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹87.1 Cr
EMD Value
₹1.8 Cr
Closing Date
15 Jul 2020, 5:00 pmClosed
DGM (M and U-Yamuna Valley)
UJVN LTD,Hydel Colony,Dhalipur Distt Dehradun
Renovation, Modernization and Up-gradation of Dhakrani HEP (3X11.25 MW)
2019_UJVN_20384_1
01/DGM(M andU- YV)/2019-20
Open Tender
Machineries/ Mechanical Engg Items
1582 days
Dhakrani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1.2 L
UJVN LTD
₹1.8 Cr
Dehradun
9 Sept 2021
16 Sept 2019
20 Jul 2020
16 Sept 2019
15 Jul 2020
16 Sept 2019
10 Oct 2019
Amount
SCHEDULE 1 - NEW SUPPLIES INCLUDING MANDATORY SPARE PARTS AND T&P
Turbine (As per Section 8 )
Lower ring guide vane self-lubricated bushes
Top cover complete in all respect as per clause 1.3.1(6)
Top cover drainage Pumps complete in all respect as per clause 1.3.1 (7)
Guide vanes
Regulating Ring with its pin
Guide vane Servomotor, Lever, Links, pins and Spacers, bush housing, self lubricating bushes & sliding guides for all locations including bolting materials and fastener appruntenances complete in all respect
Runner & its operating Mechanism complete in all respect as per clause 1.3.1 (9)
Turbine shaft glands & its cooling system as per clause 1.3.1(10) complete in all respect.
Runner Oil head assembly and its associated parts.
Turbine guide bearings as per clause 1.3.1(12)
Thrust bearing as per clause 1.3.1(13)
Turbine-Generator Common Shaft along with fasteners for coupling
Lighting, Ventilation equipment & Thermal insulation piping of Turbine Pit
Turbine Gauge panel.
Monitoring systen complete in all respect as per clause 1.3.1(16)
Mobile oil handling set for oil filtration and conditioning complete in all respect.
Spiral casing drain valve and associated parts.
Draft tube drain valve and associated parts.
Draft Tube Liner
Paint material for spiral casing ,Draft tube & draft tube gates etc. (for all three units)
Ultrasonic on-line flow measurement system with transducers/sensors and accessories for monitoring and data acquisition and integration of the system with plant SCADA system
Special spare parts as per clause 1.6.2 (a)
Special spare parts as per clause 1.6.2 (b)
Hydraulic torque tensioner with power pack for runner/turbine shaft coupling bolts.
Hydraulic torque tensioner with power pack for turbine shaft/ generator shaft flange coupling bolts.
Special handling devices and fixtures for turbine components.
Draft tube inspection & maintenance platform (removable)
All special tools and instruments, required for assembly, disassembly, maintenance and handling of the equipment.
Templates for the Kaplan runner blade profiles
Templates for the Guide Vane profiles
Manual noise measuring instrument
Governors (As per Section 8 )
Digital Electronic Controller complete in all respect
Hydraulic Actuator complete in all respect
Oil Pumping Unit complete in all respect
Miscellaneous Components and Auxiliary Systems complete in all respect
Control, Monitoring and Related items and Services complete in all respect
Special spare parts as per clause 2.16
Mechanical/ hydraulic over speed protection device.
Control/Starter Panels for auxiliaries
Coordination and supply of associated interfaces, provision of necessary contacts and/ports for integration of generators, accessories and monitoring systems with plant SCADA system including all hardware, software, services and other inputs
Water level transmitter and indicator/ recording instruments (compatible with ACS) in headrace and tailrace side along with required panels Consumables. Any other item not specified above but necessary to complete the assembly.
Compressed Air System (As per Section 8 )
LP compressed air system complete in all respect as per clause 3.2.2
Special Spares Parts as per clause 3.9
Special tools and maintenance equipment for repair and maintenance of the HP & LP Compressed air system
Cooling Water System (As per Section 8 )
Cooling Water System complete in all respect as per Clause 4.2.1
Special Spare parts as per clause 4.5.2
Drainage & dewatering System (As per Section 8 )
Darinage and Dewatering system complete in all respect as per clause 5.2.1
Special Spare parts as per Clause 5.5.2
Generators (As per Section -9 )
Stator Core & punching
Stator Winding
Field windings
Slip ring compartments, slip rings with brush gears
Pole bodies and Pole fixing
Carbon dust exhaust systems
Guide Bearing system
Air cooling systems
Brake and jacking system
Brake ring
Space heaters including LCB with local/remote, manual/ automatic control features; interface to ACS
Monitoring and protection systems
Generator monitoring and interface cubicles (LCB)
Special Spare parts as per clause 1.5.2
All special tools and instruments, required for assembly, disassembly, maintenance and handling of the equipment.
Excitation system (As per Section -9 )
Excitation systems with cast resin dry type excitation transformers
Laptop for testing, commissioning and setting of parameters
Special spare parts as per clause 2.5.2
Generator Termination Equipment (As per Section -9 )
Neutral grounding cubicles complete with neutral grounding transformers, current limiting resistor, disconnecting switch etc.
Branch – off and CT for connecting the excitation transformers
Branch – off and CT for connecting the unit auxiliary transformers
Line side current transformers
Neutral side current transformers
Voltage transformers
Surge protection equipment
Special spare parts as per clause 3.5.2
Main Step-up Transformers (As per Section -10 )
Generator Transformer 11/132 kV, 50 Hz, 15 MVA complete in all respects.
Lightning protection system for Main Step-up Transformers comprising of lightning protection conductors, lightning masts with peaks, lightning arrestors, grounding flat connectors etc.
Special spare parts as per clause 1.35
MV/LV Auxiliary Transformers (As per Section -10 )
Unit Auxiliary Transformers 500 kVA, 11/0.4 kV/kV
Station Service Transformers 500 kVA, 11/0.4 kV/kV
Inter Bus Transformer 3 MVA 33/11kV/kV
Special spare parts as per clause 2.5.2
LV Auxiliary Supply System (As per Section -10 )
Station service board (SSB)
Unit auxiliary boards (UAB)
Fore bay / intake distribution board
Switchyard 132 kV distribution board
Erection bay distribution board
Workshop distribution board
Special spare parts as per clause 3.5.2
HV SWITCHYARD 132 KV (As per Section -11 )
Single Phase, 4-core, 145 kV, Capacitive Voltage Transformers of 0.2 class
Single Phase, 4-core, 145 kV, Current Transformers of 0.2 class
132 kV, 3 phase Bus type Isolators without earthing switch on existing steel supporting structure:
132 kV, 3 phase Line type Isolators with earthing switch on existing steel supporting structure:
Portable type test kit for surge arrestors complete with all accessories.
MV Switchgear 11 kV (As per Section -11)
Incomer Panel with VCB type circuit breaker, 3 phase PT and all other equipment and instruments etc., as per Specifications
Feeder Panel including spare, with VCB type circuit breaker and all other equipment and instruments etc., as per Specifications
Bus coupler Panel with VCB type circuit breaker and all other equipment and instruments etc., as per Specifications
Emergency Diesel Generating Set (As per Section -12)
Diesel Generating Unit (DG Unit), rated for 250 kVA output (under site conditions), 0.415 kV, 0.8 p.f., 1500 rpm; complete with radiators, exhaust silencers, 24 V battery starting system, base frame with anti vibration dampers etc.
Related auxiliary plant to provide complete, ready for service installation.
Engine starting system (Automatic Main failure starting system Panel) for DG set
Panel for generator having state of the art control and protection complete with numerical relays, digital meters and switches etc.
Storage tank for DG set, minimum of 990 litres with fuel system including fuel.
Sound proofing enclosures and other system, one for each DG set
Special spare parts and tools as per clause 1.12
DC Auxiliary Supply System & UPS Systems (As per Section -12)
110 V DC system with two flooded type tubular Lead acid 300 Ah or higher capacity battery banks and associated racks.
Battery chargers 415 V AC/110 V DC, suitable for 110 V, 300 Ah flooded type tubular lead acid batteries.
DC main switchboard.
DC sub-distribution boards
48 Volt DC/DC converters.
Uninterrupted Power Supply system, 110 V DC/240-415 V AC 50 Hz, 15 kVA connected to the 110 V DC distribution board.
UPS switchboards.
Special devices, tools, maintenance equipment etc. required for installation, testing commissioning & maintenance of the batteries, chargers and distribution systems.
Eye wash station, Safety showers, Protective gloves, and aprons for handling the batteries.
Any other items not specified above but are necessary for satisfactory operation of 110 V D.C. systems.
Special spare parts as per clause 2.12
Special Tools and Appliances as per clause 2.13
Lighting and small power Installations (As per Section -12)
Lighting items as per clause 3.2.1
Special spare parts as per clause 3.6.1
MV, LV and Control Cable System (As per Section -12)
6.35/11 kV, 3x25 mm², XLPE insulated, Aluminium conductor MV cable including all accessories.
6.35/11 kV, 3x95 mm², XLPE insulated, Aluminium conductor MV cable including all accessories.
11 kV, 1x1000 mm², XLPE insulated, Aluminium conductor MV cable including all accessories.
1.1 kV, 3.5x95 mm², XLPE insulated, Aluminium conductor LV cable including all accessories.
1.1 kV, 3.5x70 mm², XLPE insulated, Aluminium conductor LV cable including all accessories.
1.1 kV, 3.5x25 mm², XLPE insulated, Aluminium conductor LV cable including all accessories.
1.1 kV, 3.5x6 mm², XLPE insulated, Aluminium conductor LV cable including all accessories.
1.5 mm² x 4 core Armoured control cables, including all accessories
1.5 mm² x 8 core Armoured control cables, including all accessories
1.5 mm² x 12 core Armoured control cables, including all accessories
1.5 mm² x 16 core Armoured control cables, including all accessories
1.5 mm² x 4 core Unarmoured control cables including all accessories
1.5 mm² x 8 core Unarmoured control cables including all accessories
1.5 mm² x 12 core Unarmoured control cables including all accessories
1.5 mm² x 16 core Unarmoured control cables including all accessories
6 mm² x 2 core armoured control cable including all accessories
6 mm² x 4 core armoured control cables including all accessories
6 mm² x 4 core unarmoured control cables including all accessories
LV power cable (As per Cl. No. 4.4 LV Power Cables)
Fire Protection System (As per Section -12)
Fire Protection items as per clause 5.2
Special spare parts as per clause 5.4.7(a)
Special spare parts as per clause 5.7.7(a)
HVAC systems (As per Section -12)
Exhaust fans with explosion proof motor and of size 24”, 4,600 m3 /h for the battery room in the power house.
Thermometer to indicate maximum & minimum temperature
Pigeon Guard & Bird Repellent Moving Eyes (As per Section -12)
Supply as clause No. 7.2.1
Special spare parts as per clause 7.6.2
Electrical Protection Systems (As per Section -13)
Unit protection systems to provide the complete range of electrical protection for the generators, busbar/cable systems and main transformers
Protection systems to provide the complete range of electrical protection for the 132/33 kV 40 MVA transformers
protection system for the 132 kV busbar systems
protection systems for the 33/11 kV 3000 kVA transformers
Protection systems for UAT 11/0.4 kV 500 kVA
Protection systems for SST 11/0.4 kV 500 kVA
Protection systems for DG sets 250 kVA
Special spare parts as per clause 1.7.2
Special tools and appliances as per clause 1.7.4
Earthing and Lightning Protection Systems (As per section -13)
Main grid conductor
Risers
Ground rods, as per Specifications
SCADA Systems (As per section -14)
SCADA items as per clause 1.2.1
OPGW Cable as per clause 1.2.2
Special spare parts as per clause 1.13
Electrical Workshop (As per Section -15)
Work benches, tool cabinets and chairs
Tool machines and electrical portable tools
Standard tools for electrical and mechanical fitters
Instruments and appliances
Power House EOT Crane (As per Section -16)
Hoist wire ropes with clamps of main and auxiliary hoists
Wireless remote control
Safety cage for access ladder
Chequered Plates
Special Spare parts as per clause 1.5.2
Any other item not specifcally covered under this schedule but mentioned in the specifications
Intake Trash Racks & TRCM (As per Section -17)
Providing of new forebay water level and head loss measuring equipment complete with transducers, outdoor type IP 66 protected LCB with interface to ACS of the Power station.
Provide new standard cable (or hydraulically) operated TRCM with automatic cable reeling drum and movable trash collecting containers for installed trash racks of power house intake including new rail track. TRCM shall be equipped with a jib-type revolving hoist for grabbing the floating debris.
Replace grating covers by chequered steel plates
Provide portable Fire-fighting equipment
Special spare parts as per clause 2.5.2
Intake Emergency Gate (As per Section -17)
Emergency gate (in 4 nos. elements) including fill-in valves
Rubber seals with clamping bars and fasteners
New automatic lifting beam
Complete control system including limit switches, cables and control cabinets by modern equipment (IP 66 outdoor type protection).
Drive unit motor and brake
New wire rope drum, wire rope and clamps
Automatic cable reeling drum
Fire fighting equipment
Special spare parts as per clause 3.5.2
Intake Gates (As per Section -17)
Rubber seals with clamp bars, bushes of pulley and fasteners
Wire ropes, rope drum with clamps for hoist
Hoist motors and brakes
Providing of outdoor type IP66 protected LCB with interface to ACS of power station complete with all internal LV power and signal cabling to LCB.
Hand rails and associated parts of Hoist structures
Gate position indicator with limit switches
Special Spare parts as per clause 4.5.2
Bypass Gates (As per Section -17)
Rubber seals (Bottom and sides) with fasteners
Protection covers with grating panels, Sprocket chains, bearings, sprocket wheel, links, intermediate and hinge studs, sluice and drain valves
Special Spare parts as per clause 5.5.2
Penstocks (As per Section -17)
New flow metering and pressure measuring equipment for each turbine complete with IP 66 protected local LCB with interface to ACS of the power station, including all internal LV power and signal cabling.
O-ring seals for manhole
Special Spare parts as per clause 6.5.2
Draft Tube Gates (As per Section -17)
Complete two draft tube gates (for one unit)
Rubber seals with clamp bars and fasteners of gates
New tail water level measuring equipment complete with transducer, outdoor type IP 66 protected LCB with interface to ACS of the power station.
Hoist drive unit components (motor, brakes etc), wire rope with clamps
Complete control system (IP66 protected outdoor type) and providing gate position indicator with limit switches and cabling. Provide portable fire fighting equipment
Skin plate
Weather protection cover for Hoist rope drum.
Wireless remote control
Automotic lifting beam
Portable fire fighting equipment
Special Spare parts as per clause 7.5.2
SCHEDULE 2 - ITEMS TO BE REPAIRED
Repair works of Turbine (As per Section -8)
Spiral case & Stay ring.
Draft Tube
Turbine Pit
Runner throat ring
Lower ring
Repair works of Generator (As per Section -9)
Generator Housings
Stator Frame
Hub, Shaft alignment
Generator Pit lighting system
DC Auxiliary Supply System & UPS Systems (As per Section -12)
Refurbishment of existing DC Main switchboard
Any other item not specifcally covered under this schedule but mentioned in the specifications
Power House EOT Crane (As per Section -16)
Overhauling of all reduction gear boxes and brakes
Refurbishment of long travel and cross travel limit switches, motor protection system and interlocking system
All motors shall be checked for their actual insulation properties. The motor protection and the interlocking system shall be checked.
Intake Trash Rack & TRCM (As per Section -17)
Remedial works of embedded frame and trash racks
Rectification of under water parts
Intake Emergency Gate (As per Section -17)
Rectification of embedded parts under water
Overhauling of pulley assembly, reduction gear boxes and brakes for both long travel drive and hoist.
Refurbishment of Intake emergency gate’s pocket (i.e. embedded part) of all three units.
Intake Gates (As per Section -17)
Overhauling of gate wheel assemblies and pulleys
Overhauling of bypass valve & pipe arrangement.
Overhauling of hoist reduction gear boxes and brakes
Repairing of hoist platform chequered plates and other corroded parts
Rectification of under water parts
Bypass Gates (As per Section -17)
Overhaul complete gate operating mechanism including its Couter weight and chamber
Draft Tube Gates (As per Section -17)
Refurbishment of guide shoes, sliding flats, dogging and lifting attachments, all three draft tube gate pockets
Overhauling of reduction gear boxes and brakes, long travel drive and crane wheels
Rectification of under water parts
SCHEDULE 3 - DISMANTLING, INSTALLATION, COMMISSIONING AND OTHER SERVICES
Services related to Reverse Engineering, Quality Checks of Units and other equipment.
Turbine (As per Section -8 )
Model Test
Site tests before dismantling
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services of Clean water system
Governors (As per Section -8 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Compressed Air System (As per Section -8 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Cooling Water System as per section 8
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Drainage & dewatering System as per section 8
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Generators (As per Section -9 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Excitation system (As per Section -9 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Generator Termination Equipment (As per Section -9 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Main Step-up Transformers (As per Section -10 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
MV/LV Auxiliary Transformers (As per Section -10 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services (500kVA transformer)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services (3000kVA inter bus transformer).
Cleaning of cable trenches and cable supports as existing inside the trenches in power house, switchyard and other areas
LV Auxiliary Supply System (As per Section -10 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
HV Switchyard 132 KV (As per Section -11 )
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
MV Switchgear 11 kV (As per Section -11)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Emergency Diesel Generating Set (As per Section -12)
Installation, Testing, Commissioning and Other Services.
DC Auxiliary Supply System & UPS Systems (As per Section -12)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Lighting and small power Installations (As per Section -12)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Installation, Testing, Commissioning of Flood light with tower and earthing complete in all respect.
MV, LV and Control Cable System (As per Section -12)
Disconnection and removal from site of MV, LV and control cables of all sizes, shifting of removed cables to stores, supply erection testing and commissioning of all cables including all assesiories.
Cleaning of cable trenches and cable supports as existing inside the trenches in power house, switchyard and other areas.
Cleaning of entire cable rack system
Replacement of broken / bent or missing cable supports and cable racks of different sizes
Painting of cable racks and cable supports, as per Specifications
Fire Protection System (As per Section -12)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
HVAC systems (As per Section -12)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services
Pigeon Guard & Bird Repellent Moving Eyes (As per Section -12)
Installation, Testing, Commissioning and Other Services
Electrical Protection Systems (As per Section -13)
Dismantling, removal, stacking and storing of unused material at site/store of UJVNL and all miscellaneous repairs and work, re-assembly, Installation, Testing, Commissioning and Other Services as per clause 1.2
Earthing and Lightning Protection Systems (As per Section -13)
Work of laying of Ground mats in Switchyard and GT area consisting of:
Excavation and refilling of trenches for main grid conductor
Laying of main grid conductor including welding of sections, as required
Laying of risers including welding/ interconnection at both ends
Erection of ground rods including digging and refilling of pits, as per Specifications
Work of laying of ground mat in Power house area for interconnection of digital equipment including inter-connectors and all types of conductors, ground rods, risers etc. as required
Testing and commissioning of complete earthing system
SCADA Systems (As per section -14)
Installation, Testing, Commissioning and Other Services
Communication Link between Dhakrani HEP to Dhalipur HEP through OPGW cable
Communication Link between Dhakrani HEP to Dakpathar Barrage through OPGW cable
Electrical Workshop (As per Section -15)
Installation, Testing, Commissioning and Other Services
Power House EOT Crane (As per Section -16)
Replace hoist wire ropes with clamps of main and auxiliary hoists and gaskets
Operational testing of refurbishment parts and its components after completion of rectification work.
Painting of Crane
Any other item not specifically covered above but mentioned in the specifications.
Intake Trash Racks & TRCM (As per Section -17)
Installation, testing, commissioning of TRCM in line with the design of the installed trash racks
Installation, testing, commissioning of new forebay water level and head loss measuring equipment complete with transducers, outdoor type IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station
Field sand blasting and painting of trash racks and frames
Paint embedded parts above water
Replacement of grating covers by chequered steel plates
Intake Emergency Gate (As per Section -17)
Paint embedded parts above water
Installation, testing, commissioning of one (1) set of new emergency gate (in 4 nos. elements) including fill-in valves in top element
Replacement of automatic cable reeling drum, rope drum along with wire ropes and clamps, damaged crane wheel, drive unit motor, brake and other hoist structure parts
Installation, testing, commissioning of complete control system including limit switches, cables and control cabinets by modern equipment (IP 66 outdoor type protection)
Painting of gantry structure
Intake Gates (As per Section -17)
Painting of embedded parts
Field sand blasting and painting of gates
Replacement of rubber seals with clamp bars and fasteners
Replacement of motors, brakes, wire ropes, rope drum including clamps of hoist
Replace damaged hand rails and corroded parts of the hoist structure.The hoists platform chequered plates shall be welded by continuous welds in order to prevent accidents
Testing, commissioning of all gates position indicator with limit switches, outdoor type IP 66 protected local control board (LCB) with interface to the automatic control system (ACS) of power station complete with all internal LV power and signal cabling to LCB
Bypass Gates (As per Section -17)
Replacement of rubber seals (Bottom and sides) with fasteners and damaged hand rails
Field sand blasting and painting of gates and cleaning of exposed portion of embedded side plates by buffing
Replacement of all protection covers with grating panels and complete chains
Overhauling of total operating system and painting of structural portion
Supply and replacement of Hand Rails
Penstocks (As per Section -17)
Field sand blasting and complete painting (Primer & Finish) of inside and outside surfaces (exposed) including all arrangements for completion of work.
Replacement of O-ring seals for manhole
Testing, commissioning of new flow metering and pressure measuring equipment for each turbine complete with IP 66 protected local control board (LCB) with interface to automatic control system (ACS) of the power station, including all internal LV power and signal cabling.
Draft Tube Gates (As per Section -17)
Installation, Testing and Commissioning of draft tube gate for one unit (i.e. two new draft tube gate panels)
Installation, Testing and Commissioning of new lifting beam
Field sand blasting and painting of gates
Painting of embedded parts
Replacement of Hoist wire rope with clamps and other drive unit components
Fabrication & installation of weather protection cover for hoist rope drum.
Painting of gantry structure
Replacement of complete control system (IP66 protected outdoor type) and providing gate position indicator with limit switches and cabling
Description of Work / Item(s)
Amount
SCHEDULE 4 - RECOMMENDED SPARE PARTS
List to be enclosed with the technical bid (breakup of each recommended spare must be provided in terms of percentage of the lumpsum amount to be quoted here in the technical offer)
Description of Work / Item(s)
Amount
SCHEDULE 6 - COST OF WITHDRAWL FOR DEVITAION FROM “TECHNICAL SPECIFICATION”
List to be enclosed with the technical bid( breakup of each technical deviation must be provided in terms of percentage of the lumpsum amount to be quoted here in the technical offer)
Description of Work / Item(s)
Amount
SCHEDULE 7 - COST OF WITHDRAWL FOR DEVITAION FROM “SPECIAL CONDITIONS OF CONTRACT”
List to be enclosed with the technical bid (breakup of each deviation from special conditions of contract must be provided in terms of percentage of the lumpsum amount to be quoted here in the technical offer)
Charit Bholowalia
Flovel Energy Private Limited
Flovel Energy Private Limited
Flovel Energy Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid