Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.3 L
EMD Value
₹50,000
Closing Date
11 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
O/o Executive Engineer Generation Division Vydyuthibhavan Thrissur 680004
Repairing and restoring original condition of Ogee spillway at Adyanpara SHEP
2026_KSEB_891125_1
04/25-26/EE/GD/TSR/21.11.2026
Open Tender
Civil Works - Others
Percentage
90 days
Adyanpara Nilambur
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,900
₹50,000
23 Nov 2026
23 Nov 2026
16 Dec 2026
23 Nov 2026
11 Dec 2026
25 Nov 2026
25 Nov 2026 - 10 Dec 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chipping of unsound/weak concrete material from slabs, beams, columns etc.with manual Chisel and/ or by standard power driven percussion type or ofapproved make including tapering of all edges, making square shoulders ofcavities including cleaning the exposed concrete surface and reinforcementwith wire brushes etc. and disposal of debris for all lead and lifts all completeas per direction of Engineer-In-Charge-25 mm average thickness | 380 | m2 | 120.5 | ₹45,790 |
| 2 | Removing of boulders from the downstream side of weir using Hydraulic excavator(3D) including cost of driver and fuel charges | 56 | Hrs | 1,393.14 | ₹78,015.84 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m,
All kinds of soil | 60 | m3 | 144.97 | ₹8,698.2 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.
Hard rock (blasting prohibited | 6 | m3 | 1,364.1 | ₹8,184.6 |
| 5 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 50 | Hrs | 317.38 | ₹15,869 |
| 6 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.-Bars upto 12 mm diameter | 40 | meter | 7.67 | ₹306.8 |
| 7 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | 20 | meter | 15.35 | ₹307 |
| 8 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth upto 400mm in RCC beams, lintels,columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.-Upto and including 8mm dia. | 1,005 | holes | 167.52 | ₹1,68,357.6 |
| 9 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.
SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 410 | m2 | 135.6 | ₹55,596 |
| 10 | Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in-Charge.<br> (The payment shall be made on the basis of actual weight of approved grout injected.)
Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/ RCC work | 50 | kg | 118.44 | ₹5,922 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tenderdocuments.pdf
Tender Documents • 0.83 MB
BOQ_1524395.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .