Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | ₹9.1 L | L1 | Accepted-Finance Due to lowest rate |
| 2 | L2₹9.3 L+₹15,000 (1.65%)Rejected-Finance VILLAGE PO NAGANPATT TEHSIL D SALA DISTT KANGRA HP | ₹9.3 L+₹15,000 (1.65%) | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹9.3 L+₹25,000 (2.75%)Rejected-Finance VILLAGE DHUNDHIYARA P O BELLI TEHSIL DALHOUSIE DISTT CHAMBA HP | ₹9.3 L+₹25,000 (2.75%) | L3 | Rejected-Finance Due to highest rate |
| Sl No | Description | Qty | Unit | M/S POLLY PHASE NEW ENGINEERING L1 | SIKANDER KUMAR L2 | ANITA KUMARI L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of water supply scheme as a whole including cost of all labour to be deployed i.e. Pump Operator, Chowkidar, Beldar, Fitter or any other skilled/un-skilled labour contigent to the work, watch and ward of all departmental assets, treatment of water as per manual of CPHEEO/IS code and specification, maintenance of source, regarding running of pumping machinery. The job shall include cost of all major, minor repairs of pumping machinery and electrical installation such as rewinding of motors, lubrication, replacement of impeller,Kit kat, HRC fuses gland dori and other essential items required etc. required for repair during the sudden shut down of pumping machinery as per direction of Engineer-in-charge. | 1 | Job | 7,90,000 ₹7,90,000 Lowest | 8,00,000 ₹8,00,000 | 8,00,000 ₹8,00,000 |
| 1.01Pumping Machinery installed for Ph-I stage 1). | ||||||
| 1.02Pump Detail (i) Pump Make = Kirloskar set 2 x 10 = 20 HP (one act as stand by), Discharge = 9.11 LPS, Total Head 48.28 Mtrs., Rising Main 150 mm dia Pumping Hours 8 to 10 Hours | ||||||
| 1.03Pumping Machinery installed for Ph-II). | ||||||
| 1.04Pump Detail (i) Pump Make = Kirloskar set 2 x 50 = 100 HP (one act as stand by), Discharge = 9.11 LPS, Total Head 183.23 Mtrs., Rising Main 150 mm dia Pumping Hours 8 to 10 Hours (Total Working HP =60 HP) | ||||||
| 2.00 | Development of Labour at pump house for oprating pumping machinery & ward and watch of pumping machinery with in 5 mtrs aroung the pump house etc Annexture Attached (A) | 1 | Job | 1,20,000 ₹1,20,000 Lowest | 1,25,000 ₹1,25,000 | 1,35,000 ₹1,35,000 |
Tender Value
₹8.4 L
EMD Value
₹16,895
Closing Date
24 Jul 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
Annual running, repair, maintenance and operation of (Pump House) i/c cost of all kinds of Labour for One Year
2026_HPIPH_138982_1
SHP/KNG15-754/EA-I/NIT/2026- 3402-51 dt 13/07/2026
Open Tender
Civil Works
Lump-sum
365 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Executive Engineer
₹16,895
28 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
14 Jul 2026 - 24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and Maintenance of water supply scheme as a whole including cost of all labour to be deployed i.e. Pump Operator, Chowkidar, Beldar, Fitter or any other skilled/un-skilled labour contigent to the work, watch and ward of all departmental assets, treatment of water as per manual of CPHEEO/IS code and specification, maintenance of source, regarding running of pumping machinery. The job shall include cost of all major, minor repairs of pumping machinery and electrical installation such as rewinding of motors, lubrication, replacement of impeller,Kit kat, HRC fuses gland dori and other essential items required etc. required for repair during the sudden shut down of pumping machinery as per direction of Engineer-in-charge. | 1 | Job | - | - |
| 1.01 | Pumping Machinery installed for Ph-I stage 1). | - | - | - | - |
| 1.02 | Pump Detail (i) Pump Make = Kirloskar set 2 x 10 = 20 HP (one act as stand by), Discharge = 9.11 LPS, Total Head 48.28 Mtrs., Rising Main 150 mm dia Pumping Hours 8 to 10 Hours | - | - | - | - |
| 1.03 | Pumping Machinery installed for Ph-II). | - | - | - | - |
| 1.04 | Pump Detail (i) Pump Make = Kirloskar set 2 x 50 = 100 HP (one act as stand by), Discharge = 9.11 LPS, Total Head 183.23 Mtrs., Rising Main 150 mm dia Pumping Hours 8 to 10 Hours (Total Working HP =60 HP) | - | - | - | - |
| 2 | Development of Labour at pump house for oprating pumping machinery & ward and watch of pumping machinery with in 5 mtrs aroung the pump house etc Annexture Attached (A) | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Form6and12.pdf
Tender Documents • 1.18 MB
BOQ_205857.xls
BOQ • 0.23 MB
Termsandconditions.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .