Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹9.5 CrAccepted-Finance | H1 | Accepted-Finance Rank 1 | |
| 2 | H2₹10.8 Cr+₹1.3 Cr (13.9%)Accepted-Finance | H2 | Accepted-Finance Rank 2 | |
| 3 | H3₹15.2 Cr+₹5.7 Cr (59.5%)Accepted-Finance 1ST FLOOR YMCA CULTURAL CENTER CUM LIBRARY BUILDING 1 JAI SINGH ROAD NEW DELHI 110001 INDIA | NEW DELHI | NEW DELHI | DELHI | 110001 | H3 | Accepted-Finance Rank 3 | |
| 4 | H4₹11.5 Cr+₹2.0 Cr (20.5%)Accepted-Finance | H4 | Accepted-Finance Rank 4 | |
| 5 | H5₹14.1 Cr+₹4.5 Cr (47.6%)Accepted-Finance | H5 | Accepted-Finance Rank 5 |
Tender Value
Refer Docs
Closing Date
21 Mar 2022, 11:00 amClosed
Pradeep Kumar Shakya
Chief Engineer cum Regional Office, MoRTH, Kendriya Sadan, Sector 9A, Chandigarh.
Consultancy services for Authoritys Engineer for Supervision of REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102.000 TO KM 134.950 (DESIGN CHAINAGE KM 90.150 TO KM 116.980) (PACKAGE -V) INCLUDING CONSTRUCTIO
2021_MoRTH_662235_1
RW/CH/W(52)/JK/2021
Open Tender
Civil Works - Highways
Item Rate
2555 days
NAUSHERA TUNNEL Akhnoor Poonch road
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
RPAO MoRTH Chandigarh
Exempted
MoRTH Sector 9A Chandigarh
30 Jun 2022
9 Dec 2021
22 Mar 2022
9 Dec 2021
21 Mar 2022
22 Dec 2021
10 Dec 2021 - 3 Jan 2022
3 Jan 2022
Amount
Remuneration for Professional Staff (inclusive of per Diem allowance)
Team Leader cum Senior Highway Expert
Resident cum Highway Engineer
Resident cum Tunnel Excavation Expert
Bridge Engineer
Tunnel Design Engineer
Senior Quality cum Material Expert
Road Safety Expert
Senior Geotechnical Expert
Sub-Professional Staff
Survey Engineer
Assistant Highway Engineer
CAD Expert
Environmental Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer
Electrical Engineer
Tunnel Excavation Engineer
Quantity Surveyor
Geologist
Tunnel ventilation cum Excavation expert
Support Staff (inclusive of per diem allowance)
Office Manager
Accountant cum Cashier (01 No.)
Steno cum Computer Operator (01 No.)
Office Boy
Transportation (Fixed Costs)
Innova or equivalent not more than 2 years old) (1*24 (Construction Period) + 1*12 (DLP)) =36 Rate per month
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (ConstructionPeriod))
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period) + 1*60 (DLP)) =84 months Rate per month
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff.
The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 80 round trip per key personnel to Employer’s Head Office or 2 working days (including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete).
Office Rent (Fixed Costs) Minimum200 sq m area of office shall be rented The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
During Construction period (Minimum Area 200 sqm; 1*24)
During Maintenance /DLP period (Minimum Area 50 sqm; 1*60)
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies (1*24+1*60)=84
Drafting Supplies (1*24+1*60)=84
Computer Running Costs (1*24+1*60)=84
Domestic and International Communication (1*24+1*60)=84
The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external &10 internal lines), photo copier (15ppm,12000 copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, preloaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc
During Construction period
During Maintenance /DLP period
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment, Rate per Km
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Road signs inspection using Retro Reflectometer
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
Centro de Estudios de Materiales y Control de Obra, SA.
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Hexa Co.
RODIC CONSULTANTS PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .