Tender Value
₹30.3 L
Closing Date
7 Oct 2021, 4:00 pmClosed
Executive Engineer ED Baramula
Executive Engineer ED Baramula
Provision for improvement of HT/LT and creation Augmentation of transformer (DDC Constituency Wagoora) Under District Capex (DDC Grants)
2021_PDD_141568_1
EDB/122
Open Tender
Electrical Works
Turn-key
45 days
Provision for improvement of HT/LT and creation Au
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,100
Executive Engineer ED Baramula
Exempted
20 Oct 2021
27 Sept 2021
9 Oct 2021
27 Sept 2021
7 Oct 2021
28 Sept 2021
27 Sept 2021 - 28 Sept 2021
Supply, Unloading at Divisional Stores of 11/0.433KV,63 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2
Supply, Unloading at Divisional Stores of 11/0.433KV100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2
Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 9 Mtr. Long Pole(ST-410 SP33) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long )
Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 8 Mtr. Long Pole(SP15) with planting depth of 1/6 the of the height of the pole, (8 mtr. Long )
Supply,Carraige upto site, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor)
Supply,Carraige upto site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor)
Supply, Carriage up to site, and fixing of GI channel iron X arm 9' long 100X50X6mm including suitable clamp & collars as per REC Standards (32.00 kg/No.)
Supply, Carriage up to site, and fixing of GI channel iron X arm 9' long 75X40X6mm including suitable clamp & collars as per REC Standards (22 kg/No.)
Supply, Carriage up to site, and fixing of GI V-Cross & F-Top duly fabricated as per REC Standards including clamps(50x6 mm) & GI Nuts & Bolts (19 kg/No.)
Supply, Carriage up to site, and fixing of GI Anglel iron 9' long 50X50X6mm including suitable clamp & collars as per REC Standards (16 kg/No.)
Supply, Carriage up to site, Installation, testing and Commissioning of danger Plates
Supply, Carriage up to site, Installation, testing and Commissioning of 11 KV Disc Insulators (Polymer) with fittings (45KN)
Supply, Carriage up to site, Installation, testing and Commissioning of 11 KV Pin Insulators (Polymer) with Pins (5KN)
Supply, Carriage up to site, Installation, testing and Commissioning of 11 kV G.O AB Switch , 3-phase, 3 pole 400A polymer Stn. Type
Supply, Carriage up to site, Installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3phase 400A polymer Stn. Type
Supply, Carriage up to site, Installation, testing and Commissioning of LT Fuse Sets (Pre-fabricated)
Supply, Carriage up to site, Installation, testing and Commissioning of Gapless Surge Arrestor,9 KV ,10 KA ,LA with Porcelain Stn. Type
Supply, unloading at Divisional stores 1.1 KV grade, 185 sq-mm 1-core PVC Cable
Supply, unloading at Divisional stores of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
Supply, Carriage up to site, Installation, testing and Commissioning of GI, LT Structure Mukhi type(with Shackles) (50x6 mm) as per REC Standard
Supply, Carriage up to site, and fixing of Galvanised nuts and bolts of sizes
Supply, Carriage up to site, Installation, testing and Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2 Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Providing, carriage, transportation, Installation etc. Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm for connection of transformer body, G.O Set & lightening arrestor Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover.
Providing, carriage, transportation, Installation etc. of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole (Pit 600x600x1600 mm) for 9 MTR ST Pole
Earthing Complete by GI Rod 20mm 2.5 mtr long through GI Strip as per REC Standard.
Providing & Painting of Poles with one coat of Red Oxide and two coats of aluminium paint
Supply, Carriage up to site, Installation, of Sign Board (2X2 feet) incorporating substation information along with required accessories like clamps, nuts and bolts etc.
ARISE ENGINEERING WORKS
TRUE CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .