EXECUTIVE ENGINEER-II, PWD
RANCHI ROAD, PURULIA
Reconstruction of damage intercompound wall of Raghunathpur Sub Division office, PWD in the district of Purulia during the year 2026-2027
2026_WBPWD_5076064_2
WBPWD/NIET-13/EE-II/PRL/26-27
Open Tender
CIVIL WORKS
Percentage
Purulia
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,651
Yes
28 Sept 2026
28 Sept 2026
16 Oct 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
1) With cement mortar 1:4(1 cement : 4 fine sand) | 129.6 | Sq.M | 547.4 | ₹70,943.04 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
1) All kinds of soil. | 48.8 | Cu.M | 260.3 | ₹12,702.64 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 16.27 | Cu.M | 196 | ₹3,188.92 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.15 | Cu.M | 6,812 | ₹41,893.8 |
| 4.01 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.93 | Cu.M | 7,878.5 | ₹70,355.01 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
2) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.86 | Cu.M | 9,045.75 | ₹53,008.1 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
2) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 2.76 | Cu.M | 10,852.95 | ₹29,954.14 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.42 | Cu.M | 11,505.5 | ₹50,854.31 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for
1) Foundations, footings, bases of columns, etc. for mass concrete | 35.95 | Sq.M | 392.15 | ₹14,097.79 |
| 8.01 | 6) Columns, Pillars, Piers, Abutments, Posts and Struts | 57.15 | Sq.M | 961.3 | ₹54,938.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
2911.pdf
Tender Documents • 0.51 MB
BOQ_5168386.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .